Supervision of turnout laying works Implementation Rules
XX depot and comprehensive base are located at the west side of XX Avenue Station, the terminal station of Line XX, and are mainly responsible for the shop un wheeling repair, regular and temporary repair of the allocated vehicles along the whole line of Line XX, as well as the parking, operation, servicing, train inspection, monthly repair, etc. of the allocated trains in this section. The XX depot is located in the rectangular plot to the east of the planned Guizhou Road, the north of the planned Zhujiang Road, the west of the planned Tibet Road, and the south of the planned Zunyi Road, covering an area of about 36.97 hectares, of which the XX depot of Line XX covers an area of 29.83 hectares, and the rest is reserved for the parking lot of Line 5, about 7.14 hectares. The total length of the entrance and exit section line, the internal line and external line of the testing line is 19106.88m, 42 sets of 50 kg/m steel rail No. 7 single turnout (19 left and 23 right), 2 sets of 50 kg/m steel rail No. 7 turnout 5m spacing crossover (asymmetric type 3 left and 1 right), 2 sets of 60 kg/m steel rail No. 9 single turnout (1 left and 1 right), and the training line includes 1 set of 9 turnout left.