2. The main bridge of the superstructure is an 80+80m double hole prestressed concrete partial cable-stayed bridge, and the approach bridges are 1X32m and 4X32m prestressed concrete constant cross-section box continuous beams, respectively. The substructure is a reinforced concrete U-shaped abutment, slab pier, and bored pile foundation. 3. Design load of this bridge: urban level A, automobile - over 20, trailer - 120 checking calculation. 4. The clearance under the bridge along the river is not less than 3.5m.