The basement floor is 400mm, 600mm and 700mm thick, the concrete strength grade is C30, and the impermeability grade is S6. As the foundation slab is constructed in sections, the concrete volume of each section is large, and the construction phase of the bottom slab is in winter. It is necessary to ensure that the continuous pouring of concrete will not delay the progress, and that the winter construction and maintenance can meet the concrete quality acceptance standards. It must go through a strict construction organization plan and adequate material preparation. This is the key construction content of the project. See the Foundation Slab Concrete Construction Scheme for details.

 The latest complete construction scheme for concrete works - Figure 1

The latest complete construction scheme for concrete works - Figure 1

 The latest complete construction scheme for concrete works - Figure 2

The latest complete construction scheme for concrete works - Figure 2

 The latest complete concrete construction scheme - Figure 3

The latest complete construction scheme for concrete works - Figure 3

 The latest complete construction scheme for concrete works - Figure 4

The latest complete construction scheme for concrete works - Figure 4

 The latest complete construction scheme for concrete works - Figure 5

The latest complete construction scheme for concrete works - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment