Installation and construction of ventilation and air conditioning equipment design scheme
After the refrigeration unit, cooling tower, water pump, air conditioning unit, fresh air unit, fan coil unit, plate replacement and other major equipment are delivered to the site according to the arrival date, relevant personnel shall be organized to count the parts, check the appearance, check the model and size, quantity, whether the equipment is damaged, missing parts, rust and other conditions, whether the pipe mouth protectors and caps are in good condition, and the turning gear of the pump shall be flexible, Transport in place after meeting the design and contract requirements; If it cannot be put in place immediately, measures shall be taken for protection; After the basement equipment (refrigeration unit, plate exchange, water pump, air conditioning unit, fresh air unit, etc.) is transported to the site, roller and other tools can be used to put them in place and align them according to the site conditions; After the ground equipment (cooling tower, fresh air unit, fan, fan coil unit, etc.) is transported to the site, negotiate with the project cooperation party, and use lifting equipment to transport them to the installation location and align them; The materials of air duct and water pipe transported from the processing place to the site or the pipe sections processed on the site shall be inspected in time and matched with each other. Equipment and materials not used temporarily shall be stacked neatly and padded up. The machines and tools used during installation shall be subject to safety inspection, and the unqualified ones shall not be used. The holes and scaffolds used for installation shall be checked, and if there are problems, relevant personnel shall be timely asked to deal with them, so as to create conditions for ensuring the installation progress.