Organization of technical measures for foundation construction of a power plant
Contents Chapter I Project Overview 2 Chapter II Preparation Basis 2 Chapter III Construction Preparation 3 Chapter IV Main Construction Scheme 4 Chapter V Schedule 17 Chapter VI Manpower and Machinery Arrangement 17 Chapter VII Quality Requirements 18 Chapter VIII Safety Assurance Measures 19 Section 1 Safe Construction 19 Section 2 Civilized Construction 19 Section 3 Environmental Factor Identification and Evaluation 20 Project Overview 1.1 Daihai Power Plant 2 X600000kW unit is designed as two boilers. The foundation is a reinforced concrete structure, and the upper part is designed as a steel structure. The relative absolute elevation of positive and negative zero meters is 1227.00 meters. The buried depth of foundation is - 5.5 meters. The foundation form is independent foundation. Embedded bolts and shear support embedded parts are set on the upper part of the foundation. Concrete mixing pile is under the foundation. The pile head is 100mm higher than the foundation cushion. The minimum temperature in winter in Daihai area is minus 35 ℃, and the thickness of frozen soil layer is 1.6 meters. The groundwater level is -2.4m. The main quantities of this project are shown in the following table: the material grade of the foundation column reinforcement of the foundation cushion foundation of the structure part is C15 C30 C40, the quantity is 165.76m3, 2610.424 m3, 343.833 m3, 220T, which is prepared according to 1.2 Code for Construction and Acceptance of Foundation and Foundation Engineering GBJ202-83 2.2 Code for Acceptance of Construction Quality of Concrete Structures GB50204-2002 2.3 Technical Code for Geotechnical Engineering Investigation of Fossil Fuel Power Plant DL/T5074-97 2.4 Boiler foundation construction drawing 10-F122S-T02361.1 construction drawing 10-F122S-T0247 construction preparation 3.1 Reasonable selection and arrangement of construction team and determination of personnel number. 3.2 The power supply is led from the # 7 box type transformer on site, and the water source is temporarily led from the well point precipitation, and the construction machinery and materials are arranged. 3.3 Preparation of turnover tools, templates, scaffold tubes and their accessories. 3.4 Scheme consideration, joint review of drawings, reinforcement entrustment, etc. 3.5 The control piles shall be made and set at axis 1, 3, 5, 7 and 10 and columns A, 2/A, B, C, K2, K4 and K6 respectively. 3.6 Manufacturing and installation materials of external support: