In the whole supervision process, we insisted on giving priority to prior control and active control, prepared the supervision plan according to the contract and design documents, formulated specific supervision work procedures, and defined the work content, behavior subject, acceptance standards and work requirements. Before the commencement of the project, according to the requirements of supervision specifications, we reviewed the qualifications of the construction company, the on-site quality management, technical management organization, personnel, systems, and the qualifications and work permits of operators for special types of work. According to the report form of construction organization design scheme submitted by the Contractor, the construction organization design was reviewed, and the Supervision Plan was prepared accordingly to conduct on-site review on the measurement, positioning and setting out of the project, including axis size and horizontal elevation, which further clarified the supervision objectives and requirements, creating conditions for the smooth implementation of the supervision work.
Quality Assessment Report of a Construction Project - Figure 1
Quality Assessment Report of a Construction Project - Figure 2
Quality Assessment Report of a Construction Project - Figure 3
Quality Assessment Report of a Construction Project - Figure 4
Quality Assessment Report of a Construction Project - Figure 5
Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!
Collection
share
WeChat code scanning and sharing
Click to share