Installation project of a museum in Jiangsu Budget estimate
The preparation scope of this project is: 1. Electrical engineering includes: power transformation and distribution engineering, strong current engineering, elevator engineering, fire alarm engineering (including public broadcasting and fire broadcasting engineering, large space system), fire leakage alarm engineering, building equipment monitoring engineering, communication network and integrated wiring engineering, satellite television and cable television engineering Security engineering (access card, closed circuit monitoring system, anti-theft alarm system, patrol system, etc.), integrated system, parking lot management system. 2. Equipment engineering includes: ventilation and air conditioning engineering, water supply and drainage engineering, and fire fighting engineering. Each project includes the following statements: summary table of unit project cost, valuation table of entity project, valuation table of measure project, analysis table of measure project cost, valuation table of other projects, and summary table of manpower, materials and machines.