Chongqing City Supervision disclosure of a sewage pipe network project
2. Control of the construction process (1). Implement dynamic management, carry out on-site quality, safety and civilized construction inspection at any time, and achieve "three timeliness", that is, timely identify problems, timely propose problems, and timely rectify. (2) Site supervision shall be carried out for important subdivisional works and difficult parts to prevent construction not in accordance with construction procedures, construction acceptance specifications and construction drawings. (3) After the completion of the concealed works constructed by the construction unit, the data must be filled in according to the facts, and submitted to the supervisor for inspection on the basis of self inspection. Otherwise, the supervisor will not accept it, and the next process can be carried out after the supervisor and the owner sign the acceptance, and the concealed procedures shall be handled. (4) Check the construction technical data and construction records of the construction unit at any time,...... (II). Quality pre control points at the construction stage: (1). Check the surveying and setting out, construction survey point data, construction axis and elevation. (2) Examine and approve the construction organization design, construction scheme, new process and new technical data. (3) Factory certificate, retest report, supervision spot check and retest, rebar welding and mechanical connection spot check and retest of rebar raw materials. (4) Specification and quantity of reinforcement and main reinforcement of reinforced concrete beam; Beam support, column beam intersection, beam beam intersection, reinforcement and welding; Specification, quantity and position of embedded pipes, fittings, holes and negative bending reinforcement. (5) . Binding of reinforced concrete slab reinforcement, support height, reinforcement specification, reserved hole reinforcement, negative bending moment reinforcement, anchorage length and overlapping length of column, wall, beam and slab reinforcement, etc 4、 The construction unit's approval system (I), the construction organization design and construction scheme prepared by the construction unit shall be stamped with the official seal of the unit after the self review is qualified, the functional personnel sign completely and put forward opinions. Fill in and submit it to the supervision unit for approval according to the requirements of Table A-2. (2) Various progress plans prepared by the construction unit shall be reviewed, signed and sealed by the leader of the competent department, and then filled in and submitted to the supervision unit for review according to the requirements of A-4 form. (3) The project commencement report shall be filled in according to the requirements of Table A-1. (4) The results of construction survey and setting out shall be reported to the Supervisor. (5) The materials, components, fittings and equipment entering the site of the project shall be reported to the supervisor according to Form A-9. (6) The project inspection application shall be reported to the supervisor according to the contents of A-4 form. (7) . Due to the quality, safety, civilized construction and other problems of the project, the supervisor issued a suspension order to the construction party or other reasons caused the suspension, which has been rectified by the construction party or the suspension factors have been eliminated, the construction company requires to resume construction, and fill in the form A-1 to request resumption of work 5、 In the form (I) of the supervisor's notice and reply to the construction company, if there are quality and safety problems and uncivilized construction and other bad behaviors during the construction, the supervisor sends the "supervision notice" in Form B-1 to the construction company for rectification, and the construction company shall rectify in time, and report the rectification situation to the supervisor for re inspection within three days. (2) When the supervisor finds that the raw materials are unqualified, the quality problems, the conclusions of the construction test report fail to meet the design requirements, and the specification requirements, the form B-1 shall be sent to the construction company for rectification. (3) After the construction of subdivisional and divisional works, the construction unit shall pass the self inspection and report to the supervisor for acceptance. The supervisor shall reply to the construction unit with Form B-1. (4) After various progress plans prepared by the construction unit are submitted to the supervisor for review, the supervisor will reply to the construction unit with Form B-1 About 10000 words, compiled in April 2009