Special blasting scheme for highway subgrade construction
The total length of the highway project is 2.611km, which is divided into two sections: the first section of the design road is located in the Xiwei area, the starting point is connected to the existing No. 7 Road, the route extends along the ridge, generally in north-south direction, and finally K1+600, with a total length of 1600m; The second section (Shitou Gorge Section) starts at K0+000 at K1+080 of the first section, and ends at the current village road of Guankou Village at K1+011.103, with a total length of 1011.103m, roughly in east-west direction. The main contents include road works, culvert works, pipeline works, lighting works, traffic safety facilities and environmental protection. The subgrade of section K0+895~K1+022 of the first section is stone cutting, which requires blasting. Due to the density of various safety risk points affected by blasting, it is proposed to adopt a special scheme to control blasting to carry out subgrade rock excavation. According to the topography and landform of the subgrade, the distance from the geological conditions and various safety risk points, and the principle of "close drilling, careful orientation, weak blasting, and strong protection", the corresponding special blasting control scheme is formulated.