Uploaded on: April 26, 2020 22:33:15
zero
5 points

(1) Determine the division of labor and job responsibilities of the personnel of the project supervision organization; (2) Preside over the preparation of project supervision plan, review and approve the implementation rules of project supervision, and be responsible for managing the daily work of the project supervision organization; (3) Review the qualification of subcontractors and put forward review opinions; (4) Check and supervise the work of supervision personnel, allocate personnel according to the progress of the project, and replace unqualified personnel;

 Project supervision planning of a public project (new) - Figure 1

Project supervision planning of a public project (new) - Figure 1

 Project supervision planning of a public project (new) - Figure 2

Project supervision planning of a public project (new) - Figure 2

 Project supervision planning of a public project (new) - Figure 3

Project supervision planning of a public project (new) - Figure 3

 Project supervision planning of a public project (new) - Figure 4

Project supervision planning of a public project (new) - Figure 4

 Project supervision planning of a public project (new) - Figure 5

Project supervision planning of a public project (new) - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

  • Iron tower construction project supervision plan
    This document is for the supervision planning of the iron tower construction project. It is very valuable for reference and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Road engineering project construction supervision plan
    This document is the construction supervision planning of road engineering projects. It is very valuable for reference and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Supervision details of high-rise building project plan
    This material is a detailed plan for the supervision of high-rise building projects. It is very valuable for reference and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Supervision of prefabricated public buildings plan
    This supervision plan is prepared based on the virtual cast-in-place frame structure and fabricated integral structure housing project, which conforms to the background of the coming architectural revolution in China's construction market. Considering that China's current aging is getting worse and worse, multi-storey residential buildings have no elevators, which can no longer meet the needs of the elderly population for elevator rooms. Therefore, this supervision plan is prepared by combining the cast-in-place structure of frame shear wall and fabricated integral structure of the first floor underground and 11-18 floors above the ground. Some new construction supervision concepts will be introduced for your reference, and please provide guidance.
  • Supervision of new office building decoration works plan
    The decoration project of XXXXXX new office building is located in XXXXXXXX square. The location of the project land is shown in Figure 1-1-1 below: Figure 1-1-1 Schematic Diagram of Project Location 2. Project type The decoration project of XXXXXXX new office building belongs to the indoor and outdoor decoration and decoration project of the office building. 3. Engineering characteristics The decoration project of XXXXX new office building of XXXXX Co., Ltd. is located in XXXXX Square, with a total floor area of about 49000 m2, including the basement basement basement, the first floor shops, 6-15 floors of office buildings, and 35-48 floors of office buildings (including 49 floors of attic). 4. Project content Including decoration engineering, water supply and drainage engineering, strong current engineering, electrical lighting engineering, kitchen engineering, garden landscape engineering, fire engineering, air conditioning and ventilation engineering, intelligent engineering, elevator engineering, structural reinforcement (reconstruction) engineering, floor treatment, wall demolition and garbage removal, elevated floor reconstruction, curtain wall reconstruction, etc.
  • [Sichuan] Old Street Reconstruction Project Supervisor plan
    1. Project name: Old Street Reconstruction Project in xx Town, xx City (Phase II) 2. Project location: xx Town, central district of xx City 3. Design unit: Chengdu xx Construction Engineering Design Co., Ltd. 4. Construction unit: xxxx Real Estate Development Co., Ltd. 5. Construction unit: xxxx Construction Engineering Co., Ltd. 6. Building area: 57224.74 ㎡ 7. Project investment: 80000000 yuan
  • [Yunnan] School agent construction project supervision plan
    Project name: agent construction system project (phase I) of primary and secondary school xx project construction section II xx dormitory and canteen project 1. Construction site: in xx town, xxxx county 2. Construction scale: student dormitory building 326.3m2 canteen 108.92 m2 toilet 88.76 m2 3. Project contract price: 659198.82 yuan Construction unit: xx county education and education bureau
  • Heat supply project supervision of petrochemical company plan
    1. The scope of supervision includes all supervision work in the installation and commissioning stage of boilers, auxiliary equipment and process pipes, and relevant electrical instruments of the heating project, namely quality control, progress control, investment control, safety control, contract management, information management, organization and coordination, etc. 2 Supervision content 3.1 Construction preparation stage 3.1.1 The Chief Supervision Engineer shall preside over the preparation of the Supervision Plan, which shall be implemented after being submitted to the Owner for approval; ● Basis for the preparation of the Supervision Plan · relevant laws, regulations and project approval documents of the construction project· Standards, specifications, design documents and technical data related to construction projects· Supervision contract documents and contract documents related to the construction project. 3.1.2 Assist the Client in organizing the joint review of construction drawings and put forward supervision opinions: ● Review principles: advanced technology, reliability, safety, optimization and investment saving. ● Main contents of the review: · Main disciplines (structure, process, piping, equipment, materials, safety, etc.) check the implementation of the modification opinions of the design review meeting· Implementation of important technical solutions, major technical changes and remaining problems· Construction feasibility study· Depth and integrity of design documents· Implementation of design representative dispatch plan. ● Problems to be solved in the joint review of construction drawings: · Master the design intent and the requirements of the project owner· Understand the design scheme, technical measures and implementation of national specifications and standards· New technology, new process, new material and new equipment used in design· Solve construction problems in drawings· Whether there are errors and omissions in the design drawings, and whether there are contradictions among disciplines. ● After joint review of drawings, submit written comments to the project owner and design unit. 3.1.3 Assist the project owner to organize design disclosure ● Contents of design disclosure: · Introduction of design intent, technical requirements and quality requirements· Attention to construction difficulties· Answer the questions raised in the joint review of drawings· Necessary exchanges and discussions. ● The design disclosure record shall be signed by all parties participating in the disclosure and then submitted to the design and construction parties for implementation. 3.1.4 Review the Construction Organization Design, construction technical measures and schemes submitted by the Contractor, and sign them if they are qualified. ● Basis for review: · Capital construction plan documents and feasibility reports approved by the state, investment indicators, approval documents of the construction area and competent authorities· Approved design specifications, expanded preliminary design and approval documents, construction drawing design documents, drawings, design budget estimates and revised budget estimates· The signed construction contract· Engineering geological and hydrological survey report· Standards, regulations and specifications specified in the construction contract and design documents; ● The main contents of the review are: · Project overview: general construction layout, general construction plan and general construction procedure· Installation quantities· Overall progress plan and progress measurement· Planning of temporary works and facilities· On site traffic, fire protection, water source, power demand and solutions· Main materials· Large machinery· Comprehensive balance and coordination plan of labor force· Main construction scheme, construction technical measures and quality assurance measures· Construction general layout and general layout management planning· Basic measures for safety, security, environmental protection, hygiene and epidemic prevention, civilized construction, etc. during construction· Calculation of main economic and technical indicators, etc.
  • Supervision of Low Hilly Land Reconstruction Project plan
    1.1 Project overview Project name: ************************* Low Hilly Land Reconstruction Project Owner: Dianjun Branch of * * Municipal Bureau of Land and Resources Designer: To ensure that the project quality meets the qualified requirements. 1.3.2 The objective of investment supervision is to strictly control the total investment, select the best implementation scheme, and strive to control the project investment within the budget estimate based on the approved investment estimate (budget) on the basis of comprehensive consideration of the impact of price rise factors and national mandatory documents on the project cost. 1.3.3 Progress supervision objective Under the condition that Party A guarantees the project funds, we will manage scientifically and urge the construction company to reasonably arrange the construction sequence, so as to control the construction period within the scope of the construction period specified in the construction contract. 1.3.4 Safety production and civilized construction supervision objectives shall be implemented according to the safety objectives specified in the construction contract. In the specific implementation process, supervise and inspect the construction unit to establish a safe production and civilized construction management system, improve the systems of safe production and civilized construction, effectively strengthen the control of factors affecting safe construction, eliminate major safety accidents, and strictly control minor injuries and other accidents.
  • Safety supervision plan Hospital project information
    This is the information of the hospital project of safety supervision planning. This document is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Safety supervision of a construction project plan knowledge
    This material is the safety supervision planning knowledge of a construction project. This document is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Safety supervision of a construction project plan data
    This is the safety supervision planning data of a construction project. This document is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Supervision of urban hotel renovation project plan
    This document is a supervision plan for the renovation project of city hotels. It is very valuable for reference and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Project supervision of a brand automobile store plan
    This material is the project supervision planning of a brand automobile store. It is very valuable for reference and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Construction supervision of a residential building project plan
    This information is the construction supervision planning of a residential building project. This document is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Project supervision of Jiayu Haoting (Phase II) Project plan
    1.1 Project name: Jiayu Haoting (Phase II) Project 1.2 Project construction site: Moshan 1.3, Hengling Village, Shitan Town, Zengcheng City Construction unit: Guangzhou Shunyuan Investment Co., Ltd. 1.4 Design unit: Guangzhou Hanhua Architectural Design Co., Ltd. 1.5 Supervision unit: Guangzhou Finance and Trade Construction and Development Supervision Co., Ltd. 1.6 Construction unit: Guangdong CITIC Jianjiang Engineering Co., Ltd
  • Project supervision of Jiayu Haoting Phase II Project plan
    The project is located in Hengling Village, Shitan, Zengcheng City, adjacent to Zengtan Road in the north and Feiken Road in the east. This design includes six high-rise residential buildings in Phase II, with a total floor area of 90000m?, The building area of local 2-storey basement is 30000 m?, Used as garage and equipment room. The basement adopts frame structure system, the foundation adopts natural foundation, and the foundation around the local tower adopts prestressed pipe pile foundation.
  • Construction supervision of housing construction works of warehouse project plan
    Overview of G314 Warehouse Project Housing Construction Supervision Planning Project. Scope, content, objective and basis of supervision work
  • Henan Road Engineering Project Supervision plan
    The design standard of the road is Grade I standard for urban trunk road. The road width is 40m, and the subgrade width is 41m.
  • Engineering supervision of land consolidation project plan (Management of supervision organization)
    Investment objective: strictly control the total price of the project according to the contract unit price and the actual quantities of the construction drawings, and the project investment of each bid section will not exceed the contract investment amount.
  • Highway engineering organization project supervision plan model
    Organize the personnel of the project supervision organization to get familiar with the design documents and put forward review opinions, and participate in the design disclosure and joint review of drawings; Organize and prepare project supervision plan and implementation rules; Hold the first site meeting to carry out supervision disclosure, and organize quality supervision work plan disclosure when required by the quality supervision department; Urge the Contractor to establish and improve the quality assurance system;
  • Chongqing Residential Building Project Supervision plan
    (5) Preside over the supervision work meeting, and issue the documents and instructions of the project supervision organization; (6) Examine and approve the commencement report, construction organization design, technical scheme and schedule submitted by the Contractor; (7) Review and sign the Contractor's application, payment certificate and completion settlement; (8) Review and handle engineering changes; (9) Preside over or participate in the investigation of project quality accidents;
  • Landscape engineering supervision of a garden project in Hangzhou plan
    This document is the landscape engineering supervision planning of a garden project in Hangzhou. This document is of great reference value and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Construction project supervision of construction science engineering plan
    This document is for the supervision planning of the construction project of Jianke Engineering. This document is very valuable for reference and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Supervision of a construction project in Shanxi Province plan
    This material is a construction project supervision plan in Shanxi Province. The content of the material includes: this document is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Engineering supervision of land consolidation project plan And implementation rules
    The land consolidation project in Township X is divided into the land consolidation project section A, with a target price of 3.6 million yuan. 269.02 hectares of farmland are developed and consolidated. The contract commencement/completion date is February 18, 2008 to November 15, 2008; Bid section B of the project, with a target price of 6.09 million yuan, develops and arranges 409.24 hectares of farmland, and the contract commencement/completion time is from February 18, 2008 to November 18, 2008; Bid section C of the project is 2.49 million yuan, and 189.61 hectares of farmland is developed and reorganized.
  • Supervision of a road and pipe network project plan
    The road and pipe network project is the main channel between the planned small and medium-sized river area and the Yangtze River area and Panlong area, and is also an important traffic line in the Yangtze River area and Panlong area. It is the lead project of the infrastructure construction project in the ecological transfer population resettlement area, and an important channel connecting Yingbin Avenue.
  • Supervision Outline of Public Rental Housing Construction Project
    The basic principle of quality control is to focus on pre control, do a good job of in-process control and post control. 3.1 Emphasize pre control and strengthen pre control. Pay attention to the quality pre control before the commencement of the project and the process. It mainly includes: 3.1.1 Review and confirm the qualification of contractors, especially the qualification of professional subcontractors, and enter the site for construction after being confirmed by the chief engineer. The supervising engineer shall dynamically monitor the project organization of the contractor and check the key personnel of the project organization of the contractor to ensure that the key personnel of the project organization promised by the contractor in the bidding document or specified in the construction contract are implemented in the implementation. 3.1.2 Urge the contractor to establish a perfect quality management system, and check whether its management structure is reasonable and whether the personnel are really in place. If it is suspected that the qualification of the contractor's personnel does not meet the requirements, a special assessment can be organized, and only those who pass the assessment can take the post. 3.1.3 Strengthen the review and joint review of construction drawings and equipment process drawings. 3.1.4 Review the construction organization design. The important construction organization design shall be reviewed by the engineering department of the company, and the general construction organization shall be reviewed by the supervision department. The review opinions shall be implemented and approved by the manager of the engineering department. The complicated construction organization design invites the expert group to participate in the review. In addition to the general construction organization design, the contractor shall also prepare a separate construction organization design for important divisional and sub divisional works. The specific contents to be prepared need to be determined according to the design, and our ISO9002 system has made more specific provisions. 3.1.5 Strengthen the approval of the construction technical scheme: the supervision engineer must carefully review the construction technical methods, processes, procedures, etc. of the contractor before commencement, and the key points of the review mainly include: the rationality of the construction procedure arrangement: the feasibility and reliability of the construction technology and methods of the main projects; Scientific and targeted technical organization measures; Rationality of construction plane layout; Management of materials, equipment and materials, allocation of main construction machinery and measuring and measuring instruments, etc. The supervising engineer shall urge the contractor to organize construction in strict accordance with the approved construction organization design, and track the disclosure and implementation of the technical scheme. 3.1.6 The construction technical scheme and key points to be reviewed include: foundation pit excavation and support engineering scheme, main concrete structure engineering (reinforcement, formwork, concrete, etc.) construction scheme, waterproof engineering construction scheme, exterior decoration engineering construction scheme, interior decoration engineering construction scheme, water supply and drainage engineering construction scheme, ventilation and air conditioning engineering construction scheme, electrical engineering construction scheme Construction scheme of fire protection engineering, construction scheme of equipment installation engineering, etc. 3.1.7 Check equipment preparation and performance. It is mainly to check whether the quantity and quality are sufficient and whether the process requirements are met. 3.1.8 Control the sample selection, determination and inspection of raw materials. This is an important work link. The materials that have a great impact on quality must be strictly controlled, and those that need to be submitted for inspection shall be witnessed and submitted for inspection. 3.1.9 Set process control points. 3.1.10 Reasonably arrange the development of relevant processes in advance. 3.2 Do a good job of in-process control and implement the quality control of the whole process. Patrol inspection, parallel inspection, site supervision and other work are mainly carried out according to the requirements of the Supervision Rules. Timely deal with problems found, and do a good job in process handover. 3.2.1 Strictly control the material quality. 3.2.2 Strictly control the process quality. If the next process is carried out without the approval of the supervising engineer, the supervising engineer will issue a "rectification notice" to order rectification, and appropriate punishment will be given if necessary. 3.2.3 Strictly implement the acceptance procedure of concealed works. 3.2.4 Strengthen the acceptance and intermediate acceptance of divisional and subdivisional works. 3.2.5 Special inspection and test shall be organized for new structures, processes and materials used in construction. 3.2.6 Strengthen equipment mobilization inspection and intermediate inspection and acceptance of equipment installation. 3.3 Do a good job of post control and adhere to the acceptance and handover system of divisional and subdivisional works. The construction of the next process can be carried out only after each process passes the acceptance. Our company has formulated specific management measures for process handover and management responsibility handover of working face.
  • [Fabricated building] Public building engineering supervision plan
    Cast in situ frame shear wall and fabricated monolithic concrete structure, the basement and three floors above the ground are cast-in-situ frame shear wall structures, and the above four floors are fabricated monolithic concrete structures.
  • Supervision of a land consolidation project in Hunan Province plan
    The project area is located in a hilly area in Hunan Province. The project is located in the administrative jurisdiction of Yanghe Township and Xujiafang Township, involving two districts. The traffic conditions in the project area are good, with highways and provincial roads passing through the project area; Rural roads extend in all directions, and land transportation is very convenient. All kinds of building materials can be directly sent to the construction site by land. The people in the project area are simple and unsophisticated, the leaders attach great importance to them, and the people have high enthusiasm, creating favorable conditions for the project construction. The surface water in the project area is mainly formed by precipitation, reservoir impoundment and Hunan water flow; The average annual rainfall is 1382mm; The maximum daily precipitation is 185.9mm. The groundwater belongs to the double-layer pressurized water of loose accumulation pore water. The project area belongs to the monsoon humid climate in the transition from the middle subtropical zone, with four distinct seasons and an annual average temperature of 16.3 ℃.
  • [Jilin] Sponge City Construction Project Supervision plan engineering
    For the construction scale and supervision scope of the project, we have sent 13 supervisors to complete the supervision work in the construction preparation stage, construction stage and completion stage of the project. The project supervision team shall be fully equipped with professionals to ensure the quality and depth of the supervision work and ensure the safety, high quality, fast and low-cost construction of the project.
  • Supervision of a military building heating project plan
    1. Construction unit: 2. Design unit: 3. Construction unit: 4. Supervision unit: 5. Basic information of the project: (1) thermal pipeline (2) heat exchange station. II. The scope of supervision work carries out all-round dynamic control over the project quality, construction period and project cost during the construction phase of the entrusted project; Coordinate all parties involved in the project construction and manage contracts and information. 3、 The contents of supervision work shall effectively control the investment, progress and quality of the project, comprehensively manage the project contract, manage the information and data related to the project, establish relevant archives according to the standards, coordinate the relationship between all parties involved in the construction, be responsible for inspecting and assisting in the implementation of safety and civilized construction measures, and assist in handling the construction delay and design changes during the construction of the project, Quality accidents, claims and other related issues, participate in the completion acceptance organized by the construction unit, cooperate in the review of project settlement, project final accounts, supervision of project warranty, etc. 4、 The supervision objectives are as follows:; The quality of the whole project reaches the qualification level specified in the contract, and the construction period target is from MM/DD/2010 to MM/DD/2010; Strictly control the occurrence of risk factors to the construction cost during the construction process, and always keep the project cost under control. In the process of implementation of supervision, we should achieve: good quality, less investment, fast progress, high efficiency and excellent service. 5、 Supervision work basis According to the Code for Construction Project Supervision and relevant regulations, the main basis for the supervision work carried out by the Supervision Department is as follows: 1. Policies, decrees, regulations, specifications and standards of the state and Xi'an City, Shaanxi Province on project construction; 2. The approval document of the superior competent department of the construction unit for the project; 3. Bidding documents of the Employer and the contract involving supervision business signed by the Employer and a third party; 4. Formal project construction drawings and relevant documents; 5. Entrusted supervision contract of the project; 6. Hydrogeological and engineering geological survey report of the Project; 7. Design estimate (budget) and cost documents of the project.
  • 220KV substation supervision plan -Project Overview
    The control system of Zaoping 220 kV substation adopts microcomputer monitoring mode, which can realize all functions of conventional control and special RTU device.
  • Project supervision organization Construction supervision plan model
    The project supervision organization is the temporary organization set up by the company according to the contract project to perform the entrusted supervision contract and implement the project supervision work (which will be canceled with the completion of the project supervision work).
  • Construction energy conservation supervision of engineering projects plan (Standard format)
    The variety, specification and performance of the materials (products) used in the energy-saving project shall meet the design requirements. The main materials and products (raw materials, semi-finished products, finished products, purchased accessories, etc.) shall be inspected for product quality certification documents, type inspection reports and relevant performance test reports when entering the site, and the main materials and products shall be sampled for re inspection. (density, tensile strength, dimensional stability, etc.) tensile bearing capacity of single anchor bolt, every 300 m2/batch.
  • Construction supervision of chemical project construction plan
    This document is the supervision planning for the construction phase of the chemical project construction engineering. The content of the document includes: this document is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • (Strip foundation) supervision plan Brick concrete (project overview)
    Construction supervision of housing construction projects within the red line specified in the construction contract of construction projects. Carry out supervision activities within the authorization scope of the entrustment contract.
  • Shandong Binzhou Huanghe Community Project Supervision plan
    10. Section 11 is composed of 9 dormitory buildings, basically B C Two types of house, the highest is six floors, of which the first floor is a storage room, the second to sixth floors are residential buildings, the top floor is a pitched roof loft, the building height is 19.60M (the height from the outdoor terrace to the cornice), the main exterior wall is 370 brick walls, and the total building area is about 38000 m2, of which 8 #, 10 #, 11 #, 13 #, 15 # buildings are contracted by Binzhou Construction Engineering Group, and 12 #, 14 #, 16 #, 18 # buildings are contracted by Shandong Qifeng Construction Engineering Group. The project durability rating is Level II, the fortification intensity is 7 degrees, and the fire resistance rating is Level II. The foundation form is rammed cast-in-place pile (rammed expanded pile), and the pile foundation concrete mark is C20. Among them, 11 # and 18 # buildings are subject to secondary expansion and the rest are subject to primary expansion. The project is of brick concrete structure, cast-in-place floor, concrete grade C20, and cold rolled ribbed steel bars with diameter of 12 and below.