A high-end Office building? Construction organization scheme of decoration works
According to the requirements of the bidding documents and design drawings, the main construction contents of each sub part of the project are: 1. Large area Lesilon aluminum plate ceiling, light steel keel gypsum board ceiling, local wooden keel wood ceiling and mineral wool board ceiling on the third floor of the ceiling project. 2. Wall and column surface engineering light steel keel partition construction, stainless steel frame glass partition, stone dry hanging facing, sound-absorbing board facing, wall facing brick, wood facing, wallpaper pasting, etc. 3. Stone, floor tile, rubber plate laying and carpet laying construction of floor works 4. Fabrication and installation of wooden doors and glass doors for door and window works. 5. Fabrication and installation of light trough, cabinet, door pocket line/solid wood line, curtain box and other wood products. 6. Paint engineering ceiling, wall and column surface putty emulsion paint, wood skirting paint, wood finishing paint, wood door paint, wood door jamb paint and fireproof paint construction during construction. 7. Water and electricity installation works: concealed laying of water and electricity pipelines and installation of lamps, sanitary wares and panels.