This document is a supervision plan for the renovation project of city hotels. It is very valuable for reference and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.

 Supervision planning of urban hotel renovation project - Figure 1

Supervision planning of urban hotel renovation project - Figure 1

 Supervision Plan for Urban Hotel Renovation Project - Figure 2

Supervision Plan for Urban Hotel Renovation Project - Figure 2

 Supervision Plan for Urban Hotel Renovation Project - Figure 3

Supervision Plan for Urban Hotel Renovation Project - Figure 3

 Supervision Plan for Urban Hotel Renovation Project - Figure 4

Supervision Plan for Urban Hotel Renovation Project - Figure 4

 Supervision Plan for Urban Hotel Renovation Project - Figure 5

Supervision Plan for Urban Hotel Renovation Project - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

  • [Jilin] Sponge City Construction Project Supervision plan (Detailed)
    Scope, content and objectives of supervision work, project supervision organization, staffing, mobilization and demobilization plan, and supervision post responsibilities
  • Supervision of a city trunk road reconstruction project in Yichang, Hubei plan
    XX Avenue Project (XX East Road - XX Bridge), the route direction is consistent with the existing road, the route starts from XX East Road, Wujiagang, Yichang City, at stake number K1+150, and ends at XX bridgehead, at stake number K2+250. The total length of the route is 1.1 km. This section is designed to run at a speed of 60 km/h according to the Class II standard for urban trunk roads. The standard cross section is arranged as carriageway (22.5 m)+roadside green belt (4.5 m × 2) +Sidewalk (5m × 2)+edge green belt (about 4.25m × 2). The pavement structure is asphalt concrete. Excavate the existing concrete pavement, build new cement stabilized macadam base and asphalt concrete pavement, and optimize the drainage, power pipe trench, greening and sidewalk. The bidding contract price of the project is 12603462 yuan, and the planned construction period is 205 days.
  • Supervision of a city trunk road reconstruction project in Shandong Province plan
    1. Project name: * * Road Reconstruction Project. 2. Project location: * * Road, * * District. 3. Project scale: the total length of the road is 3253.304 meters, and the average width of the road is 24 meters. The scope of the first phase of the project: the original section from * * to * * road intersection is 760 meters long. 4. Project investment: 5. Quality standard: meet the Standard for Quality Inspection and Assessment of Highway Engineering (JTGF80/1-2004) and the current municipal engineering construction acceptance standards. 6. Planned duration: 53 days for Phase I (17 days for pipe network, 36 days for road)
  • Project supervision summary of fire protection reconstruction project
    The frame structure has two floors, with a building area of 11732m2 and a use area of 8800m2. The use nature is the civil air defense command post.
  • [Hubei] Monthly Supervision Report of Low Hillock Reconstruction Project
    Content introduction II. Contractor's project organization system 1. Project division and project contents of each bid section The project implementation unit in the project area is divided into five bid sections according to the current geographical situation. The construction contents of each bid section include land leveling, farmland water conservancy, agricultural canals, ditches, water outlets, desilting, field roads, pipe culverts, bridges (pedestrian bridges and tractor bridges) and ancillary works. 2. The Contractor's organization and the main subcontractors' undertaking of subcontracted projects The Contractor has signed construction contracts and set up project departments in each bid section. Project management and construction personnel are basically in place. The project is under construction.
  • Heat supply project supervision of petrochemical company plan
    1. The scope of supervision includes all supervision work in the installation and commissioning stage of boilers, auxiliary equipment and process pipes, and relevant electrical instruments of the heating project, namely quality control, progress control, investment control, safety control, contract management, information management, organization and coordination, etc. 2 Supervision content 3.1 Construction preparation stage 3.1.1 The Chief Supervision Engineer shall preside over the preparation of the Supervision Plan, which shall be implemented after being submitted to the Owner for approval; ● Basis for the preparation of the Supervision Plan · relevant laws, regulations and project approval documents of the construction project· Standards, specifications, design documents and technical data related to construction projects· Supervision contract documents and contract documents related to the construction project. 3.1.2 Assist the Client in organizing the joint review of construction drawings and put forward supervision opinions: ● Review principles: advanced technology, reliability, safety, optimization and investment saving. ● Main contents of the review: · Main disciplines (structure, process, piping, equipment, materials, safety, etc.) check the implementation of the modification opinions of the design review meeting· Implementation of important technical solutions, major technical changes and remaining problems· Construction feasibility study· Depth and integrity of design documents· Implementation of design representative dispatch plan. ● Problems to be solved in the joint review of construction drawings: · Master the design intent and the requirements of the project owner· Understand the design scheme, technical measures and implementation of national specifications and standards· New technology, new process, new material and new equipment used in design· Solve construction problems in drawings· Whether there are errors and omissions in the design drawings, and whether there are contradictions among disciplines. ● After joint review of drawings, submit written comments to the project owner and design unit. 3.1.3 Assist the project owner to organize design disclosure ● Contents of design disclosure: · Introduction of design intent, technical requirements and quality requirements· Attention to construction difficulties· Answer the questions raised in the joint review of drawings· Necessary exchanges and discussions. ● The design disclosure record shall be signed by all parties participating in the disclosure and then submitted to the design and construction parties for implementation. 3.1.4 Review the Construction Organization Design, construction technical measures and schemes submitted by the Contractor, and sign them if they are qualified. ● Basis for review: · Capital construction plan documents and feasibility reports approved by the state, investment indicators, approval documents of the construction area and competent authorities· Approved design specifications, expanded preliminary design and approval documents, construction drawing design documents, drawings, design budget estimates and revised budget estimates· The signed construction contract· Engineering geological and hydrological survey report· Standards, regulations and specifications specified in the construction contract and design documents; ● The main contents of the review are: · Project overview: general construction layout, general construction plan and general construction procedure· Installation quantities· Overall progress plan and progress measurement· Planning of temporary works and facilities· On site traffic, fire protection, water source, power demand and solutions· Main materials· Large machinery· Comprehensive balance and coordination plan of labor force· Main construction scheme, construction technical measures and quality assurance measures· Construction general layout and general layout management planning· Basic measures for safety, security, environmental protection, hygiene and epidemic prevention, civilized construction, etc. during construction· Calculation of main economic and technical indicators, etc.
  • [Sichuan] Old Street Reconstruction Project Supervisor plan
    1. Project name: Old Street Reconstruction Project in xx Town, xx City (Phase II) 2. Project location: xx Town, central district of xx City 3. Design unit: Chengdu xx Construction Engineering Design Co., Ltd. 4. Construction unit: xxxx Real Estate Development Co., Ltd. 5. Construction unit: xxxx Construction Engineering Co., Ltd. 6. Building area: 57224.74 ㎡ 7. Project investment: 80000000 yuan
  • [Yunnan] School agent construction project supervision plan
    Project name: agent construction system project (phase I) of primary and secondary school xx project construction section II xx dormitory and canteen project 1. Construction site: in xx town, xxxx county 2. Construction scale: student dormitory building 326.3m2 canteen 108.92 m2 toilet 88.76 m2 3. Project contract price: 659198.82 yuan Construction unit: xx county education and education bureau
  • Engineering supervision of a public project plan (New)
    (1) Determine the division of labor and job responsibilities of the personnel of the project supervision organization; (2) Preside over the preparation of project supervision plan, review and approve the implementation rules of project supervision, and be responsible for managing the daily work of the project supervision organization; (3) Review the qualification of subcontractors and put forward review opinions; (4) Check and supervise the work of supervision personnel, allocate personnel according to the progress of the project, and replace unqualified personnel;
  • Safety supervision plan Hospital project information
    This is the information of the hospital project of safety supervision planning. This document is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Safety supervision of a construction project plan knowledge
    This material is the safety supervision planning knowledge of a construction project. This document is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Safety supervision of a construction project plan data
    This is the safety supervision planning data of a construction project. This document is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Bridge project supervision plan (Model)
    This document is a bridge project supervision plan (model). This document is very valuable for reference and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Project supervision of a brand automobile store plan
    This material is the project supervision planning of a brand automobile store. It is very valuable for reference and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Construction supervision of a residential building project plan
    This information is the construction supervision planning of a residential building project. This document is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Cad design drawing of a city hotel appearance reconstruction building
    This data is: a city hotel appearance reconstruction building cad design drawings. The contents include: basement plan, first floor plan, second floor plan. The content is detailed and can be used for reference.
  • Supervision of agricultural irrigation water-saving reconstruction project plan
    Xx County is located in the northwest of xx Uygur Autonomous Region, the upper reaches of the Bortala River valley, the northern foot of the western Tianshan Mountains, and the western edge of the Junggar Basin. It is adjacent to Bole City in the east, Zhentao Mountain in the south and Huocheng County in the south, and Kazakhstan in the west and north is bounded by Kongguo Luobo Mountain and the western part of Aratau Mountain respectively. The county town of Bortala is 625km away from Urumqi. The total area of the county is 5904.85 square kilometers. The water-saving supporting reconstruction project of xx medium-sized irrigation area is a artesian irrigation project, which draws water from three rivers, namely, Dakustai River, xx Ditch and Arshati River, with a planned irrigation area of 59800 mu. The total project is divided into five sections, including the diversion channel head of xx ditch, the diversion main channel on the left bank of Dakusti River, the diversion main channel of xx main channel, the diversion main channel on the right bank of Arshati River, the xx branch channel and the Sumu branch channel. The anti-seepage reconstruction of the main diversion channel on the left bank of Dakusti River is 7.21km, the anti-seepage reconstruction of the xx main channel is 3.36km, the anti-seepage reconstruction of the main diversion channel on the right bank of the Arshati River is 6.59km, the xx branch channel is 6.73km, and the Sumu branch channel is 1.1km. 85 buildings for trunk and branch canals will be constructed, including 38 regulating sluice gates, 3 aqueducts, 1 grit chamber, 2 drinking sheep ponds, 24 agricultural bridges, 27 steep slopes and 4 sets of all channel control systems. Five water measuring weirs, one set of automatic monitoring equipment and one 220m2 management station building will be constructed in the irrigation area. The specific construction contents of each bid section of the water-saving supporting reconstruction project of xx medium-sized irrigation area are as follows: (1) xx trunk canal is 3.36 km long, with 1 newly built grit chamber, 4 regulating water diversion valves, 1 aqueduct, 2 drinking sheep ponds, 3 agricultural bridges, and 22 steep slopes. (2) The east main canal of Dakustai River is led by the head of Dakustai River, with a total length of 7.21km, 3 regulating water diversion valves, 1 aqueduct (built and used), and 2 agricultural bridges. (3) The Alxatisi trunk canal is led by the head of the Alxatisi River, with a total length of 6.59 km. The trunk canal has 10 regulating water diversion valves and 14 agricultural bridges. (4) The xx branch canal has a total length of 6.73km, with 17 control water diversion valves, 2 aqueducts and 4 agricultural bridges newly built. (5) Sumu Branch Canal is 1.1 km long, with 4 control water diversion valves, 1 agricultural bridge and 5 steep slopes.
  • Supervision of a road reconstruction project in Guangdong Province plan
    Project Name: Construction site of * * * Engineering Office of * * Construction Unit of Bank BC Line Reconstruction Project of * * Bridge to * * Road Section in * * District * * Overview of Road between * * * Bridge and * * Road Line B 2430.38m (k1+000 - k3+430.38) Line C 231.37m (k1+000 - k+231.37) Project Composition and scale Traffic engineering and facilities along the line, municipal pipelines, subgrade, pavement and drainage, bridge and culvert works. The main types of building structures are road, bridge and culvert structures. Brief Description of Project Features The construction investment for the embankment reconstruction project of the section from * * Bridge to * * Road in * * District is about 9 million yuan, and the total length of BC Line is 2661.75 m, including traffic facilities, municipal pipelines, subgrade, pavement and drainage, bridges and culverts along the line.
  • Supervision of Old Community Reconstruction Project plan (Model)
    1. Project name: old residential area reconstruction project 2. Project location: four old residential areas in the city 3. Project scale: total investment 10 million yuan 4. Total area: 300000 m2 5. Participants: As follows: A, construction unit: xx Construction and Management Bureau B, management unit: Municipal Project Management Consulting Co., Ltd. C, design unit: xx Engineering Design and Research Institute D Construction unit: XX Engineering Co., Ltd. E. Supervision unit: XX Supervision Consulting Co., Ltd. II. Project characteristics 1. This project is an outdoor pipe network reconstruction project with many contractors and construction disciplines, including rainwater and sewage pipes, water supply pipes, gas pipes, telecommunications, street lights, etc. 2. In the construction, there are cross operations, so it is particularly important to arrange the construction sequence reasonably. 3. The reconstruction project is different from the new project. Before construction, the original pipe network must be investigated clearly. The newly laid pipe network and the original pipe network must be connected in the street. 4. The original pipe network is buried underground, and there is great variability in the construction. It should be adjusted reasonably according to the specific situation of the site, but it must be approved by the unit. 5. During construction, it is necessary to communicate with residents in the community in time to prevent conflicts with residents during construction. 6. In the supervision process, there are many aspects involved and the coordination workload is large. 7. Since the technical content of the project is relatively low, the project supervision organization will not prepare the supervision implementation rules separately, but will write the relevant contents of the supervision implementation rules into the supervision planning.
  • Supervision of sewage pipe network reconstruction project plan
    The reinforced concrete pipe jacking construction is used to cross the traffic trunk road and flood discharge channel, which has certain construction difficulties.
  • Supervision of Longli County Road Network Reconstruction Project plan
    The construction and installation cost of this project is about 81.1 million yuan. The total length of the road route is 10713.041 meters, with an area of 123099.07.59 square meters. The total length of rainwater pipeline is 7075 meters, the total length of sewage pipeline is 6810 meters, the total length of power pipeline is 64055.93 meters, the total length of communication pipeline is 42168.98 meters, the traffic marking is 11759.44 meters, and the old pavement removal area and pavement area of sidewalks are 86508.00 square meters, The old removal and installation length of roadway teeth is 23115.20 meters. The reconstruction project includes the urban (Hehua Road, Jinlong Road, Huancheng Road, Jinlong Road (Phase II), Xiaojieyuan, Zhongshan Road, Qinglong Road, Main Street, Tenglong Road, Beimen Street, Taiping Temple, Renmin Road, North Ring Road, Sanlin Road, Xinglong Road, Taiping Temple (Phase II)), Guixin interconnection line (West Ring Line).
  • Supervision of urban housing demolition project plan
    This material is the supervision planning of urban housing demolition project. This document is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Safety supervision of urban housing engineering plan
    This material is the safety supervision planning of urban housing projects. This document is very valuable for reference. It is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Chongqing City Square Civil Air Defense Supervision plan
    This document is the civil air defense supervision planning of Chongqing City Plaza. This document is of great reference value and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Urban power grid plan And transformation organization design
    The urban power grid planning and transformation organization design has detailed contents, which can be downloaded by netizens.
  • Monthly engineering supervision report of a city hotel project
    This document is the monthly project supervision report of a city hotel project. The content includes the progress and quality of the construction process of the hotel project. The content is detailed for reference only.
  • Monthly supervision report of a city square project
    This document is the monthly supervision report of a city square project. The content includes the progress and quality of the square project. The content is detailed for reference only.
  • Project supervision of four high-rise buildings in a certain place plan
    The project has 7 degrees of seismic fortification, and the project structure type is reinforced concrete frame shear wall structure system.
  • Supervision of an environmental protection thermal power expansion project plan
    1.1 Project name: Nantong xx Environmental Thermal Power Co., Ltd. Phase II expansion project 1.2 Name of construction unit: Nantong xx Environmental Thermal Power Co., Ltd. 1.3 Project location: three kilometers north of xx Town, Nantong City 1.4 Project composition and scale: 1 × 130t/h sub high temperature sub high pressure circulating fluidized bed boiler+1 × B12 steam turbine generator unit and its supporting system equipment. Off plant heat supply network project, steam turbine room, boiler room and other supporting construction projects. 1.5 The total construction period is 10 months. 1.6 Quality requirements. The construction and installation works meet the design requirements and the construction and acceptance specifications issued by xx and the power industry. Ensure that the boiler water pressure, turbine impulse starting, grid connection and 72 hour test run are successful at one time. 1.7 Total investment or contract price 1.8 Project characteristics Civil works: span of boiler room is 24 meters; The turbine room has a span of 18 meters, a length of 24 meters, and a height of 18 meters; There are many equipment foundations in this project, and the requirements are very high. Especially for the turbine foundation, the axis position is required to be accurate, the size and depth of the reserved holes, the retention of embedded parts, and the elevation are required to be very accurate. Installation works: (to be described later when the drawings and construction organization design arrive.) 1.9 Project participants 1.5.1 Construction unit Nantong xx Environmental Thermal Power Co., Ltd. 1.5.2 Design unit Civil engineering: xx Electric Power Company xx Survey, Design and Research Institute Installation: xx University Architectural Design and Research Institute Thermal Power Engineering Design and Research Institute 1.5.3 Contractor and subcontractor to be determined 1.5.4 Project supervision unit Nanjing xx Construction Supervision Consulting Co., Ltd. 1.10 Main equipment and suppliers 1.10.1 Steam turbine 1.10.2 Generator 1.10.3 Boiler 1 × 130t/h circulating fluidized bed boiler
  • Jinan Times International Project Safety Supervision plan
    The project covers an area of 295614 ㎡, with a total construction area of about 295614.05 ㎡. The aboveground building area is 202576.4 m2, and the underground building area is 93037.65 m2. Building 3 # (high-rise podium commercial street of Building 4 #), Building 4 # (high-rise apartment), Building 5 # (high-rise apartment), Building 6 # (high-rise office), Building 7 # (high-rise office), and Building 8 # (podium buildings 5 #, 6 #, and 7 #, high-rise large-scale commercial buildings). The underground garage (Class I car garage) has a total of 9 individual projects. Among them, 3 # building is a frame structure, 4 # building to 7 # building is a frame core tube structure, 8 # building is a frame shear wall, frame steel support structure, and the underground garage is a frame structure. Its seismic rating is: frame level III, core tube level II. Among them, 3 # building has 2 floors underground and 4 floors above the ground, with a height of 16.30m. Building 4 # has 3 floors underground and 22 floors above the ground, with a height of 73.90 meters. Building 5 # has 3 floors underground and 27 floors above the ground, with a height of 96.60m. Building 6 # has 3 floors underground and 27 floors above the ground, with a height of 99.40 meters. Building 7 # has 3 floors underground and 27 floors above the ground, with a height of 99.40 meters. Building 8 # has 3 floors underground and 5 floors above the ground, with a height of 26.40m. The garage has 3 floors underground, about -16.20m. The absolute elevations of ± 0 and 00 are 25.4m for 3 # building, 26.3m for 4 # building - 8 # building and underground garage respectively. The design service life of the project structure is 50 years, the safety level of the building structure is Level II, the design level of the foundation is Level A, the waterproof level of the underground works is Level I, the fire resistance level of the building is Level I, and the importance coefficient is 1.0. The seismic fortification category of buildings is standard fortification category (Category C), except that 8 # (large commerce) is the key fortification category (Category B). The seismic fortification intensity of 8 # (large commercial) seismic measures of the project is 7 degrees; The seismic fortification intensity of other buildings is 6 degrees.
  • Petrochemical project supervision plan (Model)
    1.1 Project overview 1.1.1 Project name: project; 1.1.2 Construction site:; 1.1.3 Project scale: 1.1.4 Relevant units of project construction: ① Construction unit (owner) : The company ② Design unit: ③ Geological exploration unit: ④ Quality supervision organization: Quality supervision station ⑤ EPC general contractor: ⑥ Construction contractor: ⑦ Supervisor: Changsha Huaxing Construction Supervision Co., Ltd. 1.2 Main project content (according to the actual project, the following is an example) 1.2.1 Main production unit construction projects such as new construction, reconstruction and expansion. 1.2.2 Auxiliary production equipment construction projects such as new construction, reconstruction and expansion of central control room, comprehensive office building (including inspection/test), storage and transportation system (including tank farm, warehouse and various loading and unloading platforms), flare device, emergency water buffer pool, fire pool, acid and alkali station. 1.2.3 Construction of new, reconstructed and expanded circulating water system, condensate system, industrial water system, high and low voltage power transformation and distribution room, refrigeration station, desalted water station, air compression station, sewage treatment plant and other public works. 1.3 Owner's project objective ① construction quality objective: to meet the qualification standards in the national construction acceptance specifications of relevant disciplines. ② Construction progress target: the total construction period is years (or start on MM/DD/YYYY, and complete/test run on MM/DD/YYYY). ③ The implicit goal of the owner: strive to reduce the project investment and control the total project investment; (The estimated investment is ten thousand yuan) Strict management of safe and civilized construction and prevention and control of major safety accidents.
  • Shandong Binzhou Huanghe Community Project Supervision plan
    10. Section 11 is composed of 9 dormitory buildings, basically B C Two types of house, the highest is six floors, of which the first floor is a storage room, the second to sixth floors are residential buildings, the top floor is a pitched roof loft, the building height is 19.60M (the height from the outdoor terrace to the cornice), the main exterior wall is 370 brick walls, and the total building area is about 38000 m2, of which 8 #, 10 #, 11 #, 13 #, 15 # buildings are contracted by Binzhou Construction Engineering Group, and 12 #, 14 #, 16 #, 18 # buildings are contracted by Shandong Qifeng Construction Engineering Group. The project durability rating is Level II, the fortification intensity is 7 degrees, and the fire resistance rating is Level II. The foundation form is rammed cast-in-place pile (rammed expanded pile), and the pile foundation concrete mark is C20. Among them, 11 # and 18 # buildings are subject to secondary expansion and the rest are subject to primary expansion. The project is of brick concrete structure, cast-in-place floor, concrete grade C20, and cold rolled ribbed steel bars with diameter of 12 and below.
  • Project supervision of Shuijie Expressway plan
    Shuijie Expressway is a section of Changsha Chongqing Expressway, starting from Shuijiang Town, Nanchuan City and ending at Jieshi Town, Banan District, with a total length of 84.8km. The designed and calculated driving speed is 100KM/h, the overall subgrade width is 26m, and the separated subgrade width is 13m. It is a two-way four lane expressway in mountainous and heavy hilly areas, with the design load of 20 and 120 cars and the design calculation speed of 100KM/h. The civil engineering contract duration is 24 months. There are many bridges and tunnels, so the project is difficult.
  • Construction Project Supervision of Duck Breeding House Expansion Farm plan
    Patrol and inspect the construction process of important subdivisional and divisional works, and stand by the concealed process of concealed works
  • Supervision of a residential project in Chengdu plan
    Urge all parties to formulate countermeasures to ensure that the total construction period does not break through; Urge all parties to formulate remedial measures after the total construction period is exceeded; Urge relevant parties to adjust the corresponding construction plan, material and equipment procurement and supply plan, fund supply plan, etc., and organize new coordination and balance.
  • Coordinate project construction supervision plan
    Coordinate the work between relevant units in the project system (including the owner, design unit, general contractor, professional construction unit, material and equipment suppliers, etc.); Assist the Owner to coordinate the work between relevant units outside the project system (including administrative departments, adjacent units of the project, municipal departments, urban management departments, environmental protection departments, health departments, public security departments, social organizations, etc.).
  • The construction unit prepares project construction supervision plan
    1. Assist the construction unit in preparing the overall plan for project construction and the overall control plan for project construction; 2. Assist the construction unit to establish a perfect document management control system and make it operate effectively; 3. Assist the construction unit and the design unit to work out a detailed construction drawing delivery plan, and assist in expediting the delivery of construction drawings;
  • Safety supervision of factory construction project plan
    According to the project characteristics and specific conditions, detailed supervision implementation rules shall be formulated for sub divisional and sub divisional works, methods and procedures for raw materials, process quality, progress, safety and investment control shall be formulated, and pre control points, pre control measures and testing standards, means, project frequency, inspection points, witness points, side station details, supporting charts, records, and relevant data requirements shall be listed in detail, The discipline and construction progress shall disclose the supervision procedure to the contractor in writing, and propose the supervision cooperation conditions.
  • Municipal supervision of a project in Sichuan plan programme
    This document is a municipal supervision planning scheme for a project in Sichuan. It is very valuable for reference and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.