General weak current construction of the building design scheme
Quality grade: construction period and date of commencement and completion: the construction period of civil engineering is XXX days (calendar days), and it is required to complete the weak current system project simultaneously. The scope of work includes the weak current system works of the overground part of XXXXXX main building, podium and catering building, mainly including the integrated wiring system; Closed circuit monitoring and anti-theft alarm system; Cable TV, LED display system; Building automatic control system; Public address and conference system; Sound reinforcement system and projection system; Lightning protection and grounding system of computer network and weak current equipment; Stage lighting, sound and weak current supporting system; Computer network equipment and components; Smart card application system; SPC exchange system; Intelligent light control system; UPS、 Machine room construction, mobile call and wireless coverage system. The specific project contents include: loading and unloading, installation and positioning of equipment and materials, and connection of internal and external systems of the system; Storage of equipment and materials (including the arrival acceptance of equipment and materials purchased by the Employer), single machine commissioning and system commissioning, cleaning and protection of on-site equipment, and hole filling and repair of relevant buildings after equipment installation; Before the completion of the system, report to the relevant departments for inspection and cooperate with the construction party to complete the system test, acceptance and warranty service after the project completion acceptance.