The construction area of the project is 4364.95m2, with a total length of 63.20m from east to west and a total width of 11.00m from south to north. There are six floors in total. Each floor is composed of six units, two households in each unit, with a floor height of 2.7m, an indoor and outdoor height difference of 0.6m, and a total height of 16.96m. The buried depth of the foundation is 2.6m, and 45cm thick 3:7 lime soil is laid with strip brick foundation. The top and bottom of the strip foundation are equipped with 18cm thick reinforced concrete ring beams, and the four large corners, T-joints and cross joints are equipped with reinforced concrete structural columns. The superstructure is fortified with 8 degrees of earthquake resistance. The outer wall is 18cm thick, the inner wall is 16Cm thick, and the strength grade is C20 reinforced concrete wall. The floor and roof slab are prestressed short circular orifice plates, and stairs, balconies, rain covers, and cornice slabs are all standard precast concrete members of the city. The partition walls of kitchen and toilet are made of reinforced gypsum hollow slats. The roof waterproof method is to apply light colorant on SBS modified asphalt flexible felt. The external windows are hollow steel windows, of which the north facade windows are double-layer windows. The interior door is hollow wooden door, and the household door is a composite anti-theft fire door. The indoor floor is made of pea stone concrete, except that the kitchen and toilet are made of ceramic mosaic tile surface course on polyurethane waterproof coating film. The cement skirting board is 120mm high. Except that the toilet and kitchen are ceramic tile dado and scrub resistant paint walls, other interior walls are puttied and sprayed with white mortar. For the need of energy conservation and thermal insulation, the outer wall is also provided with an air layer, 50mm thick self extinguishing polystyrene foam plastic board and 12mm thick paper faced gypsum board on the inner side of the concrete wall.

 Construction organization design proposal of a project - Figure 1

Construction organization design proposal of a project - Figure 1

 Construction organization design proposal of a project - Figure 2

Construction organization design proposal of a project - Figure 2

 Construction organization design proposal of a project - Figure 3

Construction organization design proposal of a project - Figure 3

 Construction organization design proposal of a project - Figure 4

Construction organization design proposal of a project - Figure 4

 Construction organization design proposal of a project - Figure 5

Construction organization design proposal of a project - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

  • Construction organization of complex building project design scheme book
    The project is 61.6m long and 16.3m wide, with a total building area of 2729.8m2. The structure is a cast-in-place frame. The number of floors is: the main body has four floors, the floor height is 3.5m for the first floor, and 3.3m for the second four floors. The cast-in-place roof has a total eaves height of 13.4m, and the height difference between indoor and outdoor is 450mm. The project adopts independent foundation under column and cast-in-place frame structure. The seismic fortification intensity of the project is 7 degrees.
  • Project Construction Organization of Grand Hotel design scheme book
    The project of the Grand Hotel is close to Nanlong Highway, and the traffic is very convenient. Three supplies and one leveling have been completed, and the site is relatively open. The plane geometry of the hotel is in the shape of "square", with the east-west length of 40.27m and the north-south length of 38.08m; The east wing is of frame structure, and the west wing is of mixed structure, with five floors in total. The floor height of the frame part is 3.8m, the floor height of the mixed structure part is 3.2m, the indoor and outdoor height difference is 0.6m, and the total height is 89m (from the outdoor terrace to the cornice elevation); The building area is 7899.78 square meters. The project is divided into two parts: the east side house and the west side house. The east side house is a four story frame structure, and the west side house is a five story mixed structure. The design seismic fortification intensity is 7, and the construction site is classified into three categories.
  • Construction organization of a building project design scheme book
    The second underground floor is the garage, the storeroom of the farmers' market, the fire pool, the power distribution room, etc. The first underground floor is the farmers' market. For the external decoration of the project, granite columns are hung on the columns of the first floor underground, stone island red granite is hung on the walls of the first and second floors, 100 × 100 colored tiles are used on the external walls, all windows are VPVC windows, and the glass is light gray hollow coated glass windows (mall windows). The first floor underground is 10 thick top hung concealed frame coated glass windows, and gray glass curtain walls are used on the middle aisle and the third floor facade, The roof is sloped with hydrophobic expanded perlite block insulation materials, EPDM waterproof materials, and floor tiles are beautified.
  • Construction organization of residential building project design scheme book
    The project is located in Sanjiao New Village (Xujiapeng Section of Youyi Avenue) in Wuchang, which is composed of several buildings, of which 4 # building has a building area of 3760 square meters. The building grade is Grade II, the fire resistance grade is Grade II, the seismic design and anti cracking degree is 6 degrees, and the design reasonable service life is 50 years. The structural form is full cast-in-place frame special-shaped column structure, and the roof is Grade II waterproof roof with a durability of 15 years; The building has six floors, with a storey height of 2.8m and eaves height of 17.4m. The indoor ± 0.000 of the project is equivalent to the absolute elevation of 21.95M, the overall height of the building is 17.4M, the seismic fortification intensity of the building is six degrees, the safety level of the building structure is Level II, and the importance of the building is Class C. The construction site is classified as Class II, and the site soil type is medium soft site soil. The strength grade of concrete is C10 for foundation cushion, C25 for foundation beam, superstructure beam and slab, and C30 for frame column. Grade I and II reinforcement shall be adopted. Masonry: MU10 autoclaved fly ash and M5 cement mortar are used for masonry below+0.300M, and aerated concrete blocks with dry unit weight not greater than 5.5KN/M3 and M5 mixed mortar are used for masonry of frame infilled walls above+0.300M; The external wall and household wall are 250 thick, the internal wall is 200 thick, and other kitchens and toilets are 125 thick.
  • Construction organization of complex building project design scheme book
    Building overview: the ground floor of the project is a facade, and the 2 – 4 floors are a fund-raising building composed of two units AB, with a floor height of 3 meters, a total height of 12.6 meters, a rectangular shape, 32.1 meters long and 16.2 meters wide. The ground floor area is 574.22 square meters, the standard floor area is 530.78 square meters, and the total building area is 2166.56 square meters. The project is a brick concrete structure, with MU7.5 ordinary bricks and M5 mortar masonry. The foundation adopts manual hole digging piles. The hole digging piles are equipped with connecting ground beams, precast concrete hollow slabs and roof panels. The main beams, columns, toilets, kitchen and toilet boards are cast-in-situ concrete. The lintels of doors and windows are prefabricated. The reinforcement shall be grade I and II steel, the beam column of the protective layer shall be 25, the concrete and concealed column shall be 20, the slab shall be 15, and the C25 concrete shall be used.
  • Construction organization of a river training project design scheme book
    Dongtai River Regulation Project in Beilun District is located in Beilun urban area, with a total length of 6275 meters. The renovation contents include: dredging of the whole line, bank foundation treatment, bank wall masonry, local bending and straightening. The project is divided into four sections: Section I (stake No. 0+000~1+917); Section II (stake No. 1+917~3+710.5); Section III (chainage 4+242.5~5+568); Section IV (stake No. 5+568~6+807); Our bidding section is the fourth section, with a total length of 1239m.
  • Construction organization of a road ditch project design scheme book
    A ditch project in the north section of a road (connected to Huanshi North Road) is located between a certain project in the north of the d city river and Huanshi North Road (south of Yunxing Wholesale Market). The construction unit of the project is d City Urban Construction Planning Bureau, the design unit is d Architectural Design Co., Ltd., the supervision unit is d Construction Supervision Co., Ltd., and the quality supervision unit is d City Municipal Garden Quality and Safety Supervision Station, The construction unit is d City Construction Engineering Co., Ltd., the project cost is about 750000 yuan, the commencement date is July 30, 2005, the completion date is September 30, 2005, and the contract period is 60 days. The total length of this project is 291m (151m rectangular ditch with B × H = 3.0 × 1.6m, 65m stone arch culvert ditch with B × H = 3.0 × 1.6m, and 75m φ 700 circular pipe drainage ditch), of which the excavated earthwork is lotus pond sludge, the gravel cushion is 15-20cm, the cast-in-place C20 concrete ditch bottom plate and ditch cover plate are about 420m3, and the masonry of MU30-MU40 stone walls and arches is about 700m3. The existing underground pipelines shall be protected during construction. All materials for this project are purchased by the construction unit itself. The concrete technology uses on-site mechanical mixing, and the reinforcement is fabricated on site. The construction machinery transportation tools and labor force are allocated and balanced by the construction unit according to the project construction schedule, so as to ensure that the construction plan is orderly and the project is completed on time with quality and quantity guaranteed.
  • Construction organization of general plant engineering design scheme book
    The project consists of 50 # plant, 51 # good plant, guard room and pump room, with a total construction area of 21874.83m2. The 50 # and 51 # power houses are six and seven storey R. C frame structures respectively. The foundation is R. C precast pile. The foundation and superstructure of independent cushion cap are cast-in-place R. C, with plane dimensions of 74.58 × 20.7m and 67.40 × 31.28m, column spacing of 6.0m, height of 32.7m and 33.5m, seismic intensity of 7 degrees, and structural seismic grade of III. The roof is APP high polymer waterproof coiled material, and R · C prefabricated board is paved on it. The gutter is equipped with a water falling system. The floor is made of artificial marble, anti-skid floor tiles and fine stone concrete surface. The external wall is faced with glass mosaic, the internal wall is latex paint and color tile wall, and aluminum alloy doors and windows.
  • Construction organization of Phase I project of the Center design scheme book
    The exhibition center has a superior geographical location and extremely convenient transportation. It is about 1km away from the downtown of xxx in the south, 3km away from the Xingang Wharf of xxx in the east, 3km away from the xx Wharf in the west, and more than 10km away from the Haikou Station of xx railway channel and the automobile ferry wharf in the west. It is also connected by Haikou Binhai Avenue and its extension lines, which are 60m and 50m long. In addition, urban secondary trunk roads are planned and constructed in the east and north of the exhibition center, It is conducive to the traffic organization of people and vehicles. The project is a class I large public building with a total construction area of 70000 square meters. It is planned to be implemented in three phases as required. The construction scale of Phase I is 1000 international standard booths, with a construction area of 25000 square meters. This bidding is a phase I project, with a total land area of 4.14 hectares. The pile foundation of this project is pre-stressed concrete pipe pile. There are one underground floor and three above the ground floors locally. The building cornice is 17.5m high and 200m long in total. The construction scope of the first phase project includes: the main building of the exhibition center and its auxiliary structures within the construction land of the first phase project; The corridor and platform between the main building and the Great Hall of the People, and the temporary outdoor parking lot on the land for Phase II project. The upper structure is a frame structure. The second and third floors are 18 × 15m column grids. The main beam is a multi span two-way post tensioned bonded prestressed reinforced concrete frame beam. The secondary beam is an unbonded prestressed concrete beam. The roof is a steel grid structure with a profiled steel plate roof. The lower part of the pedestrian platform is reinforced concrete, and the upper part is steel structure. The seismic fortification of the building is 8 degrees, the seismic grade is Grade II, and the axial compression ratio of the control column is less than 0.8.
  • Construction organization of tower high-rise project design scheme book
    Geographic location and three party introduction The new city K115 area is located in the new city development zone of Huaxia downtown. The project is located in the high-rise residential buildings in the K115 area, west of the site. It is built by Huaxia Development Company, loaned by the World Bank, designed by the Development, Design and Research Institute. The eighth project management department of Huaxia No. 4 Urban Construction Company is responsible for the construction. The structural construction is planned to start in early October 1998, and completed at the end of December 1999, The planned construction period is 450 days, including 60 days for foundation works, 210 days for main structure (later decoration works) and 180 days for decoration works.
  • Construction organization of an outdoor project design scheme book
    This project is an outdoor project of a hotel, mainly including the laying of outdoor pipe trenches, water heating and electrical pipelines, outdoor roads, fences and flower beds. Civil works include: pipe trench earthwork excavation and backfilling, cable well, granite ground laying, flower bed and wall masonry, iron installation, etc. The water heating content includes: laying of water pipes, domestic hot water pipes, fire water pipes, air conditioning water pipes, spray water pipes, heating water pipes, as well as pressurization, flushing and water testing of various pipes; Thermal insulation, anti-corrosion, protection, etc. required by the design. Strong current construction includes: cable laying.
  • Construction organization of gas engineering in a city design scheme book
    The pipeline gas project in a city is an urban pipeline gas project approved by our province, relevant departments and the people's government. The annual gas supply capacity is 14 million cubic meters, covering the urban planning area of the city. The medium in the pipeline is natural gas. The municipal pipeline gas project consists of two parts, the gasification station part and the urban pipe network part, and the urban pipe network part includes the household project. The construction of the city's pipeline gas project is the first natural gas project in our province, which will have a significant impact and far-reaching significance on the development of natural gas in our province. This project is a medium pressure gas pipeline project. It starts from the natural gas valve station on the west side of Yingbin Avenue, runs eastward along the south side of Yingbin Avenue, passes through Yongfeng Road, Youzhuang Road and Huancheng South Road from Huancheng West Road, and then runs along Hongzhou along Yingbin Avenue to Ningbo Road; The pipeline runs from Qingping South Road to Hongzhou Road along Ningbo; Along the west ring of the city, the route is from Yongfeng Road to the ring of the city, then from Huancheng Road to Yingpan West Road along Mall Street, from Mall Street to Shaoshan North Road along Yingpan West Road, from Shaoshan North Road to Wenhua North Road along Yingpan East Road, and from Yingpan East Road to Beijing East Road along Wenhua North Road, as well as the residential and commercial users covered. The design pressure of the pipeline is medium pressure Class A 0.3MPa (gauge pressure). The total length of the trunk line is 15.13km, and SDR11 polyethylene pipeline is selected, of which the length of the pipeline with a diameter of de 250 × 22.7 is 0.95km; The pipeline length of de 200 × 18.2 is 10.31 km, and the pipeline length of de 200 × 18.2 is 0.95 km. The standard is GB/15558.1-1995, and the polyethylene pipe fittings of GB/15558.2-1995 are selected as the pipe fittings; Q235B steel pipe with a length of 2941m is selected for the crossing and the first branch line. The work quantity of the household is to be determined because there is no design drawing.
  • Construction organization of a greening project design scheme book
    This project is a separate greening project, with long route, great construction difficulty, high quality requirements, and accurate design style. There are many varieties of seedlings planted, with high technical requirements for planting, strong professionalism, and strong interspersed engineering construction. Green planting: divided into four parts: planting environment treatment, green lofting, seedling selection and planting, and maintenance. The arbors in this project are the main landscape trees in the green space, and the quality of planting will directly affect the landscape effect of the green space.
  • Construction organization of an environmental improvement project design scheme book
    The environmental improvement project of a project is located in Keqiao, which is planned and constructed by a county public city construction investment and development company, and designed by a county urban planning and design institute. The total construction area is 21000 square meters. The main contents of the project include retaining walls of river banks, river ports, garden roads, fences, steps, racks, garden ornaments, water supply pipelines, lighting power, landscaping, etc. The plane of the environmental improvement project of a project is in a belt shape along the Zhedong Canal, with a total land area of 21000 square meters. The project adopts relative coordinate system for positioning. The 0 and 0 points are led out from the enclosure of the passenger transport center, and the included angle between the positive direction of the x axis and the positive north axis is 28.32 degrees. The cross slope of the road is 1.5%. When the one-way ramp intersects with the two-way ramp, the two-way ramp is used as the control. When the secondary road intersects with the main road, the main road is used as the control in principle. All roads shall collect water according to the longitudinal slope direction, without water condensation. Curbs are set on both sides of the road, and greening is set outside the curb. The greening elevation is about 5cm lower than the top elevation of the curb. A horizontal expansion joint is set every 30 meters on the garden road. Green planting reflects the style and features of a certain water town and imitates the growth effect of natural forest belt. Large areas of open areas are planted with colored leaves, flowering trees and clusters. The planting soil shall be organic soil with uniform soil texture and sufficient base fertilizer shall be applied. The ground cover planting soil layer is more than 40cm, the flower shrub and tree planting soil is more than 60cm, and the planting soil is covered with 10cm loess. 0.5% cross slope treatment shall be made at the junction of lawn and road. The layout of the whole green lawn and ground cover plants shall be such that the loess is not exposed to the air, and flowers and trees are clustered to form a dense greening effect.
  • Construction organization of greening works design scheme book
    The foundation shall be constructed with smooth formwork, and the concrete coping shall be made with 40MM thick sheet (L=4M) wood formwork and tensioned with Ф 12 rebar. According to the characteristics of the project, for the greening project, it is considered to carry out civil construction, setting out and positioning first. At the same time, the earthwork shall be reasonably allocated, and then the green land shall be marked, fixed and planted. This project is a separate greening project, with long route, great construction difficulty, high quality requirements, and accurate design style. There are many varieties of seedlings planted, with high technical requirements for planting, strong professionalism, and strong interspersed engineering construction.
  • Construction organization of sewage interception works design scheme book
    This contract section is the first bid section of Shanghai Suzhou Creek Tributary Sewage Interception Project, which includes two major parts: sewage intercepting header works and regional sewage collection system works. The sewage intercepting main works include: sewage intercepting main pipe and main pipe lifting pump station in North Suzhou; Suzhou Henan sewage intercepting main pipe and main pipe lifting pump station and other main works. The scope of work in this bid section includes the C # pump station project of the sewage intercepting main in the south of Suzhou and the pipeline project of the outer ring road from C # pump station to No. 6 bridge port.
  • Construction organization of urban light rail project design scheme book
    The mileage range of this section is K18+389.6 ~ K20+620.2. The line in this section is arranged along the existing railway, with totally enclosed double track. The total length of the line is 2230.6 meters, including 525.9 meters of overhead line and 1374.4 meters of ground line. It mainly includes Huilongguan Station, Huilongguan East Station, Huangtulian Viaduct, Huangping East Road Bridge, retaining wall, and line subgrade (including two box culverts and one garden culvert). The project structure is a single-layer multi span cast-in-place reinforced concrete frame structure, which adopts bored pile foundation. The canopy above the platform is a light steel structure.
  • Construction organization of pipe jacking works design scheme book
    The Fourth Water Plant covers an area of 119 mu, with a design scale of 200000 tons/day, and 100000 tons/day for Phase I construction. The estimated investment of the water source project is 14.6 million yuan, including the top steel pipe with a diameter of 1.4 m wall, process pipe installation, electrical pipe laying and other projects. Water source project: water intake steel pipe jacking (diameter 1.4m, single length about 800m, wall thickness 14mm, 2 pieces), water intake head, immersed pipe, water intake pump room, process equipment pipeline installation, embedded parts (electrical process, pipeline anti-corrosion, etc.). The proposed site has undulating terrain. The pipeline axis extends from west to east to the water intake pump house at 871.81m. It crosses a dike, a paddy field, a village, a soil road, a pond, a ditch and a paddy field in the middle of the Yangtze River, 2.10m. The river bottom (ZK1 hole) orifice elevation is -8.76m, and the height difference is 20.23m. There is a pond distributed in the middle of the pipeline axis, about 21.00m in width, 4.53m in water surface elevation and 2.00m in water depth. Its geomorphic unit belongs to the Yangtze River floodplain.
  • Construction organization of shotcrete anchor and earthwork design scheme book
    The proposed high-rise commercial and residential building has 3 floors in the basement and 31 floors above the ground. It covers an area of about 12000 m2. The north and south sides of the foundation pit are 85m long, the east and west sides are 135m long, the perimeter is about 440m, and the excavation depth of the foundation pit is 12m. The foundation pit adopts bolt shotcrete support scheme, which is designed by Guangdong Light Textile Industry Design Institute. 9 rows of anchor bolts are arranged in the east and south, without prestress; 10 rows of anchor bolts are arranged in the west and north, of which the 3rd, 5th and 7th rows of anchor bolts are prestressed. The thickness of concrete surface course is 150, and the thickness of local prestressed area is 200.
  • General Construction Organization of Power Plant Phase VIII Project design scheme book
    The construction of Shanghai Wujing Thermal Power Plant Phase VIII Project is a major infrastructure project in Shanghai to adapt to the national "Ninth Five Year Plan" and coordinate with the speed of Shanghai's economic development. The construction scale is planned as 4 × 600MW coal-fired power generation units. In this phase, two domestic Asian imported coal-fired units will be built. The project is located in the south of Wujing Thermal Power Plant in the south of Shanghai. The plant is adjacent to the Huangpu River in the east, Longwu Road in the west, Wujing Thermal Power Plant Phase VI in the north, and Beiwu Road in the south. The whole plant site is in a strip shape. The long axis forms an angle of about 45 ° with the Huangpu River shoreline, more than 450 meters from north to south, and more than 1000 meters from east to west. The total land acquired for the project is 89.4371 hm 2, and the plant area occupies 73.3 hm 2 of the ground area.
  • Construction Organization of Sunshine Mansion Project design scheme book
    Wenzhou Sunshine Building is located on the north bank of Oujiang River in Wenzhou City, at the intersection of Sunshine Avenue and Changxin Road, on the 9 # plot in the center of Sunshine Avenue. It faces Binjiang Garden in the south, Wenzhou City across Oujiang River, Oucheng Garden in the west, and Huaxin Hong Kong City across Changxin Road in the east. It is the most prominent project among high-rise buildings under construction along Sunshine Avenue. The total land scale of the project is 8240m2, and the total building area is 40200m2. The building is composed of a 32 story building and a 26 story building. The first floor of the basement is a large parking garage, the first to second floors are large modern malls, the third floor is a property management room, and the third floor and above are high-rise residential buildings. The structural type is frame shear wall structure. The planned investment is about 50 million yuan. The contract duration is 790 days from July 2001 to August 2003.
  • Construction organization of Yangguang Lijing Community design scheme book
    The project is located in Qinghua Town, Wanyuan City. The construction area is flat and connected with municipal roads. From the geographical location of the project, the construction is convenient and the location is prominent. Therefore, the goal of each constructor is to create a high-quality project. The public supporting facilities of the project are complete, the water and electricity supply can meet the project requirements, and the construction vehicles are convenient to enter and exit. It is an ideal construction site. The reinforcement used in this project includes grade I and II reinforcement. It is required that the reinforcement joint can be connected by welding or lapping; If lap welding is adopted, the welding length of single side welding is required to be 10d, and that of double side welding is 5d. Arc butt welding is also allowed; If overlapping is adopted, it is required to ensure that the overlapping length is 1.2 La for tensile reinforcement and not less than 300mm, and the overlapping length of compression reinforcement is not less than 0.85 La and not less than 200mm; The anchorage length of reinforcement shall be considered as 30d for Grade I reinforcement and 40d for Grade II reinforcement (C20 concrete).
  • Construction organization of a residential project in Yingtan City design scheme book
    The residential building project of a certain project is located in Yanjiang Road, the new urban area of Yingtan City. It is a new residential community developed by Yingtan City. The construction area of the basement of the project is 2885.30 square meters, all of which are 18 floors. The first underground floor is a civil air defense project. The civil air defense protection level of the project is level 6. The peacetime function is storage room, and the wartime function is personnel shelter. The number of sheltered personnel is 650 (4 #), 800 (5 #). The fire protection grade is Grade II, and the waterproof grade is Grade 1. Two layers of waterproof are set, one is concrete self waterproof, concrete grade C40S8, C35S8, and the other is waterproof coating. The basement is 3.9m high, a frame shear wall structure, without seismic fortification requirements, and the foundation is pile foundation.
  • Construction organization of theater project design scheme book
    The construction area of the project is 5890m2, the auditorium has two floors and 1460 seats. The design elevation is ± 0.00=47.35m, and the site design elevation is 46.10-46.60m. Position according to the given coordinates. The construction site covers an area of about 5360m2, which is 1.7 times the floor area of the building. It is relatively narrow. The natural elevation of the site is 46.10-46.60m, basically flat. The project adopts centralized heating and air supply. Fire fighting facilities include: fire curtain at the platform entrance, lower hanging smoke exhaust window at the side end of the stage steel roof truss, sprinkler system at the top of the stage and 12t fire water tank. The metal surfaces of all steel roof structural members are protected by fireproof paint.
  • Construction organization of residential building project in a city design scheme book
    The project adopts brick concrete structure, and is designed as per 6 degrees of fortification and four levels of seismic resistance. The project adopts reinforced concrete and rubble concrete strip foundation. The base elevation is ― 25m and ― 33m. This project is a residential building. The east-west axis 1 to 21 of Building 4 # is 36.0m long, and the north-south axis A to E is 12.0m wide. The basement floor height is 4.6m; The east-west sunny axis of Building 6 # is at least 66.59m long, and the north-south A-axis to E-axis is 11.4m wide. Eaves are 18.4m high and the highest elevation of the building is not 21.8m.
  • Construction organization of an office building reconstruction project design scheme book
    The project is located in a prosperous area, so the requirements for environmental protection and civilized construction management such as noise control and dust pollution control are very high; The construction period is tight, and the demolition, water supply and drainage, electrical decoration and reconstruction projects have large tasks, many cross operations, and high difficulty coefficient. This project is the reconstruction project of the office building of Harbin Daoli District Justice Bureau. Its external image is very important, so it has higher quality requirements than ordinary projects. In this project, the use of gypsum board butt joint crack resistance technology can avoid the common quality problems of butt joint cracks in gypsum board construction, and avoid the costs caused by later repair.
  • Construction organization of a culture and art center project design scheme book
    Culture and Art Center Project, with a floor area of 27300 square meters. Invested by the government and designed by a design institute. The project is novel and unique, intended to create a beautiful urban landscape like a poem, and will become the symbol of the city after completion. The culture and art center project consists of a theater and its auxiliary rooms, a cinema, a history museum, an art club and some conference halls. There are 3-5 floors above the ground and 1 floor underground. The basement is the equipment room and car and bicycle parking garage. The design durability of the main building is 50 years. The project is equipped with a basement with a floor height of 4.2 meters, and 5 meters and 6 meters locally. The foundation adopts reinforced concrete precast hollow pile, the bearing layer of pile end is silty clay layer, the pile diameter is 350 * 350mm, and the effective pile length is 22.75m and 21.55m. An independent cushion cap is set at the pile top, and a coupling beam is set between the cushion caps. The basement floor is 500 mm thick, and the external wall is 300 mm thick. The roof is a cross beam structure, and the plate thickness is 180 mm.
  • Construction organization of a dormitory maintenance project design scheme book
    The building is a seven storey brick concrete structure with a building area of 8670 square meters. The green flat tile flip of the original inclined roof, along the ditch, kitchen and other flat roofs are repaired with cement mortar, and then SBS waterproof layer is pasted, and the balcony awning is repaired with cement mortar. The walls and ceilings of stairwells and public corridors shall be painted with 803 paint after repair. Chisel off the cement mortar surface of the original stair tread and rest platform, and stick anti-skid floor tiles.
  • Construction organization of a staff residential building project design scheme book
    This project is the 2 # 4 # 5 # staff residential building project of the 22 Institute of Electronics of the Ministry of Information Industry, which is invested and constructed by the Qingdao Branch of China Radio Propagation Research Institute (22 Institute of Electronics of the Ministry of Information Industry) and designed by Qingdao Double Star Architectural Design Institute. The project is located at No. 19, Qingda 1st Road, Qingdao, and consists of 2 #, 4 # and 5 # residential buildings respectively, with strip foundation and brick concrete structure. Building 2 # and 5 # are equipped with one floor of semi underground outlets, five floors above the ground and one floor of attic; Building 4 # has a semi underground storage room on the first floor, six floors above the ground and one floor of the attic. The installation works mainly include electrical lighting, water supply and drainage, heating, telephone, television and intercom.
  • Construction organization of a residential building reconstruction project design scheme book
    The project name of this project is the renovation and decoration project of Shuangmen Hotel Building 6, 7 and auxiliary rooms. After fully considering the construction characteristics and difficulties of the project, we have sufficient confidence to ensure that the construction tasks of the renovation and decoration works of Shuangmen Hotel Buildings 6 and 7 and the ancillary buildings will be completed on schedule and in a comprehensive manner. Construction preparation: for the construction of ground stone, the material selection shall be square and square, the surface shall be flat and smooth, and there shall be no defects such as missing edges, corners, cracks, pollution and discoloration. Prevent moisture and pollution before removing packaging, and protect semi-finished products. Construction process: cleaning the base course → snapping the line → installing standard blocks → paving → patching → curing. Construction methods and technical measures
  • Construction organization of Shenzhen reclamation project design scheme book
    The project is located in the south of the three major scenic spots in Shenzhen, starting from Qiaocheng Road in the east, Shahe East Road in the west, Binhai Avenue in the south, and Baishizhou Road in the north, with a total land area of 288.5 hectares. Phase I project has been completed, and our bidding scope is Phase II project area V in the middle of the site, that is, Baishizhou South, section road here, and between No. 6 Road and No. 7 Road. The work scope of this section is 8m within the red line of the surrounding roads, with a processing area of 138020.9m2. This site belongs to the bay intertidal zone and marine plain. The original elevation of Haiti is between 0.7 and -2.9, lower than the average elevation of the sea surface. The area is evenly distributed with 5-7m thick sludge. The geological conditions are complex. Its main geological characteristics are: there is no marine alluvial muddy sand layer above the Quaternary marine sludge layer, and there is Quaternary eluvium below the sludge layer. The site is located in the subtropical region, with an average temperature of 22 ℃, a multi-year relative humidity of 79%, and an average rainfall of 1920mm. The rainy season is mainly from April to September.
  • Construction organization of formwork lifting and floor lifting warehouse project design scheme book
    The project is a factory warehouse workshop, with a floor area of 4507m2 above the ground and 741m2 in the basement, totaling 5248m2. The basement of the new project is an integral structure of cast-in-place reinforced concrete for Grade V civil air defense. The bottom plate is a floor without column cap and beam, and the top plate is a curtain roof. The rigid steel column takes root at the top of the basement wall column (-1.50m). The upper structure is a 5-story lifting structure, supported by rigid steel columns. The floor slab is a cast-in-place monolithic reinforced concrete beamless floor slab, which is prefabricated in place on site. Stairs and elevator shafts are made in situ, and the rigid steel columns are concreted along with the lift slip form. The elevator and staircase shall be cast-in-place concrete layer by layer, the floor shall be supported by rigid columns, and the roof slab shall be used as the sliding form lifting construction of the operating platform. The building and elevator shaft are the stable hinge point of the column during the rising process and the seismic wall in the use phase. The rigid steel column is processed by sections, assembled and hoisted on site. The heating steam pipe piece of the project is surface mounted, and the furnace piece is 4-column 813 floor type. The power supply is divided into power supply and lighting, and the line is concealed. The vertical line is laid in the cast-in-place concrete column. It is required to cooperate with the on-site civil construction. The basement is equipped with a ventilation system.
  • Construction organization of an office building decoration project design scheme book
    Project name: Chongqing Jiulongpo District Court Office Building Decoration Project. Project location: Dajian Road, Jiulong Park, Jiulongpo District, Chongqing. Project scale: the total construction area of the project is 10238.5m2, and the project structure is reinforced concrete frame structure.
  • Construction organization of grain storage project design scheme book
    The project is located in the eastern suburb of a city, a district, a township and a village in Jiangxi Province. The rainy season in this area is long, and the annual average rainfall is large. The site elevation is 36.123~36.67m, and the terrain is relatively flat. The buried depth of the ground water level in the site is generally 36.0~36.7m, and the elevation of individual water level is 37m. The ground water is abundant, but the ground water in the site is not corrosive to concrete, and is weakly corrosive to steel structures. The project was invested and built by a group and designed by a scientific research and design institute. It is a two-story office complex building with brick concrete structure. The floor height is 3.6m, the total height is 8.1m, and the building area is 996m2. It is the center of inspection, testing and control of the whole Jiujiang Zhonggu Grain Depot. The site has convenient access roads. Materials can be directly transported to the construction site. The power for the project has been connected to the site. The water for the project is mainly from the water collection wells and the original drainage ditches.
  • Construction organization of civil works design scheme book
    This project is located in the west of the first phase project of the coal preparation plant. The site area has been leveled. The absolute elevation of the site is 1171.000m, and the relative elevation is ± 0.000. The foundation is located on bedrock and loess like silt and loess like silty clay. The characteristic values of the foundation bearing capacity are fka=500kPa, 165kPa and 180 kPa, respectively.
  • Construction organization of a cadre rest center reconstruction project design scheme book
    Set two elevators and two stairs. The residential building is a reinforced concrete shear wall structure, which adopts a pile raft reinforced concrete foundation. Under the foundation is a φ 600 bored pile. The pile end bearing layer is a medium coarse sand layer ⑧. Except for the shear wall, the masonry is aerated concrete blocks. The floor method of the residential building: toilet, kitchen, lobby on the first floor, public antechamber, staircase and corridor are all floor tile floors, cement mortar floors are used in the residential building, and fine stone concrete floors are used in the basement. Interior wall method: ceramic tiles are used for kitchen and bathroom walls, cement mortar is used for basement, and synthetic resin emulsion coating is used for other interior walls. Exterior wall method: mainly synthetic resin emulsion flat exterior wall coating and glass curtain wall.
  • Construction organization of a building reconstruction project design scheme book
    The structure is cast-in-place frame shear wall structure with box foundation. The building has nine floors in total. The platform below ± 0.00 is three floors with box foundation. The upper floor is six floors with a total height of 68.3m. The frame column below ± 0.00 is a square column, and the frame column above ± 0.00 becomes a column. The column heads of the second to sixth floors of the building body are equipped with scroll and cogwheel buckets. On the second, third and fourth floors, the diameter of the round column is changed on the Cottage Bucket, and the axis of the outer groove column on the fifth floor is moved 500mm inward. The shear wall is set between the two ends, between axis D and axis G (D-E wall height up to ± 0.00) (E-G axis wall height up to the top of the building) and the four corners of the external trough column of the building body (as far as the external corner, the height up to the top of the first floor of the building body). The horizontal mudway arch from the first floor to the fifth floor of the building body, with a vertical jump of the Chinese arch, adopts prefabricated components for the arch of each floor, the complementary arch, part of the beam and all the bucket, and basically uses cast-in-situ concrete for other longitudinal arches and corner Chinese arches.
  • Construction organization of Hongda Garment Building design scheme book
    Hongda Garment Building Project is located in the south of Hongcheng Road, Hongcheng Market, Nanchang City. It is about 134m long from east to west and 81m wide from south to north. It covers an area of about 12000 square meters, with a total construction area of about 120000 square meters. At present, the demolition, temporary roads, temporary drainage facilities, temporary fences and other works have been basically completed, and the three supplies and one leveling of the site have been basically completed. The structural form of the project is 25 floors above the ground and 1 floor underground cast-in-place reinforced frame shear wall structure. The seismic fortification degree is 7, and the seismic fortification level of the frame is Level II. The seismic fortification of the project is based on Class I buildings.
  • Construction Organization of Dujuan Complex Building design scheme book
    The project is a full cast-in-place frame structure. The first floor of the basement is a garage, the first floor above the ground is a commercial room, and the second to sixth floors above are hotels. The design grade of the project is Grade III, the fire resistance grade is Grade II, the roof waterproof grade is Grade III, the semi basement fire resistance grade is Grade I, the waterproof grade is Grade II, and the service life of the building is 50 years; The seismic fortification intensity is Grade 6, the seismic grade of the frame and basement retaining wall is Grade 4, and the building safety grade is Grade 2.
  • Construction organization of a hotel reconstruction project in Guilin design scheme book
    Guilin reconstruction project is a five storey hotel, with garage and equipment room on the first floor, lobby, conference and restaurant on the first floor, and guest rooms on the second floor and above. Total construction area: 20131, including the aboveground construction area: 15789, and the underground construction area: 4342. Structure: frame structure; Foundation: punched cast-in-place pile; Wall: lime sand brick block. The project is located at No. 2, Jiangjun Road, Guilin, which is the intersection of Zhongshan South Road and Jiangjun Road in Guilin. The bearing wall, non bearing wall, exterior wall and interior wall of the project are made of lime sand bricks. MU10.0 bricks and M7.5 mixed mortar are used for masonry. The wall body of the first layer not built on the concrete beam slab is paved with 20 thick 1:2 cement mortar at the elevation of -0.050m, mixed with 5% waterproof agent as the damp proof layer. The roof waterproof grade of this project is Grade I, and the roof is pitched roof. See Page 14 of 99J201-1 W5A B1-80 and 98ZJ211 for details.