This data is: outdoor drainage pipe network, outdoor drainage ditch and well pool data. This paper is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
Uploader:Upload time:2019-12-14 22:09:21Document format:docNumber of collections:zerothe number of pages:twoComments:zero
Application Form for Inspection of Positioning, Surveying and Setting out of Outdoor Drainage Works - Figure 1
Special statement: This material belongs to the sharing uploaded by usersDownloaded content, only for learning, not for commercial use. If there is any copyright problem, please timelycontactStation delete!
The drainage system of this project adopts the separation system of rainwater and sewage.Rainwater is discharged into the drainage channel of the campus, and domestic sewage is discharged into the campus sewage treatment station after being treated in the integrated biochemical septic tank, and then discharged into the campus drainage channel after simple treatment (in the near future). In the long term, it is discharged into the urban sewage pipeline system. The scale of the sewage treatment station is 2500-3000 cubic meters per day according to the municipal planning requirements
This document is an application form for inspection of an outdoor drainage ditch and well pool sub project. The contents are complete and can be downloaded
This data is: outdoor drainage pipe network, outdoor drainage ditch and well pool data. This paper is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
The municipal education park (phase I) project is a comprehensive vocational education park integrating teaching, office, business and hotel, which is developed by a municipal education investment company and invested by an investment and construction company.The project is located in Bishan Village, Maya Town, on the east side of the East Outer Ring Road of a city. The site is trapezoidal in shape and covers an area of 1007 mu. The original site is surrounded by hills, paddy fields and mountains.The project covers a large area, and there are many on-site transportation. The original paddy field surface dredging and mountain shrub surface clearing are heavy tasks, so many large-scale excavation and clearing machines must be organized for site leveling and transportation.To this end, the project department has specially set up a mechanical construction team to give unified command and work together to complete the site clearing and transportation work.
This document is the construction organization design scheme of an outdoor drainage project, which includes: preparation basis, project overview, construction preparation, system introduction, construction process, finished product protection, etc.The content is detailed and can be used for reference.
The rainwater pipeline of this project adopts plain ended reinforced concrete pipe, A-type foundation, 1:2 cement mortar joint, inspection well and grit chamber all adopt road A type (equipped with pig iron well ring cover), and the inlet well adopts road side entry type, with well depth of 1.0m.
The rainwater pipeline of this project adopts plain ended reinforced concrete pipe, A-type foundation, 1:2 cement mortar joint, inspection well and grit chamber all adopt road A type (equipped with pig iron well ring cover), and the inlet well adopts road side entry type, with well depth of 1.0m.
Outdoor parking lot in an urban area -- outdoor drainage engineering design includes outdoor domestic water supply pipeline and outdoor fire protection pipeline.2. Water supply pipeline design: the diameter of main water supply pipe within the design scope is DN200, and the other branch pipes are DN100
This document is an application form for inspection of an outdoor drainage ditch and well pool inspection lot. The contents are complete and can be downloaded
This data is: outdoor drainage pipe network, outdoor drainage ditch and well pool data. This paper is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
This data is: outdoor drainage pipe network, outdoor drainage ditch and well pool data. This paper is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
The project is located in Bishan Village, Maya Town, on the east side of the East Outer Ring Road of a city. The site is trapezoidal in shape and covers an area of 1007 mu. The original site is surrounded by hills, paddy fields and mountains.The project covers a large area, and there are a lot of on-site transportation. The original paddy field surface dredging and mountain shrub surface clearing are heavy tasks, so many large excavation and clearing machines must be organized for site leveling and transportation.
This project is the construction drawing design of the outdoor drainage project of a training base. The rainwater return period is 2 years, and the sewage pipeline is considered to reserve an inspection well for Phase II.
The drawings include: construction description, construction layout and elevation map.
The drainage system of this project adopts the separation system of rainwater and sewage.Rainwater is discharged into the drainage channel of the campus, and domestic sewage is discharged into the campus sewage treatment station after being treated in the integrated biochemical septic tank, and then discharged into the campus drainage channel after simple treatment (in the near future), and in the long term into the urban sewage pipeline system. The scale of the sewage treatment station is 2500-3000 cubic meters per day according to the municipal planning requirements.
The project is located in the east outer ring road of a city, with overlapping hills, vertical and horizontal paddy fields, mountains and rivers, developed underground water system, lush vegetation and the geomorphic features covering the entire construction site. The "three supplies and one leveling" has not been completed. At the same time, according to the characteristics of large quantities and tight construction period, after detailed study and discussion of design drawings and construction contracts,It is decided to control the construction of the project mainly from the following aspects
This data is the design and construction drawing of outdoor drainage engineering in an industrial park. The drawing includes: design description, general drainage drawing, detailed design of manhole, which is detailed and can be used for reference.
Organize construction in strict accordance with construction drawings, national specifications, drawing review minutes, design changes and other technical documents.
The drainage project of the campus is designed by Nanjing Architectural Design Institute, which is divided into north and south areas. The drainage system in the campus adopts the system of rain and sewage separation.The rainwater is mainly discharged into the landscape river in the campus, and a small part is discharged into the rainwater culvert pipe in the East Outer Ring Road.
The rainwater pipeline of this project adopts plain ended reinforced concrete pipe, A-type foundation, 1:2 cement mortar joint, inspection well and grit chamber all adopt road A type (equipped with pig iron well ring cover), and the inlet well adopts road side entry type, with well depth of 1.0m.
The key process of the main line of the project to control the construction period is as follows: construction preparation - cleaning, obstacle removal - temporary access road - trench excavation - well point dewatering - support maintenance - pipeline foundation - pipeline laying - trench backfilling - site clearing, and the ancillary facilities will be carried out according to the construction progress.
Construction Scheme for Outdoor Drainage Works of a Vocational Education Park Construction Scheme for Outdoor Drainage Works of a Vocational Education Park Construction Scheme for Outdoor Drainage Works of a Vocational Education Park Construction Scheme for Outdoor Drainage Works of a Vocational Education Park
This document is about the outdoor drainage pipe network system. This document is very valuable for reference and is hereby shared for everyone to learn. The contents are detailed and can be downloaded for reference.
This data is the application form for inspection of surveying and setting out of reference points, which is detailed and can be downloaded for reference.
Design and construction drawings of outdoor drainage works in a plant area, the design scope includes rainwater and sewage.The drawings include: rainwater plane and longitudinal section, sewage plane and longitudinal section, and design drawing of blind drain.
The outdoor drainage engineering design of the sanatorium reconstruction project has two parts, namely sewage pipeline and rainwater pipeline.Sewage pipeline: collect the sewage discharged from buildings 1 to 7 and underground garage in the community, and discharge it into the planned sewage treatment facilities after passing through the septic tank.The maximum daily sewage treatment capacity of the planned sewage treatment facility is 1000 m3/day, and the specific design is entrusted by Party A.The drawings include: description, bill of quantities, general layout, sewage plan, rainwater plan, manhole coordinate table and other drawings.The drawings are detailed and complete.It can be used by designers for reference..
Both sides of the Phase I project of this project are under construction. The site is narrow and there may be construction pipelines buried under the pavement. The construction difficulty of this section is how to complete the construction task and protect the finished products without affecting the normal construction of brother construction units.
This document is a CAD drawing for the design and construction of the outdoor drainage project of a local residence, including the drainage project plan and other data for reference.
The local road network along the project is developed, and the control base point of pipeline setting out is provided by the construction unit.Construction water connection point and construction power connection point will be solved by our own coordination with the local government.The construction site has met the construction conditions.
The rainwater pipeline of this project adopts plain ended reinforced concrete pipe, A-type foundation, 1:2 cement mortar joint, inspection well and grit chamber all adopt road A type (equipped with pig iron well ring cover), and the inlet well adopts road side entry type, with well depth of 1.0m.The sewage pipe adopts plain ended reinforced concrete pipe, B-type foundation, concrete ring joint, and the inspection well adopts road A type (equipped with pig iron well ring cover). The inside and outside of the well body are blocked with 1:2 cement mortar with a thickness of 2cm.
The project is located in Bishan Village, Maya Town, on the east side of the East Outer Ring Road of a city. The site is trapezoidal in shape and covers an area of 1007 mu. The original site is surrounded by hills, paddy fields and mountains.
This document is the application form for inspection of the subdivisional works of outdoor drainage pipeline installation in a community. The contents are complete and can be downloaded