Engineering supervision planning of a comprehensive service building
1. Construction unit: 2. Project name: Wu Building 3. Survey and design unit: Design Co., Ltd. 4. Construction site: intersection 5. Project scale and composition: building area 8909 m2. The building height is 20.8 m. The building has five floors with pitched roof. 6. Introduction to engineering buildings/structures/water supply and drainage/strong and weak current: the project is a brick concrete structure with reinforced concrete strip foundation. Walls below ± 0.00 are solid clay bricks, and walls above ± 0.00 are porous clay bricks. The external window is made of plastic steel, and the single frame hollow glass is used. The internal door is a finished molded door with internal insulation. The external wall is insulated from the external wall. The external wall is made of face bricks, and the internal wall is made of porcelain paste. The waterproof project is that the flat roof is made of high polymer modified asphalt coiled material, and the toilet waterproof is made of polyethylene composite double-sided coiled material. Water, electricity, heating, telephone and cable TV are fully equipped. Two Hitachi elevators. 7. Project characteristics: This project is an energy-saving building, which is divided into seven sub projects. The building structure is not complex, but the functions are complete, and the external wall insulation process is complex. Therefore, full attention must be paid in advance during supervision. 8. Date of commencement and completion: June 2008 to May 2009.