The mileage range of this section is K18+389.6 ~ K20+620.2. The line in this section is arranged along the existing railway, with totally enclosed double track. The total length of the line is 2230.6 meters, including 525.9 meters of overhead line and 1374.4 meters of ground line. It mainly includes Huilongguan Station, Huilongguan East Station, Huangtulian Viaduct, Huangping East Road Bridge, retaining wall, and line subgrade (including two box culverts and one garden culvert). The project structure is a single-layer multi span cast-in-place reinforced concrete frame structure, which adopts bored pile foundation. The canopy above the platform is a light steel structure.

 Urban Light Rail Project Construction Organization Design Proposal - Figure 1

Urban Light Rail Project Construction Organization Design Proposal - Figure 1

 Urban Light Rail Project Construction Organization Design Proposal - Figure 2

Urban Light Rail Project Construction Organization Design Proposal - Figure 2

 Urban Light Rail Project Construction Organization Design Proposal - Figure 3

Urban Light Rail Project Construction Organization Design Proposal - Figure 3

 Urban Light Rail Project Construction Organization Design Proposal - Figure 4

Urban Light Rail Project Construction Organization Design Proposal - Figure 4

 Urban Light Rail Project Construction Organization Design Proposal - Figure 5

Urban Light Rail Project Construction Organization Design Proposal - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

  • Construction organization of decoration works design scheme book
    The production and installation of all kinds of suspended ceilings in the woodwork project, the production and installation of wooden doors, wooden door covers and lines, the installation of light steel keel paper faced gypsum boards, wood base and panels on the top, the production and installation of all kinds of plastic aluminum plates, aluminum plates, stainless steel plates, stainless steel bars, glass partitions, the production of cabinets and cabinets, the production of flooring, carpets, lamp troughs, curtain boxes, etc.
  • Construction organization of a community project design scheme book
    Building 1 of a community is located at No. 15, a certain road in a certain district of Beijing, facing a certain road in the east, a company office building in the north, and a center in the west. The construction site is narrow, and the "three supplies and one leveling" is basically completed. The basement of the project includes underground garage, underground corridor, staff canteen, kitchen, auxiliary room and equipment room, civil air defense project, and the aboveground part mainly includes lobby, business, office room, duty room, business hall, exhibition hall, lobby, apartment, etc. The total construction area of Building 1 in a community is 43868m2, including 32954m2 above the ground, 8019m2 underground and 2895m2 civil air defense. There are 17 floors underground and 17 floors above the ground, and 19 floors locally, with ± 0.00 absolute elevation of 52.500. Eave height is 59.6m.
  • Construction organization of a residential project design scheme book
    This project is a residential building. The east-west axis 1 to 21 of Building 4 # is 36.0m long, and the north-south axis A to E is 12.0m wide. The basement floor height is 4.6m; The east-west sunny axis of Building 6 # is at least 66.59m long, and the north-south A-axis to E-axis is 11.4m wide. Eaves are 18.4m high and the highest elevation of the building is not 21.8m. The ± 0.000 elevation of the project is equivalent to the absolute elevation determined by the site, and the indoor and outdoor elevation difference is 300mm. The project adopts brick concrete structure, and is designed as per 6 degrees of fortification and four levels of seismic resistance. The project adopts reinforced concrete and rubble concrete strip foundation. The base elevation is ― 25m and ― 33m.
  • Urban elevated construction organization design scheme book
    The project is located in the urban and rural fringe of Shanghai's central city. It is a fast ring trunk road that connects the new development zone, industrial zone, port, airport and residential area, strengthens the traffic connection between Pudong and Puxi, and connects the radioactive roads of the city. It is the most basic framework of the urban fast trunk road network. The project is located in the outermost part of the central city. From the perspective of the overall urban planning layout, it is the basic control range of urbanization development. The project starts at stake 15+000 in the west and ends at stake 16+000 in the east.
  • Construction Organization Design of a Urban Light Rail Project
    This document is the construction organization design of urban light rail project, including the catalog and detailed description. It is complete and has reference value, and can be downloaded for use.
  • Construction organization design of urban light rail project
    The effective platform center mileage of the station is K18+450.000, and the total building area is 6968.68 m2. It is a two-layer, double island, three line station with a total length of 120.8 m, a total width of 27.8 m and a height of 9.365 eaves. There are two floors above the ground. The first floor is the station hall floor, and the second floor is the platform floor. There are two platforms in total.
  • Construction organization design of urban light rail project/
    1. Bidding Documents, design drawings and Q&A materials of Bid Section 07 issued by Beijing Urban Railway Co., Ltd. 2. Relevant national and Beijing laws, regulations, rules and technical standards; 3. Construction experience of previous similar projects and our existing technical equipment and mechanical construction capability; 4. Construction engineering, railway engineering, highway engineering and other relevant specifications and standards; 5. Site investigation
  • Construction organization design of urban light rail project
    Construction organization design of urban light rail project Construction organization design of urban light rail project Construction organization design of urban light rail project Construction organization design of urban light rail project
  • Construction organization design of urban light rail project
    This section is the * * section of the entire urban railway project from XX to XX, with the mileage range of K18+389.6 to K20+620.2. The line in this section is arranged along the existing railway, with totally enclosed double track. The total length of the line is 2230.6 meters, including 525.9 meters of overhead line and 1374.4 meters of ground line. It mainly includes Huilongguan Station, Huilongguan East Station, Huangtulian Viaduct, Huangping East Road Bridge, retaining wall, and line subgrade (including two box culverts and one garden culvert).
  • Construction organization of light rail project design scheme
    This section is the * * section of the entire urban railway project from XX to XX, with the mileage range of K18+389.6 to K20+620.2. The line in this section is arranged along the existing railway, with totally enclosed double track. The total length of the line is 2230.6 meters, including 525.9 meters of overhead line and 1374.4 meters of ground line. It mainly includes Huilongguan Station, Huilongguan East Station, Huangtulian Viaduct, Huangping East Road Bridge, retaining wall, and line subgrade (including two box culverts and one garden culvert).
  • Construction organization of a certain institute design scheme book
    The domestic water supply systems of apartment buildings 1 #, 2 # and 3 # are basically the same. The water source of the water supply system of this project is the municipal water source, and the water supply pressure is 0.225Mpa. The water supply system is divided into two zones. The four floors of the low zone are directly supplied by the pipe network, and the high zone is supplied by the variable frequency water supply unit of the water supply pump room.
  • Construction organization of an office building project design scheme book
    The interior wall decoration of the building is mostly milky white latex paint paint, the exterior wall decoration is face brick, the floor tile is floor tile, the roof is three felt and four oil waterproof layer, most doors and windows are U-PVC plastic doors and windows, and a small number of wooden doors and windows.
  • Construction organization of a frame project in Hanbei design scheme book
    The project is a six storey frame structure, manual hole digging pile foundation, with a building area of 4737.48 square meters. The planned commencement date is August 1, 2007 (the actual commencement date is subject to the commencement notice issued by Party A). The total construction period is controlled to be 240 days (calendar days). The building elevation is ± 0.000, which is the absolute elevation; The building height is 19.30M; The number of building floors is 6+1; The reasonable service life of the house is 50 years; The safety level of the building structure is Level II; Building structure form: frame; The roof waterproof grade is Grade III; The waterproof layer has a service life of 10 years, and the fire resistance rating of the building is Grade II; The seismic fortification intensity is 6 degrees. All the frame infilled walls of the project are built with 150 and 250 thick MU5 fly ash blocks with Mb5 mixed mortar. The wall body masonry shall be constructed according to the relevant block construction specifications. The junction between the wall and the reinforced concrete column shall be tied with steel bars.
  • Construction organization of complex building project design scheme book
    The project is 61.6m long and 16.3m wide, with a total building area of 2729.8m2. The structure is a cast-in-place frame. The number of floors is: the main body has four floors, the floor height is 3.5m for the first floor, and 3.3m for the second four floors. The cast-in-place roof has a total eaves height of 13.4m, and the height difference between indoor and outdoor is 450mm. The project adopts independent foundation under column and cast-in-place frame structure. The seismic fortification intensity of the project is 7 degrees.
  • Project Construction Organization of Grand Hotel design scheme book
    The project of the Grand Hotel is close to Nanlong Highway, and the traffic is very convenient. Three supplies and one leveling have been completed, and the site is relatively open. The plane geometry of the hotel is in the shape of "square", with the east-west length of 40.27m and the north-south length of 38.08m; The east wing is of frame structure, and the west wing is of mixed structure, with five floors in total. The floor height of the frame part is 3.8m, the floor height of the mixed structure part is 3.2m, the indoor and outdoor height difference is 0.6m, and the total height is 89m (from the outdoor terrace to the cornice elevation); The building area is 7899.78 square meters. The project is divided into two parts: the east side house and the west side house. The east side house is a four story frame structure, and the west side house is a five story mixed structure. The design seismic fortification intensity is 7, and the construction site is classified into three categories.
  • Construction organization of a building project design scheme book
    The second underground floor is the garage, the storeroom of the farmers' market, the fire pool, the power distribution room, etc. The first underground floor is the farmers' market. For the external decoration of the project, granite columns are hung on the columns of the first floor underground, stone island red granite is hung on the walls of the first and second floors, 100 × 100 colored tiles are used on the external walls, all windows are VPVC windows, and the glass is light gray hollow coated glass windows (mall windows). The first floor underground is 10 thick top hung concealed frame coated glass windows, and gray glass curtain walls are used on the middle aisle and the third floor facade, The roof is sloped with hydrophobic expanded perlite block insulation materials, EPDM waterproof materials, and floor tiles are beautified.
  • Construction organization of general plant engineering design scheme book
    The project consists of 50 # plant, 51 # good plant, guard room and pump room, with a total construction area of 21874.83m2. The 50 # and 51 # power houses are six and seven storey R. C frame structures respectively. The foundation is R. C precast pile. The foundation and superstructure of independent cushion cap are cast-in-place R. C, with plane dimensions of 74.58 × 20.7m and 67.40 × 31.28m, column spacing of 6.0m, height of 32.7m and 33.5m, seismic intensity of 7 degrees, and structural seismic grade of III. The roof is APP polymer waterproof coiled material, and R · C prefabricated board is paved on it. The gutter is equipped with a water falling system. The floor is made of artificial marble, anti-skid floor tiles and fine stone concrete surface. The external wall is faced with glass mosaic, the internal wall is latex paint and color tile wall, and aluminum alloy doors and windows.
  • Construction organization of Phase I project of the Center design scheme book
    The exhibition center has a superior geographical location and extremely convenient transportation. It is about 1km away from the downtown of xxx in the south, 3km away from the Xingang Wharf of xxx in the east, 3km away from the xx Wharf in the west, and more than 10km away from the Haikou Station of xx railway channel and the automobile ferry wharf in the west. It is also connected by Haikou Binhai Avenue and its extension lines, which are 60m and 50m long. In addition, urban secondary trunk roads are planned and constructed in the east and north of the exhibition center, It is conducive to the traffic organization of people and vehicles. The project is a class I large public building with a total construction area of 70000 square meters. It is planned to be implemented in three phases as required. The construction scale of Phase I is 1000 international standard booths, with a construction area of 25000 square meters. This bidding is a phase I project, with a total land area of 4.14 hectares. The pile foundation of this project is pre-stressed concrete pipe pile. There are one underground floor and three above the ground floors locally. The building cornice is 17.5m high and 200m long in total. The construction scope of the first phase project includes: the main building of the exhibition center and its auxiliary structures within the construction land of the first phase project; The corridor and platform between the main building and the Great Hall of the People, and the temporary outdoor parking lot on the land for Phase II project. The upper structure is a frame structure. The second and third floors are 18 × 15m column grids. The main beam is a multi span two-way post tensioned bonded prestressed reinforced concrete frame beam. The secondary beam is an unbonded prestressed concrete beam. The roof is a steel grid structure with a profiled steel plate roof. The lower part of the pedestrian platform is reinforced concrete, and the upper part is steel structure. The anti cracking degree of the building is 8, the seismic grade is Level II, and the axial compression ratio of the control column is less than 0.8.
  • Construction organization of tower high-rise project design scheme book
    Geographic location and three party introduction The new city K115 area is located in the new city development zone of Huaxia downtown. The project is located in the high-rise residential buildings in the K115 area, west of the site. It is built by Huaxia Development Company, loaned by the World Bank, designed by the Development, Design and Research Institute. The eighth project management department of Huaxia No. 4 Urban Construction Company is responsible for the construction. The structural construction is planned to start in early October 1998, and completed at the end of December 1999, The planned construction period is 450 days, including 60 days for foundation works, 210 days for main structure (later decoration works) and 180 days for decoration works.
  • Construction organization of a river training project design scheme book
    Dongtai River Regulation Project in Beilun District is located in Beilun urban area, with a total length of 6275 meters. The renovation contents include: dredging of the whole line, bank foundation treatment, bank wall masonry, local bending and straightening. The project is divided into four sections: Section I (stake No. 0+000~1+917); Section II (stake No. 1+917~3+710.5); Section III (chainage 4+242.5~5+568); Section IV (stake No. 5+568~6+807); Our bidding section is the fourth section, with a total length of 1239m.
  • Construction organization of a road ditch project design scheme book
    A ditch project in the north section of a road (connected to Huanshi North Road) is located between a certain project in the north of the d city river and Huanshi North Road (south of Yunxing Wholesale Market). The construction unit of the project is d City Urban Construction Planning Bureau, the design unit is d Architectural Design Co., Ltd., the supervision unit is d Construction Supervision Co., Ltd., and the quality supervision unit is d City Municipal Garden Quality and Safety Supervision Station, The construction unit is d City Construction Engineering Co., Ltd., the project cost is about 750000 yuan, the commencement date is July 30, 2005, the completion date is September 30, 2005, and the contract period is 60 days. The total length of this project is 291m (151m rectangular ditch with B × H = 3.0 × 1.6m, 65m stone arch culvert ditch with B × H = 3.0 × 1.6m, and 75m φ 700 circular pipe drainage ditch), of which the excavated earthwork is lotus pond sludge, the gravel cushion is 15-20cm, the cast-in-place C20 concrete ditch bottom plate and ditch cover plate are about 420m3, and the masonry of MU30-MU40 stone walls and arches is about 700m3. The existing underground pipelines shall be protected during construction. All materials for this project are purchased by the construction unit itself. The concrete technology uses on-site mechanical mixing, and the reinforcement is fabricated on site. The construction machinery transportation tools and labor force are allocated and balanced by the construction unit according to the project construction schedule, so as to ensure that the construction plan is orderly and the project is completed on time with quality and quantity guaranteed.
  • Construction organization of a complex building project design scheme book
    The ground floor of the project is a facade. The 2-4 floors are a fund-raising building composed of two units AB, with a floor height of 3 meters, a total height of 12.6 meters, a rectangular shape, 32.1 meters long and 16.2 meters wide. The ground floor has a building area of 574.22 square meters, a standard floor of 530.78 square meters, and a total building area of 2166.56 square meters. The project is a brick concrete structure, with MU7.5 ordinary bricks and M5 mortar masonry. The foundation adopts manual hole digging piles. The hole digging piles are equipped with connecting ground beams, precast concrete hollow slabs and roof panels. The main beams, columns, toilets, kitchen and toilet boards are cast-in-situ concrete. The lintels of doors and windows are prefabricated. The reinforcement shall be grade I and II steel, the beam column of the protective layer shall be 25, the concrete and concealed column shall be 20, the slab shall be 15, and the C25 concrete shall be used.
  • Construction organization of building 1 in a community design scheme book
    Building 1 of a community is located at No. 15, a certain road in a certain district of Beijing, facing a certain road in the east, a company office building in the north, and a center in the west. The construction site is narrow, and the "three supplies and one leveling" is basically completed. The basement of the project includes underground garage, underground corridor, staff canteen, kitchen, auxiliary room and equipment room, civil air defense project, and the aboveground part mainly includes lobby, business, office room, duty room, business hall, exhibition hall, lobby, apartment, etc. The total construction area of Building 1 in a community is 43868m2, including 32954m2 above the ground, 8019m2 underground and 2895m2 civil air defense. There are 17 floors underground and 17 floors above the ground, and 19 floors locally, with ± 0.00 absolute elevation of 52.500. Eave height is 59.6m.
  • Construction organization of outdoor works design scheme book
    This project is an outdoor project of a hotel, mainly including the laying of outdoor pipe trenches, water heating and electrical pipelines, outdoor roads, fences and flower beds. Civil works include: pipe trench earthwork excavation and backfilling, cable well, granite ground laying, flower bed and wall masonry, iron installation, etc. The water heating content includes: laying of water pipes, domestic hot water pipes, fire water pipes, air conditioning water pipes, spray water pipes, heating water pipes, as well as pressurization, flushing and water testing of various pipes; Thermal insulation, anti-corrosion, protection, etc. required by the design. Strong current construction includes: cable laying.
  • Construction organization of Sifang Machinery Plant design scheme book
    The project is located in the northwest of the plant area of Sifang Locomotive and Rolling Stock Plant, including the steel structure maintenance workshop with a span of 15m; The span of special vehicle maintenance workshop is 15m; General assembly workshop. The general assembly workshop includes three spans with a span of 22.5m; 22.5m; 15m。 The plant of the project is 90m long and 60m wide (axis), with a total building area of 5521m2. Building and structure: the main body is light steel structure, the roof is profiled steel plate, the wall is brick masonry enclosure, the foundation is independent foundation concrete C20, the cornice height is 10.5m, the column spacing is 7.5m, the roof slope is 5%, the relative elevation ± 0.000 is equivalent to the absolute elevation+9.270m, and the seismic intensity is 7 degrees.
  • Construction organization of residential building project design scheme book
    The project is located in Sanjiao New Village (Xujiapeng Section of Youyi Avenue) in Wuchang, which is composed of several buildings, of which 4 # building has a building area of 3760 square meters. The building grade is Grade II, the fire resistance grade is Grade II, the seismic design and anti cracking degree is 6 degrees, and the design reasonable service life is 50 years. The structural form is full cast-in-place frame special-shaped column structure, and the roof is Grade II waterproof roof with a durability of 15 years; The building has six floors, with a storey height of 2.8m and eaves height of 17.4m. The indoor ± 0.000 of the project is equivalent to the absolute elevation of 21.95M, the overall height of the building is 17.4M, the seismic fortification intensity of the building is six degrees, the safety level of the building structure is Level II, and the importance of the building is Class C. The construction site is classified as Class II, and the site soil type is medium soft site soil. The strength grade of concrete is C10 for foundation cushion, C25 for foundation beam, superstructure beam and slab, and C30 for frame column. Grade I and II reinforcement shall be adopted. Masonry: MU10 autoclaved fly ash and M5 cement mortar are used for masonry below+0.300M, and aerated concrete blocks with dry unit weight not greater than 5.5KN/M3 and M5 mixed mortar are used for masonry of frame infilled walls above+0.300M; The external wall and household wall are 250 thick, the internal wall is 200 thick, and other kitchens and toilets are 125 thick.
  • Construction organization of complex building project design scheme book
    Building overview: the ground floor of the project is a facade, and the 2 – 4 floors are a fund-raising building composed of two units AB, with a floor height of 3 meters, a total height of 12.6 meters, a rectangular shape, 32.1 meters long and 16.2 meters wide. The ground floor area is 574.22 square meters, the standard floor area is 530.78 square meters, and the total building area is 2166.56 square meters. The project is a brick concrete structure, with MU7.5 ordinary bricks and M5 mortar masonry. The foundation adopts manual hole digging piles. The hole digging piles are equipped with connecting ground beams, precast concrete hollow slabs and roof panels. The main beams, columns, toilets, kitchen and toilet boards are cast-in-situ concrete. The lintels of doors and windows are prefabricated. The reinforcement shall be grade I and II steel, the beam column of the protective layer shall be 25, the concrete and concealed column shall be 20, the slab shall be 15, and the C25 concrete shall be used.
  • Construction organization of Wandeju Project design scheme book
    Wandeju Project is located in the southeast of Wande Building, No. 1019, Shennan Middle Road, Futian District, Shenzhen, and the southwest of Hongling Building. It is a 32 storey high-rise residential tower with one staircase and eight households. The first floor above the ground is equipped with an overhead floor and platform, and the second to thirty second rooms are residential buildings with gardens on the roof; There is a garage on the second floor underground, and a connecting channel is set with the garage on the second floor underground of Wande Building. The first floor underground is partially a pool and equipment room, and the second floor underground is partially a combination of peacetime and wartime room (wartime civil air defense basement).
  • Construction organization of an outdoor project design scheme book
    This project is an outdoor project of a hotel, mainly including the laying of outdoor pipe trenches, water heating and electrical pipelines, outdoor roads, fences and flower beds. Civil works include: pipe trench earthwork excavation and backfilling, cable well, granite ground laying, flower bed and wall masonry, iron installation, etc. The water heating content includes: laying of water pipes, domestic hot water pipes, fire water pipes, air conditioning water pipes, spray water pipes, heating water pipes, as well as pressurization, flushing and water testing of various pipes; Thermal insulation, anti-corrosion, protection, etc. required by the design. Strong current construction includes: cable laying.
  • Construction organization of gas engineering in a city design scheme book
    The pipeline gas project in a city is an urban pipeline gas project approved by our province, relevant departments and the people's government. The annual gas supply capacity is 14 million cubic meters, covering the urban planning area of the city. The medium in the pipeline is natural gas. The municipal pipeline gas project consists of two parts, the gasification station part and the urban pipe network part, and the urban pipe network part includes the household project. The construction of the city's pipeline gas project is the first natural gas project in our province, which will have a significant impact and far-reaching significance on the development of natural gas in our province. This project is a medium pressure gas pipeline project. It starts from the natural gas valve station on the west side of Yingbin Avenue, runs eastward along the south side of Yingbin Avenue, passes through Yongfeng Road, Youzhuang Road and Huancheng South Road from Huancheng West Road, and then runs along Hongzhou along Yingbin Avenue to Ningbo Road; The pipeline runs from Qingping South Road to Hongzhou Road along Ningbo; Along the west ring of the city, the route is from Yongfeng Road to the ring of the city, then from Huancheng Road to Yingpan West Road along Mall Street, from Mall Street to Shaoshan North Road along Yingpan West Road, from Shaoshan North Road to Wenhua North Road along Yingpan East Road, and from Yingpan East Road to Beijing East Road along Wenhua North Road, as well as the residential and commercial users covered. The design pressure of the pipeline is medium pressure Class A 0.3MPa (gauge pressure). The total length of the trunk line is 15.13km, and SDR11 polyethylene pipeline is selected, of which the length of the pipeline with a diameter of de 250 × 22.7 is 0.95km; The pipeline length of de 200 × 18.2 is 10.31 km, and the pipeline length of de 200 × 18.2 is 0.95 km. The standard is GB/15558.1-1995, and the polyethylene pipe fittings of GB/15558.2-1995 are selected as the pipe fittings; Q235B steel pipe with a length of 2941m is selected for crossing and the first branch line. The work quantity of the household is to be determined because there is no design drawing.
  • Construction organization of a greening project design scheme book
    This project is a separate greening project, with long route, great construction difficulty, high quality requirements, and accurate design style. There are many varieties of seedlings planted, with high technical requirements for planting, strong professionalism, and strong interspersed engineering construction. Green planting: divided into four parts: planting environment treatment, green lofting, seedling selection and planting, and maintenance. The arbors in this project are the main landscape trees in the green space, and the quality of planting will directly affect the landscape effect of the green space.
  • Construction organization of an environmental improvement project design scheme book
    The environmental improvement project of a project is located in Keqiao, which is planned and constructed by a county public city construction investment and development company, and designed by a county urban planning and design institute. The total construction area is 21000 square meters. The main contents of the project include retaining walls of river banks, river ports, garden roads, fences, steps, racks, garden ornaments, water supply pipelines, lighting power, landscaping, etc. The plane of the environmental improvement project of a project is in a belt shape along the Zhedong Canal, with a total land area of 21000 square meters. The project adopts relative coordinate system for positioning. The 0 and 0 points are led out from the enclosure of the passenger transport center, and the included angle between the positive direction of the x axis and the positive north axis is 28.32 degrees. The cross slope of the road is 1.5%. When the one-way ramp intersects with the two-way ramp, the two-way ramp is used as the control. When the secondary road intersects with the main road, the main road is used as the control in principle. All roads shall collect water according to the longitudinal slope direction, without water condensation. Curbs are set on both sides of the road, and greening is set outside the curb. The greening elevation is about 5cm lower than the top elevation of the curb. A horizontal expansion joint is set every 30 meters on the garden road. Green planting reflects the style and features of a certain water town and imitates the growth effect of natural forest belt. Large areas of open areas are planted with colored leaves, flowering trees and clusters. The planting soil shall be organic soil with uniform soil texture and sufficient base fertilizer shall be applied. The ground cover planting soil layer is more than 40cm, the flower shrub and tree planting soil is more than 60cm, and the planting soil is covered with 10cm loess. 0.5% cross slope treatment shall be made at the junction of lawn and road. The layout of the whole green lawn and ground cover plants shall be such that the loess is not exposed to the air, and flowers and trees are clustered to form a dense greening effect.
  • Construction organization of greening works design scheme book
    The foundation shall be constructed with smooth formwork, and the concrete coping shall be made with 40MM thick sheet (L=4M) wood formwork and tensioned with Ф 12 rebar. According to the characteristics of the project, for the greening project, it is considered to carry out civil construction, setting out and positioning first. At the same time, the earthwork shall be reasonably allocated, and then the green land shall be marked, fixed and planted. This project is a separate greening project, with long route, great construction difficulty, high quality requirements, and accurate design style. There are many varieties of seedlings planted, with high technical requirements for planting, strong professionalism, and strong interspersed engineering construction.
  • Construction organization of sewage interception works design scheme book
    This contract section is the first bid section of Shanghai Suzhou Creek Tributary Sewage Interception Project, which includes two major parts: sewage intercepting header works and regional sewage collection system works. The sewage intercepting main works include: sewage intercepting main pipe and main pipe lifting pump station in North Suzhou; Suzhou Henan sewage intercepting main pipe and main pipe lifting pump station and other main works. The scope of work in this bid section includes the C # pump station project of the sewage intercepting main in the south of Suzhou and the pipeline project of the outer ring road from C # pump station to No. 6 bridge port.
  • Construction organization of pipe jacking works design scheme book
    The Fourth Water Plant covers an area of 119 mu, with a design scale of 200000 tons/day, and 100000 tons/day for Phase I construction. The estimated investment of the water source project is 14.6 million yuan, including the top steel pipe with a diameter of 1.4 m wall, process pipe installation, electrical pipe laying and other projects. Water source project: water intake steel pipe jacking (diameter 1.4m, single length about 800m, wall thickness 14mm, 2 pieces), water intake head, immersed pipe, water intake pump room, process equipment pipeline installation, embedded parts (electrical process, pipeline anti-corrosion, etc.). The proposed site has undulating terrain. The pipeline axis extends from west to east to the water intake pump house at 871.81m. It crosses a dike, a paddy field, a village, a soil road, a pond, a ditch and a paddy field in the middle of the Yangtze River, 2.10m. The river bottom (ZK1 hole) orifice elevation is -8.76m, and the height difference is 20.23m. There is a pond distributed in the middle of the pipeline axis, about 21.00m in width, 4.53m in water surface elevation and 2.00m in water depth. Its geomorphic unit belongs to the Yangtze River floodplain.
  • Complete construction organization of urban light rail project design scheme
    This section is the * * section of the entire urban railway project from XX to XX, with the mileage range of K18+389.6 to K20+620.2. The line in this section is arranged along the existing railway, with totally enclosed double track. The total length of the line is 2230.6 meters, including 525.9 meters of overhead line and 1374.4 meters of ground line. It mainly includes Huilongguan Station, Huilongguan East Station, Huangtulian Viaduct, Huangping East Road Bridge, retaining wall, and line subgrade (including two box culverts and one garden culvert).
  • An urban light rail project organization design scheme
    According to the characteristics of the project, the foundation pit excavation is carried out in two steps. The first step is to excavate part of the soil layer above the ground of the foundation pit. It is proposed to use the method of manual excavation with bulldozers. The second step is to use manual excavation. The excavation should be carried out vertically in strict accordance with the set sidelines to ensure the width and thickness of the lime fly ash gravel cushion under the foundation.
  • Construction Organization of Beijing Urban Light Rail Project design scheme
    Huangtulian Viaduct (K19+334.550 ~ K19+860.450) is 525.9m long. The upper structure is composed of 7 connected 3-span prestressed reinforced concrete continuous beams, and the lower structure is a bored pile foundation with double column piers. The Huangping East Road Monolithic Bridge spans the existing urban roads, with a starting and ending mileage of K20+196.81 ~ K20+275.91. The superstructure is composed of a three span prestressed reinforced concrete continuous beam, and the foundation adopts bored piles and double column piers. The retaining wall is set on the left side of the line, which is fabricated reinforced concrete cantilever shoulder retaining wall. The wall is 3.0m-4.50m high. Culvert includes two box culverts (aperture 1-1.0m), one circular culvert (aperture 1-1.5m), cantilever subgrade retaining wall 212.25m, prefabricated pipe joints for circular culvert, rubble masonry for side wall of box culvert, and cast-in-place reinforced concrete roof. The ground line includes subgrade and culvert works. The subgrade section of the line adopts a triangular road arch with an arch height of 0.2m and a bottom width equal to the width of the subgrade surface. Generally, the slope is taken as 1:1.5. A natural berm with a width of no less than 1.0m is set outside the toe of the embankment slope. The thickness of the surface layer of the subgrade bed is 0.5m, and the thickness of the bottom layer is 1.5m.
  • Construction organization of light rail reconstruction project in a developed city in southwest China design scheme
    According to the design requirements, lime fly ash gravel cushion shall be set at the lower base of the retaining wall. The lime fly ash gravel cushion shall be mixed evenly according to the specified proportion, and filled and compacted in layers. At the same time, the foundation tenon shall be reserved in the cushion strictly according to the design drawings, and the tenon shall be set accurately in size and position