Masonry of an international hotel in a trade city Engineering technology disclose
Plaster the bottom when the wall is wet. Generally, the bottom mortar can be plastered after about 2h of full screeding, that is, neither too early nor too late. When plastering, a thin layer shall be plastered first, and no missing plastering is allowed. The mortar shall be squeezed into the small gap by force. Then, the mortar shall be installed, filed, compacted and trowelled layer by layer until it is level with the standard reinforcement. Then, the large wooden bar or ruler plate shall be used to scrape vertically and horizontally, and the wood trowel shall be used to roughen. Then carry out a comprehensive quality inspection to check whether the bottom ash is flat, whether the internal and external corners are square and tidy, whether the junction between the pipe rear and the internal corner, and the junction between the wall top plate are smooth and flat, and use a 2m long ruler board to check the vertical and flat condition of the wall surface. The internal corners of the wall are pulled up and down with the internal corner puller. The floor skirting board, cement wainscot and the back of pipes shall be cleaned in time.