A municipal road and drainage works Supervision planning
The southeast of the main urban area of ×× is the gateway for ×× to enter the Yangtze River and the Yangtze River Delta. The ×× startup area covers an area of 5154 mu. The scope of this project is divided into two sections, A and B, with a total of 8 roads. Bid section A: x road (x 1 road - ab avenue) pavement works, 702m long, 40m red line, stake number K0+035.378 - -- K0+738.021; B Second Road (a First Road - ab Avenue) is 884 meters long, the red line is 40 meters, and the stake number is K0+035.375 - -- K0+919.290; B The second road (* * road -- * * road) pavement works, with a total length of 1046 meters, a red line of 50 meters, and a stake number of K0+035.5 -- K1+082.397; Bid section B: the total length of * * Road (a First Road - ab Avenue) pavement works is about 644 meters, the red line is 60 meters, and the stake number is K0+000 - -- K0+644.368; A The total length of the First Road (* * Road - * * Road) pavement works is about 1096 meters, the red line is 60 meters, and the stake number is K0+030 -- K1+125.907** The total length of the road (a 1st Road - ab Avenue) platoon project is 1024m, the red line is 50m, and the stake number is K0+038.04 --- K1+061.736; The type of road cross section is multi width road; Centerline (median), express lane, motorway and non motorway separator, non motorway and sidewalk. The structural layers of the carriageway road are: lime soil subbase, water stabilized base and asphalt concrete surface. The structural layers of non motorway roads are: lime soil subbase, water stabilized base course, asphalt concrete surface course. The structural layer of sidewalk: lime fly ash base course, cement mortar bonding layer, New Zealand floor tile.