Construction Scheme of 20t Boiler in a Community in Tangshan
Content Introduction The boiler installation project is the installation project of three DZL14-1.25/130/70-AII hot water boilers, auxiliary equipment, pipes, etc. for heat supply in a community in Tangshan. The whole boiler is composed of upper drum components, lower water pipe system components, mechanical chain grate, coal feeding device, furnace wall arch, steel structure frame, body valve instrument, etc. In addition to the boiler host, it is also supplemented by coal chute, blower and induced draft fan, electrical instrument pipeline, process pipeline, flue gas and air pipeline system to ensure the continuous heat supply operation of the boiler