Uploaded on: December 26, 2019 12:56:34
zero
5 points

6. Deep foundation pit with construction site more than 1.5m or foundation pit engineering with excavation depth less than 5m (including 5m) but extremely complicated geological conditions, surrounding environment and underground pipelines inspected by the safety supervisor. 2. Hoisting (hoisting works and steel structure hoisting with a lifting capacity of 30T or a lifting height of 10m) 3. Assembly and disassembly of large machinery, lifting joint (tower crane passenger cargo elevator), derrick erection and disassembly 4. Temporary power supply at the construction site 5. Scaffold erection and disassembly works...... 1) The safety supervision engineer shall check the "three guarantees" For the protection of "four openings", the General Contractor shall be urged to do a good job in the protection of the edges and openings of the construction site. When there are no protective facilities at the edge of the construction face or the height of the enclosure facilities is less than 80cm, the construction unit shall be required to set up temporary protective railings. At the same time, the safety supervision engineer shall master the ground entrance of the project under construction and the upper part of the passageway where the construction site is densely populated, and set up protective sheds as required to prevent object strike accidents caused by falling objects (4) For the installation and removal of formwork more than 2 meters, scaffolding shall be erected and protective railings shall be set to prevent the operation from being conducted on the same vertical plane. For formwork with a height of more than 3m, diagonal bracing shall be set around and an operating platform shall be set. If the column formwork is more than 6m, several column formworks shall be connected as a whole. (5) The operator must walk on the sidewalk when climbing high. It is strictly prohibited to climb up and down with formwork support, and it is not allowed to walk on the wall top, independent beams and other high narrow and unprotected formwork surfaces (3) During the operation on each floor, it must be confirmed that it stops on this floor before entering the lift car, and it is not allowed to enter just by looking at the floor lights. Cut off the parking switch or power supply during pit operation. (4) When the power supply of the elevator changes, the phase sequence must be checked before power transmission again to prevent the elevator from losing control or the motor from burning. (5) For ladder test in winter, low-temperature gear oil shall be added to the traction machine. If the elevator is stopped for a long time and the lubricating oil is checked for condensation, measures must be taken before starting Insulated conductors must be used for overhead lines. The sectional area of overhead insulated copper core shall not be less than lOmm2, and the sectional area of overhead insulated aluminum core conductor shall not be less than 16mm2. Within the span spanning railway and pipeline, the sectional area of copper core conductor shall not be less than 16mm2, and the sectional area of steel core and aluminum strand shall not be less than 25mm2. The aluminum stranded wire shall not be less than 35 mm2, and the conductor shall not have joints.

 Operation Instruction for Safety Supervision of Housing Construction Project - Figure 1

Operation Instruction for Safety Supervision of Housing Construction Project - Figure 1

 Operation Instruction for Safety Supervision of Housing Construction Project - Figure 2

Operation Instruction for Safety Supervision of Housing Construction Project - Figure 2

 Operation Instruction for Safety Supervision of Housing Construction Project - Figure 3

Operation Instruction for Safety Supervision of Housing Construction Project - Figure 3

 Operation Instruction for Safety Supervision of Housing Construction Project - Figure 4

Operation Instruction for Safety Supervision of Housing Construction Project - Figure 4

 Operation Instruction for Safety Supervision of Housing Construction Project - Figure 5

Operation Instruction for Safety Supervision of Housing Construction Project - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

  • Supervision work Instruction (Supervision planning and safety supervision scheme)
    Work instructions for safety supervision scheme II. Work content of safety supervision: 1. Construction preparation stage: 1. The supervision plan containing safety supervision content shall be prepared according to the provisions of the Regulations on the Administration of Work Safety, the mandatory standards for project construction, the Supervision Specifications and the requirements of relevant industry supervision specifications. 2. The supervision unit shall prepare detailed rules for the implementation of safety supervision for medium-sized and above projects and divisional and subdivisional projects with greater risks as specified in Article 26 of the Regulations on the Administration of Work Safety in Construction Projects. 3. Review whether the safety technical measures in the construction organization design prepared by the construction unit and the special safety construction scheme for divisional and subdivisional works with greater risks meet the requirements of the mandatory standards for project construction. The main contents of the review include:...... 73 pages in total, 49000 words
  • Safety supervision of a company in Beijing Instruction
    Safety supervision work statement 1. General project safety and civilized construction supervision checklist 2. Basic project safety and civilized construction supervision checklist 3. Large hole pile project safety and civilized construction supervision checklist 4. Scaffolding system safety and civilized construction supervision checklist 5. Construction machinery safety and civilized construction supervision checklist 6. Material elevator safety and civilized construction supervision checklist 7 Supervision Checklist for Safe and Civilized Construction of "Three Treasures/Four Outlets" 8. Supervision Checklist for Safe and Civilized Construction of Temporary Electricity 9. Supervision Checklist for Safe and Civilized Construction of Other Projects 10. Supervision Checklist for Safe and Civilized Construction of Fire Fighting 11. Supervision Checklist for Safe and Civilized Construction of Living Quarters...... 28 pages in total
  • Safety supervision planning of housing construction project (model)
    Project name: Project location: Employer: Supervision unit: Construction unit: Design unit: Planned construction period: II. Scope of safety supervision Site safety and civilized construction supervision during the construction phase. 3、 Contents of safety supervision (I). Main contents of safety supervision in construction preparation stage 1. Review special protection measures for construction site and adjacent buildings, structures and underground pipelines. (1) The supervising engineer shall participate in the handover of the construction unit's providing the construction unit with the construction site and the data of the inland and underground pipelines in the adjacent areas and the data of the adjacent buildings, structures and underground works, and sign on the handover sheet; (2) Before commencement, the supervising engineer shall review the special protection measures for adjacent buildings, structures and underground pipelines formulated by the construction company, and the chief supervising engineer shall sign comments on the Engineering Technical Document Review Form. When the special protection measures do not meet the requirements, the Chief Supervision Engineer shall require the construction unit to modify and re submit for approval.
  • [Hunan] Housing construction project safety supervision planning
    The Changsha xx Project is located in Yuhua District, Changsha City, with Wanjiali Road to the east, Zhenhua Road to the south, Branch Road 8 to the west, and Environmental Protection Avenue to the north. Changsha xx project has a total land area of about 107000 square meters and a total building area of about 397800 square meters, including 193200 square meters for high-rise residential buildings, 32300 square meters for business apartments, 31100 square meters for office buildings, 64500 square meters for independent commercial and commercial villas, and 76700 square meters for basement.
  • Site supervision scheme for safety supervision of housing construction project
    This document is a site supervision plan for safety supervision of housing construction projects, including project overview, implementation methods of site supervision, and contents of site supervision. It is detailed and accurate in content and design, and can be downloaded for reference by netizens.
  • Construction supervision of a foundation project Instruction
    This document is a work instruction for construction supervision of a foundation project. The contents include supervision operation instructions. The contents are detailed for reference.
  • Supervision of a bridge project Instruction
    The bridge pile foundation construction can be submitted separately as an independent sub project, and the commencement application report can also be included in the whole bridge commencement report. The commencement report shall list in detail the name of the construction bridge, the pile number of the bridge location, the construction technology and specific equipment to be used in the construction organization plan, and the personnel preparation. A written report shall be submitted to the Chief Engineer (Senior Resident Supervision Engineer) according to the contract provisions and specifications and the deadline requirements specified in the supervision procedure.
  • Engineering survey supervision review Instruction programme
    The control survey of the project is divided into horizontal control survey and vertical control survey. For general projects, the level of the first level horizontal control network shall not be lower than the fourth level (including the fourth level), and the level of the internal construction horizontal control network (secondary encryption control) in the work area shall not be lower than the second level (including the second level). For large or special construction projects, the level of the control network shall be raised by one level.
  • Supervision planning preparation Instruction engineering
    The key points of quality control of the project are the key points of construction quality control. The key points of quality control should be set according to the characteristics of the project, grasp the main factors affecting the construction quality of the process, analyze the reasons for affecting the quality of important parts or weak links in the process activities in advance, and propose corresponding measures for pre control.
  • Supervision process operation Instruction Assembly engineering
    Supervision plan of the project: a guiding document prepared under the leadership of the supervision engineer and approved by the technical director of the supervision unit, which is used to guide the project supervision organization to comprehensively carry out supervision work.
  • Supervisor witnessed sampling and inspection Instruction engineering
    Before the commencement of the construction of the project, the project supervision organization shall urge the contractor to implement the inspection unit of witness sampling as soon as possible. If necessary, the inspection (test) unit of witness sampling for inspection can be directly selected with the construction unit. The supervision engineer shall conduct field investigation on the test and detection unit proposed by the construction contractor, The test and detection unit must be a third party that has no administrative affiliation with the construction contractor.
  • Supervision internal management Instruction engineering
    The project data shall be managed by levels, and the chief supervision engineer of each project supervision department shall be responsible for the whole process management of the supervision data of the project supervision department; The full-time or part-time information documenter of each project supervision department is responsible for the collection and sorting of engineering data; The urban construction archivist of each department is responsible for the audit; After completion, the project director shall organize all professionals and information documenters to sort them out, which shall be reviewed and signed by the urban construction archivist, finally signed by the director, and then submitted to the company office for archiving (handling handover procedures).
  • Supervision of prestressed works Instruction programme
    The concrete work of this project includes concrete mixing, transportation, pouring, vibrating, curing and other processes. The requirements and methods are basically the same as those of the in-situ bridge construction. However, since the equipment and technical conditions of the prefabrication yard or prefabrication factory are better than those of the site, the concrete work may be organized more reasonably and effectively to meet higher quality requirements.
  • Supervision of prestressed works Instruction Design
    Operation guide object, basis for prestressed engineering supervision, and operation manual for prestressed engineering supervision
  • Supervision of communication base tower project Instruction
    Process name Process work content Supervisor's responsibilities Achievements refer to standards Other remarks 1. Project commencement 1. Organize and hold the first site meeting; 2. Approve the Construction Organization Design; 3. Approve the Project Commencement Report; 4. Prepare supervision rules 5. Qualification review of subcontractors 6. Engineering positioning survey 7. Material mobilization inspection 8. Review the construction schedule 1. Attend the meeting and assist the supervising engineer to make relevant preparations; 2. Understand the review points of Construction Organization Design and assist in the review; 3. Understand the review points of the Project Commencement Report and assist in the review; 4. Understand the key points of preparation of Supervision Rules 5. On site inspection and understanding of subcontractors 6. Be familiar with the drawings, exploration reports and relevant specifications for field measurement 7. Inspect the mobilized materials, components, fittings and equipment, and the unqualified products shall not be used in the project 8. Understand the construction schedule, track the project progress, and understand the process requirements of each process. 1、 minutes of the meeting 2. Review Record of Engineering Technical Document Approval Form 3. Review Record of Project Commencement Approval Form 4. Key points of supervision details 5. Review Record of Subcontractor Qualification Review Form 6. Inspection Record of Application Form for Construction Surveying and Setting out 7. Inspection Record of Inspection Application Form for Mobilization of Engineering Materials 8. Review Record of Construction Schedule Approval Form 1. Prepare according to the preparation requirements of the company's meeting minutes; 2. Supervision specifications; 3. Supervision specifications; 4. Supervision specifications and regulations of the company; 5. Supervision specifications; 6. Refer to the requirements of drawings, exploration reports and element tables 1. The Minutes of Meeting shall be completed and distributed to the participants the next day after the meeting; 2. Keep supervision log every day. 2. Acceptance of foundation trench 1. The construction unit shall fill in the acceptance data of sub divisional/divisional works construction inspection application form, and the acceptance records include: 1) Engineering positioning survey record 2) Foundation trench line inspection record 3) Foundation trench inspection record 4) Foundation treatment records (used in special cases) 5) Review and inspection application materials of foundation drilling exploration records (as required) 2. Site acceptance (including the following) A、 Dominant items: a, elevation, b, length and width, c, slope B、 General items: a. Surface flatness; b. Low soil property of foundation 3. The supervising engineer signs for approval 1. The supervisor of this control point must be present; 2. Assist the supervising engineer to check the inspection application data of the construction unit; 3. Inspect the construction site and check whether the construction unit has constructed according to the drawings, including checking the position, plane size and bottom elevation of the foundation pit; 4. Check the soil quality and groundwater of foundation pit according to the geological exploration report; 5. Check whether there are holes, ancient tombs, ancient wells, air defense shelters and underground buried objects at the bottom of the foundation trench, as well as the position, depth and shape of the above objects. 1、 Foundation trench line inspection record 2. Foundation trench inspection record A、 Dominant items: a, elevation, b, length and width, c, slope B、 General items: a. Surface flatness; b. Low soil property of foundation 3. Foundation treatment records (used in special cases) 4. Foundation drill rod exploration record Code for Acceptance of Construction Quality of Building Foundation Engineering GB50202_2002 6.2.1, 6.2.2 and 7.1.3 The supervisor shall inspect the reliability and authenticity of the materials reported by the construction company according to the on-site measurement of the specifications. Foundation treatment includes: Quicksand, silt and other conditions shall be reported to the supervising engineer in time, and the supervising engineer's guidance, suggestions and opinions shall be listened to. 3. Reinforcement works 1. Filled in by the construction unit 1) Inspection Application Form for Mobilization of Engineering Materials 2) Steel product certificate, delivery inspection report, mobilization re inspection report 3) Inspection records of concealed works, 2. Review the inspection application materials 3. Qualified in site acceptance 4. Signature and approval of supervising engineer 1. The supervisor of this control point must be present; 2. Assist the supervising engineer to check the inspection application data of the construction company. The inspection application data must be complete, or the site acceptance will not be carried out; 3. On site inspection and on-site verification of the mechanical properties of steel, the measured value of the strength of seismic reinforcement, chemical composition and other special inspections, the hook and bend of the load-bearing reinforcement, the hook form and appearance quality of the stirrup, the net size of the load-bearing reinforcement along the length direction, the net size in the stirrup, the connection method of the longitudinal load-bearing reinforcement, the load-bearing reinforcement and its type, grade, specification and quantity, The length and width and mesh size of the binding reinforcement mesh, the length, width and height of the binding reinforcement skeleton, the spacing, row spacing and thickness of the protective layer of the stressed reinforcement, and whether the construction unit has constructed according to the drawings and specifications; 1、 Fill in the relevant contents of the acceptance record of reinforcement processing inspection lot I II on site 2. Fill in the supervision log, including: on-site inspection records of reinforcement works, project progress, and relevant dynamics of on-site workers, materials, and machines. Code for Acceptance of Construction Quality of Concrete Structures (GB50204_2002) 5.1.1, 5.2.1, 5.2.2, 5.5.1 The supervisor shall report the quality problems to the supervising engineer in time, listen to the guidance of the supervising engineer, and carry out the on-site supervision work in strict accordance with the requirements of the guidance. 4. Installation of embedded parts 1. The construction unit shall fill in the inspection application materials (including), construction tables and acceptance records of subdivisional/divisional works: 1) Inspection application record of engineering materials mobilization 2) Steel Product Certificate Inspection Record 3) Inspection record of concealed works 2. Review the inspection application materials 3. Qualified in site acceptance 4. The supervising engineer signs for approval 1. The supervisor of this control point must be present; 2. Assist the supervising engineer to check the inspection application data of the construction company. The inspection application data must be complete, or the site acceptance will not be carried out; 3. Check the specification, model, installation elevation, flatness, center distance, diagonal dimension and rust and dirt removal of the embedded parts, fill in the supervision log, including: specification, model, installation elevation, flatness, center distance, diagonal dimension and rust and dirt removal of the embedded parts, project progress, relevant developments of on-site workers, materials and machines Code for Acceptance of Construction Quality of Steel Structures GB50205-2001 4.2.1, 4.3.1, 4.4.1, 5.2.1, 5.2.4 The supervisor shall report the quality problems to the supervising engineer in a timely manner, listen to the supervising engineer's guidance, and carry out the on-site supervision work in strict accordance with the requirements of the guidance 5. Formwork 1. The construction unit shall fill in the inspection application materials, including: construction inspection application form for divisional/sub divisional works; Acceptance records include: 1) Inspection application record of engineering materials mobilization 2) Engineering pre inspection record (formwork engineering) 2. Review the inspection application materials 3. Qualified in site acceptance 4. The supervising engineer signs for approval. 1. The supervisor of this control point must be present; 2. Assist the supervising engineer to check the inspection application data of the construction company. The inspection application data must be complete, or the site acceptance will not be carried out; 3. Check the geometric dimension, centerline, elevation, firmness of formwork, tightness and strength of joints, rigidity, cleaning inside the formwork, painting of release agent, etc. of formwork erection. 1、 Carry out on-site inspection and fill in the relevant contents of the main control items and general items in the Inspection Lot Quality Acceptance Record Form I of Formwork Installation Works; 2. Fill in the supervision log, including: on-site inspection, on-site inspection records, project progress, relevant dynamics of on-site workers, materials and machines Code for Acceptance of Construction Quality of Concrete Structures GB50204_2002 4.11 、 4.13 The supervisor shall report the quality problems to the supervising engineer in time, listen to the supervising engineer's guidance, and carry out the on-site supervision work in strict accordance with the requirements of the guidance 6. Concrete works 1. The construction unit shall fill in the inspection application materials, including: construction table of subdivisional/divisional works; Acceptance records include: 1) Inspection application form for engineering materials mobilization, including cement: certificate of conformity, ex factory inspection report, cement test report; Sand: sand test report; Stone: acceptance record of crushed (pebble) stone test report. 2) Acceptance records of concrete mix proportion and concrete opening identification data. 2. Review the inspection application materials 3. Qualified in site acceptance 4. The supervising engineer signs for approval. 1. The supervisors at this control point must be present and conduct 24-hour on-site supervision; 2. Assist the Supervisor i to check the inspection application data of the construction company. The inspection application data must be complete, or the site acceptance will not be carried out; 3. Check the cement certificate, factory inspection report and cement test report; Sand: sand test report; Stone: acceptance record of crushed (pebble) stone test report. Concrete factory certificate, mix proportion application form, opening appraisal, and on-site witness sampling shall be recorded. Appearance quality and curing of concrete 1. Site supervision records. 2. Fill in the supervision log, including: on-site inspection, on-site inspection record, project progress, relevant dynamics of on-site workers, materials and machines 3. According to the on-site inspection results, fill in the concrete construction inspection lot quality acceptance record form II related contents of main control items and general items Code for Acceptance of Construction Quality of Concrete Structures GB50204_2002 7.2.1, 7.2.2, 7.4.1, 8.2.1, 8.3.17.4.1 The supervisor shall report the quality problems to the supervision engineer in time, listen to the guidance of the supervision engineer, and carry out the on-site supervision work in strict accordance with the requirements of the guidance 7. Backfill 1. The construction unit shall fill in the inspection application materials, 2. Review the inspection application materials 3. Qualified in site acceptance 4. Signature and approval of supervising engineer 1. Supervisors at this control point must be present 2. Focus on the quality control of backfill, Code for Acceptance of Construction Quality of Building Foundation Engineering GB50202_2002 6.3.1, 6.3.2, 6.3.3 The supervisor shall report quality problems to the supervising engineer in a timely manner, listen to the supervising engineer's guidance, and carry out on-site supervision work in strict accordance with the requirements of the guidance 8. Ground resistance test 1. The construction unit fills in the inspection application materials 2. Review the inspection application materials 3. Qualified in site acceptance 4. Signature and approval of supervising engineer 1. The supervisor of this control point must be present; 2. Assist the supervising engineer to check the inspection application data of the construction company. The inspection application data must be complete, or the site acceptance will not be carried out; 3. Check whether the construction unit conducts construction according to the drawings and specifications on site; 4. The ground resistance measurement value must be recorded truthfully, and the acceptance record of the construction inspection application form of sub divisional/divisional works must be recorded; Acceptance records include: 1. Inspection application record of engineering materials mobilization 2. Product certificate, factory inspection report, salt adding record 3. Inspection records of concealed works comply with Code for Design of Lightning Protection of Buildings GB50057_94 4.3.1 to 4.3.8, and at the same time, the resistance shall meet the design requirements. The supervisor shall report quality problems to the supervising engineer in a timely manner, listen to the supervising engineer's guidance, and carry out on-site supervision work in strict accordance with the requirements of the guidance 9. Commencement of tower steel structure project 1. Organize and hold the first site meeting; 2. Approve the Construction Organization Design; 3. Approve the Project Commencement Report; 4. Prepare supervision rules; 5. Review the tower construction schedule. 1、 Be familiar with design documents and project overview; Attend the meeting and assist the supervising engineer to make relevant preparations; 2. Understand the review points of the Construction Organization Design, and assist in reviewing the Construction Organization Design of the tower prefabrication and installation project submitted by the construction unit; 3. Understand the review points of the Project Commencement Report and assist in the review; 4. Understand the key points in the preparation of Supervision Rules, Assist in preparation; 5. Understand the overall project progress, and assist in reviewing the tower fabrication and installation schedule. 1、 Work records and minutes of site meetings; 2. Review records of key points of Construction Organization Design; 3. Review record of Project Commencement Report; 4. Work records; 5. Review record of construction schedule review form. 1. Work records and minutes of site meetings; 2. Supervision specifications; 3. Company regulations; 4. Refer to the construction requirements of the Employer. 1. The meeting should be held together with tower foundation and foundation works. 10. Recheck the tower foundation and bearing surface 1. The construction unit fills in the inspection application data; 2. Site acceptance is qualified; 3. The supervising engineer shall sign for confirmation. 1、 The construction unit shall fill in the inspection application data (registration form) after detecting the axis and elevation of the tower foot foundation, the support surface, the specification and location accuracy of the anchor bolts; The supervisor reviews whether the inspection application data are complete and complete; 2. The supervisor shall be present to review whether the data meet the design and specification requirements; 3. After the supervisor passes the field inspection, it shall be countersigned by the professional supervision engineer. Registration form of tower foundation and bearing surface recheck test data Code for Acceptance of Mobile Communication Engineering Steel Tower and Mast Structure YD/T5132-2005: Article 8.2. See Attached Table TY-1 for the format of registration form 11. Structure Incoming acceptance of components 1. Raw material inspection; 2. Processing inspection of parts and components (including inspection of outsourced parts such as fasteners); 3. Welding engineering inspection; 4. Inspection of anti-corrosion works. When transporting tower components to the installation site, supervisors must enter the site to inspect and accept the component quality: 1. Measure whether the raw materials used for main materials and other components conform to the design and specifications; 2. Check whether the processing elements of parts and components are consistent; 3. Meet the design and specification requirements; 4. Check the factory quality inspection records of welding appearance quality and internal defects of welded components; 5. Check whether the quality of hot-dip galvanizing and other anti-corrosion measures meet the design and specifications. 1、 Member mobilization quality acceptance record form (including 1-4 items); 2. Factory quality acceptance record of inspection lot of tower steel structure subdivisional works: including processing of parts and components (including raw material qualification certificate and re inspection report); Welding engineering; Quality acceptance records of three subdivisional works of anti-corrosion works (provided by the construction unit). Code for Acceptance of Mobile Communication Engineering Steel Tower and Mast Structure (YD/T5132-2005). 1. Raw material: YD/T5132-2005 Articles 4.2.1-5, 4.3.1-2 and 4.4-6; 2. Processing: YD/T5132-2005 Section 6.2-6. 3. Welding: Article 5.1 and 5.2 of YD/5132-2005; The welding of single pipe tower shall also meet Article 7.7.9 of CECS236:2008. 4. Corrosion prevention: Article 7.2.2-5 and 7.3.1-2 of YD/5132-2005; 1、 See Attached Table TY-2 for the format of component mobilization quality acceptance record; 4. Factory quality acceptance record of inspection lot of tower steel structure subdivisional works: as per YD/T5132-2005 12 Installation of tower components 1. Approve the tower installation commencement report; 2. Safety inspection on installation site; 3. Component installation: 3.1 Connection of fasteners; 3.2 The tower components shall meet the design requirements and be installed smoothly; 3.3 Connection of flange plate; Joint rate of gusset plate connection (in case of bolt shear connection); 3.4 Installation of steel platform and antenna support; 3.5 Installation of ladder, cable rack and bridge; 3.6 Installation of mast stay wire and clamp; 3.7 Overall verticality; 3.8 Installation of single pipe tower socket; 3.9 Installation of lightning protection structure. 1. According to the approved Construction Organization Design Check the installation conditions according to the requirements of the specification The installation shall be confirmed by the supervising engineer; 2. It is required to improve the installation and construction management system Organization and implementation; Wear safety helmet and safety belt during construction There are warnings in the operation area; Operators shall work with certificates; Those without climbing permit are forbidden to work on the tower; Ensure the safety management in place and civilized construction on site; 3. Be familiar with design documents; Check whether the installation quality of each part of the tower and mast and the overall structure meets the design and specification requirements; 4. Supervise the construction unit to organize according to the approved construction Design operation; Construct according to design requirements and specifications; Stop on-site fire cutting or forced installation; When hoisting other components and equipment with the installed structure, the strength and stability calculation results shall be submitted, and the components that are easy to deform shall be reinforced with the consent of the design unit. 1. Tower installation commencement report; 2. Safety inspection record form; 3. On site inspection record of tower installation subdivisional works. 1. Code for Acceptance of Mobile Communication Engineering Steel Tower and Mast Structure (YD/T5132-2005:8.1.3); 3.1 YD/T5132-2005: Article 8.3; 3.2 YD/T5132-2005: Article 8.4.1; CECS80-2006: Article 9.5; 3.3 YD/T5132-2005: Articles 8.4.6 and 8.4.7; 3.4 YD/T5132-2005: Articles 8.4.8 and 8.1.6; 3.5 YD/T5132-2005: Articles 8.4.4 and 8.1.11; 3.6 YD/T5132-2005: Articles 8.3.4, 8.4.3, 8.1.4 and 8.1.5; 3.7 YD/T5132-2005: Article 8.4.2; 3.8 CECS 236:2008: Article 8.6; 3.9 Lightning protection structure shall be installed according to design requirements 2. See Attached Table TY-3 for the format of safety inspection record form; 3. See Attached Table TY-4 for the format of on-site inspection record of tower installation subdivisional works.
  • Improved soil engineering supervision Instruction
    Construction process requirements 5.2.1 Before the acceptance of the filling of the lower bearing layer, the geometric dimensions of the base should be checked, and the compaction standard should be checked (the detection and acceptance of the relevant processes should be carried out). The base that does not meet the standard should be treated to make it meet the acceptance standard. 5.2.2 Survey and setting out shall introduce temporary benchmarks near the construction site, report to the supervisor for approval, and strictly control the elevation; The amount of filler shall be controlled by the square grid on the subgrade. The longitudinal pile spacing of the square grid shall not be greater than 10m. The square grid piles shall be set on both sides of the subgrade and at the center of the subgrade in the transverse direction. Indicator piles shall be set outside the edges of road shoulders on both sides, and the dumping density of dump trucks shall be controlled with lime points in the grid to control the paving thickness of each layer. 5.2.3 Stabilized soil mixing equipment shall be used for mixing improved soil mixture in the mixing plant, and soil crushing equipment shall be equipped to remove soil lumps. Calibrate the measuring equipment, adjust the discharge amount per unit time at the discharge outlet, so that all kinds of materials entering the mixing equipment meet the requirements of mixing ratio; In addition, special attention shall be paid to whether the discharge volume per unit time at the discharge outlet is basically the same as that during calibration, and whether there are abnormal conditions such as blockage of the discharge outlet during formal mixing. When mixing the improved soil mixture in the mixing equipment, it is required to mix evenly, and the mixture shall not contain more than 10mm of soil blocks and undigested lime particles; The composition and moisture content of the mixture (the relationship between the moisture content during mixing and the optimal moisture content during rolling shall be adjusted according to the weather conditions) shall meet the specified requirements. Before formally mixing the improved soil mixture, the plant mixing equipment must be commissioned, and the plant mixing process parameters must be further reasonably adjusted and determined through various construction parameters summarized from the trial mixing and trial paving of the test section 5.2.5 Paving Calculate the paving area of each truck of mixture according to the loose paving thickness, and determine the stacking density. At the filling site, according to the quantity and paving thickness of each vehicle of earthwork, use lime points to control the dumping density of dump trucks, and at the same time, bury piles and hang lines to mark the loose paving thickness; After paving the mixture, first use a grader for initial leveling and shaping, and then use a roller to quickly roll it for 1-2 times. The pits shall be leveled. The mixture shall be initially leveled and then finely leveled. Special personnel shall be assigned to timely remove the segregation mixture and add new mixture. The compaction thickness of layered filling shall be carried out according to the compaction equipment and the method determined by the test section, and generally should be controlled within 20~28cm...... ⑶ Before filling the improved soil, indoor test shall be carried out according to the ratio provided by the design to determine the construction mix ratio. The mix proportion of improved soil shall ensure that the unconfined compressive strength and compaction quality of the mixture can meet the design requirements. The type and technical conditions of admixture outside the improved soil shall meet the design requirements. The mixture shall not contain more than 10mm soil blocks, undigested lime particles and plain soil layers. The improved soil shall have uniform color and luster, and be free of ash strips and lumps. The allowable deviation of modifier dosage is - 0.5%~+1.0% of the test mix proportion. ⑷ The shrinkage cracks of the improved soil will cause damage to the drainage surface, which is easy to cause water intrusion into the subgrade. Strictly control the compaction moisture content, ensure the compaction degree, and pay attention to curing to control the shrinkage cracks of the improved soil itself. The optimal water content control scheme is to spray water evenly into the improved soil when mixing with the plant mixing equipment when the natural water content of the soil is close to the optimal water content; If the difference between the natural water content of the soil and the optimal water content is large, it is considered to irrigate and stew the soil in blocks in the borrow area
  • Project supervision contract management Instruction
    This document is a work instruction for project supervision contract management, word case, 6 pages in total. Contents: 1. Principles and contents of contract management 2. Management of project suspension and resumption 3. Management of project delay 4. Mediation of contract disputes 5. Treatment of breach of contract
  • Supervision of prestressed works Instruction (word)
    This document is a work instruction for prestressed engineering supervision, in word format, 14 pages in total. Contents: 1. General rules 2. Operation guide objects 3. Basis for prestressed engineering supervision 4. Operation manual for prestressed engineering supervision
  • Digging pile supervision of a project in Chongqing Instruction
    1、 Work in the preparatory stage of construction 1. The Project Supervision Department must review the following data before starting the construction of foundation works: Table 1: Construction Preparation Report of Foundation Works Table 2: Control Chart of Digging Pile Construction of Foundation Works Table 3: Statistics of Basic Quantities of Foundation Works Table 2 Construction Process Supervision • Progress Control Table IV: Construction Progress Control Plan of Foundation Works of Building 1 # V: Actual Construction Progress Control of Foundation Works of Building 1 # Quality Control Investment Control Table VI: Statistics of Completed Quantities of Foundation Works of Building 1 # Table VII: Monthly Completed Investment Statistics of Foundation Works III Appendix I: Quality Standards for Foundation Engineering Construction Page 14
  • Construction supervision of foundation works Instruction
    The professional supervision engineer shall conduct on-site inspection according to the application form for inspection of building energy-saving concealed works, self inspection results and necessary image data submitted by the contractor, and sign for confirmation if they meet the requirements.
  • Safety supervision of expressway project Instruction
    The expressway project safety supervision operation instruction, 37 pages in word format, explains the work content of safety supervision, reviews the safety construction scheme of special projects, and construction safety measures for reference.
  • Supervision of base station pile foundation and machine room civil works Instruction programme
    In this project, the laitance (the part of pile head concrete mixed with sediment after the completion of pile concrete pouring) shall be treated. After the height of bleeding is chiseled out, the exposed pile top concrete must reach the design strength value. Before the concrete pouring of the pile top cushion cap, the bottom of the cushion cap (the top of the pile) shall be filled with 50-100mm thick cement mortar with the same composition as the mortar in the concrete.
  • Civil engineering supervision of base station pile foundation Instruction planning scheme
    The bored pile casing for slurry wall protection in this project is generally made of 4-8mm steel plate, its inner diameter should be 100mm larger than the diameter of the drill bit, and its upper part should be provided with 1-2 slurry outlets.
  • Operation Instruction Manual for Supervising Engineer in the Construction Phase of Housing Construction Project
    1、 Necessary supervision data for each stage of construction (1) Data necessary for the commencement preparation stage (from winning the bid to the commencement of construction) 1. Prepare supervision plan 2. Formulate supervision implementation rules 3. Prepare side station plan 4. Review project construction organization design/scheme 5. Review materials and equipment for construction 6. Review of large machinery and equipment for construction 7. Review the sub divisional construction scheme of the first process 8. On site review of construction survey 9. Participate in the first regular site meeting organized by the Owner, and collect, sort out and issue meeting minutes 10. Participate in the joint review of drawings organized by the Owner, and understand the design intent and relevant questions in a timely manner 11. Collect construction contract supervision contract 12. Collect geological survey report 13. Collect the review of fire control opinions 14. Collect construction drawing review data 15. Collect the authorization statement of the construction unit and supervision unit 16. Copies of qualification certificates and work certificates of personnel of the site supervision department
  • Precast box girder supervision Instruction (word)
    This data is the supervision operation instruction for precast box girder, in word format, 22 pages in total, including main temporary works and prestressed concrete box girder prefabrication, for reference.
  • Supervision work Instruction Detailed rules for civil engineering supervision
    The allowable deviation value of each subdivisional work shall be included in 1.3 Introduction to Engineering Building/Structure/Water Supply and Drainage/Strong and Weak Current 1. The ground shall be compacted with plain soil, and the height of backfill shall be 50 mm higher than the outdoor elevation. Cast in situ floor slab. 2. Doors and windows: 3. Decoration: exterior decoration, interior painting, 1:3 cement mortar roughening in the toilet, and the surface course shall be provided by the user. 4. Roof: 5. Foundation structure; The foundation of the project is: C for cushion, C for foundation, C for constructional column and girder, MU solid bricks for bricks below the damp proof course, M5 cement mortar masonry, and MU porous clay bricks for bricks above the damp proof course. For the buried depth of foundation, the indoor floor elevation of the project ± 0.000 is equivalent to the absolute elevation m, and the indoor and outdoor elevation difference is m. 6. Main structure: 7. Water supply and drainage, electrical overview 7.1 UPVC water supply pipe is used for indoor water supply pipe, socket bonding, and galvanized steel pipe is used for outdoor connection with screw thread. 7.2 The indoor fire pipe shall be galvanized steel pipe with screw connection, and the outdoor fire pipe shall be cast iron pipe with asbestos cement interface. 7.3 Drainage pipes: UPVC drainage pipes are used indoors for wastewater and sewage pipes, and UPVC drainage pipes are used outdoors for rainwater pipes and sewage pipes. 7.4 Electrical engineering: the power supply is 380/220 V, the indoor wire tube is concealed, and the flame retardant rigid plastic tube is used. (The above contents should reflect the characteristics and technical content of the project as much as possible) 5 Detailed rules for the implementation of supervision of subdivisional and divisional works 5.1 Detailed rules for the implementation of supervision of foundation and foundation works 1 Temporary or permanent drainage ditches should be set up in the construction area before earthwork excavation, and roads for mechanical operation in the construction site should be built. Main trunk lines should be built in combination with permanent roads, The turning shall meet the safety requirements. 2 When mechanical excavation is used for foundation pit (groove) and pipe trench, a layer shall be reserved above the base elevation for manual cleaning in order not to damage the structure of the base soil. 3 The foundation shall not be exposed for a long time after excavation, and the foundation trench acceptance shall be organized in time for the construction of the next process. 4 The concrete shall be poured continuously, and construction joints shall not be left. If they must be left, they shall be left and treated according to the requirements of construction specifications. 5 The foundation surface shall be covered and watered for curing, and the foundation shall be prevented from soaking. 6 The quality inspection standard shall be in accordance with the Code for Acceptance of Construction Quality of Building Foundation Engineering. 5.2 Detailed Rules for the Supervision of Brickwork 68 pages
  • Supervision of a section of Northeast Railway Instruction High pier construction safety
    Any operation at a height 2m above the falling height datum plane that is likely to fall is called work at heights. However, when the height operation is more than 30m, it is a super level height operation.
  • Hebei Province Safety Supervision Implementation Rules Operation Instruction
    ⑷ Lifting 1. The lifting wire rope shall meet the safety factor for different purposes. The safety factor of the wire rope shall be determined according to the lifting method. When the wire rope is driven manually, the safety factor shall not be less than 4.5 times; Not less than 5~6 times when mechanically driven. 2. The number of safety turns of the wire rope on the winch drum shall not be less than 3, and the end of the rope shall be firmly fixed. It shall be able to withstand 1.25 times of the rated tension of the wire rope under the condition of retaining 2 turns. 3. The diameter of steel wire rope for wind rope shall be calculated, and the safety factor shall not be less than 3.5 times. Its passing and passing transmission lines shall meet the requirements. 4. The corrosion, wear and breakage of steel wire rope shall be inspected according to the Code of Practice for Acceptance and Scrapping of Steel Wire Ropes for Cranes (GB5972-86), and the steel wire rope shall be used with reduced standards or scrapped. 5. If the wire rope loses its normal state, such as wavy shape and flat arch, it should not be used as a lifting rope. 6. The pulley and wire rope shall be matched reasonably. The pulley groove shall be smooth and free from defects that damage the wire rope. 7. The ground anchor shall be set according to the specification and location specified in the construction scheme. If there are trenches, underground pipelines, etc., the anchor point shall be re selected. The ground anchor can be put into use only after passing the test. 8. If the component has no lifting nose and needs to be bound with steel wire rope, protective measures must be taken at the corners to prevent cutting the steel wire rope. 9. The snap ring shall be applied with force in the length direction, and the rope clamp pressure plate shall be at the side of the stressed rope. 10. The commander of hoisting must work with certificate
  • Safe operation of a supervision company in Beijing Instruction (Railway engineering)
    Contents Introduction Main work of safety supervision 5.1 Main work of safety supervision in construction preparation stage 5.1.1 Review the safety production license and enterprise qualification of the construction company; 5.1.2 Urge the construction company to establish and improve the safety production assurance system at the construction site, review whether the setting of the safety production management organization and the allocation of safety professionals meet the requirements, and whether the unit head, project head and safety professionals have passed the safety training assessment; 5.1.3 Review the qualification of professional subcontractors and labor subcontractors, and urge the construction unit to inspect the safety production system of each subcontractor; 5.1.4 Review the safety production responsibility system, safety production rules and regulations of the construction unit and safety production operation procedures of various types of work; 5.1.5 Review the work license and management of special operation personnel, and urge the construction unit to conduct safety production education, training and assessment for construction personnel Main work of safety supervision 5.1. Main work of safety supervision in the construction preparation stage 5.1.1 Review the safety production license and enterprise qualification of the construction unit; 5.1.2 Urge the construction company to establish and improve the safety production assurance system at the construction site, review whether the setting of the safety production management organization and the allocation of safety professionals meet the requirements, and whether the unit head, project head and safety professionals have passed the safety training assessment; 5.1.3 Review the qualification of professional subcontractors and labor subcontractors, and urge the construction unit to inspect the safety production system of each subcontractor; 5.1.4 Review the safety production responsibility system, safety production rules and regulations of the construction unit and safety production operation procedures of various types of work; 5.1.5 Review the work license and management of special operation personnel, and urge the construction unit to conduct safety production education, training and assessment for construction personnel; 6. Safety supervision work system, methods and procedures 6.1. Safety supervision work system 6.1.1 Safety regular meeting system The safety supervision engineer of the project supervision department presides over the meeting in the middle of each month, and the deputy safety manager in charge of each bid section, the safety engineer and the supervision team leader participate. The meeting comments on the safety work of the previous month, arranges the safety work of the next month and forms a summary for all parties to implement. 6.1.2 Regular safety inspection system The supervision team leader shall organize the supervisors of each supervision team to conduct a safety inspection on all projects under construction once a week
  • Safe operation of mobile formwork construction Instruction
    This document is a safe operation instruction for mobile formwork construction. It is clear and can be used for reference. Welcome to download it.
  • Field operation of large steel formwork project Instruction
    Detailed introduction to the construction process of large steel formwork, introduction to common problems, construction points, and a large number of pictures and on-site examples of the whole construction process
  • Supervision (XII) Inspection of project commencement conditions Instruction
    The supervision organization checks the commencement conditions in the engineering construction project in order to enable the continuous, balanced and orderly construction after the commencement of the project, and to enable the construction unit and the supervision unit to dynamically control the three major control objectives of project quality, progress and investment from the commencement of the project, which is conducive to the realization of the construction objectives.
  • Electrical supervision of a construction project Instruction
    1、 Preparation basis: 1 Engineering construction supervision planning 2 Unified standard for construction quality acceptance of building engineering GB50300-2001 3 Code for construction quality acceptance of building electrical engineering GB50303-2002 4 Code for construction and acceptance of grounding device in electrical device installation engineering GB50169-92 5 Standard for handover test of electrical equipment in electrical device installation engineering GB50150 6 Engineering electrical construction drawings
  • Underground engineering supervision Instruction programme
    The installation spacing of steel frame in this project is not more than 100mm; In the center of the plane vertical tunnel where the steel frame is located, there is no empty slag at the bottom of the steel frame foot, and the specification and quantity of the connecting rebar between the foot locking anchor bolt of the steel frame base and the welded steel frame meet the requirements of the design drawings; The space between the steel frame and the initial shotcrete shall be filled with concrete precast blocks every 2m, and the space between the steel frame and the initial shotcrete shall be filled with concrete.
  • Supervision of concrete mixing station Instruction engineering
    Before the construction unit of the project purchases raw materials by itself, it shall conduct field investigation and sampling inspection of the material factory, and notify the supervision site laboratory to send personnel to witness and review, and purchase after passing the inspection.
  • Preparation of supervision site plan Instruction engineering
    In the actual situation of the project, the "side station supervision plan" is prepared to clarify the scope, procedures and methods of side station supervision, and sent to the construction unit and the construction unit. The goal of the side station plan is clarified, and the preliminary communication with the construction unit is achieved. The first word is given, and it is detailed in the supervision implementation rules of various disciplines to specify the content, standards, methods and means of the project side station supervision.
  • Supervision site data management Instruction engineering
    The internal supervision directory (drawing directory template for reference) shall be established for the engineering drawings. During the construction process, the issuance of new drawings and design changes of drawings by the design unit or the construction unit shall be reflected in the directory in time, so that the supervision engineers of all disciplines on the site can master the latest version of drawings.
  • Tunnel engineering supervision Instruction programme
    In order to improve the work efficiency of the on-site supervisors and standardize their operation behavior, the Supervision Operation Instructions for the above 12 processes are specially compiled into a separate volume for easy carrying and reference.
Click to see more
All comments I want to comment
No comment