Special Scheme for Construction Safety Technology of Main Pier Bearing Platform of Super Large Bridge
When the Li Canal Beijing Hangzhou Canal Grand Bridge crosses the Beijing Hangzhou Canal, 100+175+100m partially prestressed low pylon cable-stayed bridge structure is adopted, and the tower beam consolidation and tower pier separation system are adopted. The 24 # and 25 # main piers are located near the revetment of the Beijing Hangzhou Canal. The flow of ships in the two rivers is large, the normal water level is 9.05m, the highest navigable water level is 10.63m, and the current water level is 9.00m. At present, 24 # and 25 # main piers have been filled with earth bag cofferdams, basically meeting the needs of pile foundation construction. Since the bottom elevation of the cushion cap of 24 # and 25 # main piers is 1.13m, and the structural size of a single cushion cap is 13.75m × 17.7m × 4m, four rows and five columns of 20 Φ 1.5m pile foundations are arranged below it. 40+70+44m variable cross-section prestressed concrete continuous beam bridge is adopted when Li Canal Beijing Hangzhou Canal Grand Bridge crosses Li Canal. The left width is 13.5m, which is a single box and single room structure, and the bottom plate is 6.8m wide; The right width is 20m, which is a single box double chamber structure, and the bottom plate is 13.3m wide. The beam at the main pier is 4m high, the beam at the middle of the span is 2m high, and the beam height adopts 1.6 times of parabola transition. The cantilever is 3.35m long, the web is 0.5~0.65m thick, the top plate is 0.28m thick, and the bottom plate is 0.28~0.65m thick. The box girder bottom plate is horizontal, the web is vertical, and the cross slope is adjusted by the web height.