This document is the technical disclosure of construction safety in spring, including: disclosure content: when spring comes, everything will recover, which is the golden season of construction and production;However, spring is also a period of frequent fire and other safety accidents. This disclosure is specially prepared to prevent fire, casualty accidents and other potential safety accidents.1. Since it is relatively warm in spring, it is easy to cause fatigue (dozing). Construction workers should always wear personal safety protection equipment (such as safety helmets, safety belts, etc.). It is strictly prohibited to remove safety nets, "four entrances", "five edges" and other safety protection facilities without authorization.Therefore, the construction team is required not to force workers to work overtime, and it is prohibited to extend working hours at will.The on-site foreman shall often go deep into each working face to check whether there is any violation, and stop it once found.Fire prevention, object strike prevention, fall prevention and other safety protection measures shall be taken for special construction parts.When the foreman arranges the work, a person in charge must be appointed for the construction of more than two persons. The foreman of the construction team constantly carries out patrol inspection. Once paralyzed, the consequences are unimaginable.
Spring construction safety technical disclosure - Figure 1
Special statement: This material belongs to the sharing uploaded by usersDownloaded content, only for learning, not for commercial use. If there is any copyright problem, please timelycontactStation delete!
This document is the technical disclosure of safety production in decoration construction. The document includes: technical disclosure of enclosure safety in decoration construction site, technical disclosure of safety management in inflammable and explosive places in decoration construction site, technical disclosure of safety in temporary electricity use in decoration construction site, technical disclosure of safety in erection of climbing platform in decoration construction siteSafety technical disclosure of self-made climbing appliances on the construction site of decoration works, safety technical disclosure of distribution box use on the construction site of decoration works, safety technical disclosure of electricity use in temporary dormitory of decoration works, safety technical disclosure of basket construction of decoration works, safety technical disclosure of residential decoration construction, safety technical disclosure of electricity use on the construction site of residential decoration worksCivilized construction of residential decoration and technical disclosure of on-site environment, technical disclosure of fire safety of residential decoration construction site, technical disclosure of electrical fire safety of residential decoration, technical disclosure of protection safety of fire-fighting facilities of residential decoration, technical disclosure of safety of indoor environmental pollution control of residential decoration.
1、 When temporary power supply is pulled, the wires shall be overhead or buried. When crossing the road, steel pipes or other corridor protection measures shall be taken, and the wires shall not be dragged or pulled randomly. The wires shall not be rolled by vehicles.2、 The electrical equipment in the electrical box shall be complete and free of defects, with a special leakage protection switch, and the temporary power wiring shall be carried out in strict accordance with the requirements of the three-phase five wire system.One leakage switch shall be used to control one socket.
Contents of disclosure: (1) Prepare dry powder fire extinguishers and other fire-fighting equipment when boiling hot asphalt, and take rainproof measures.(2) Diluents such as xylene, gasoline and rosin should be poured into the adhesive slowly and stirred in time.’(3) When anti-corrosion at height, the paint bucket must be tied to a solid object. The asphalt bucket should not be too full. Check whether the bucket and spoon containing asphalt are placed safely. When painting, the lower part should be covered with wood plates, and other pipes, equipment or ground should not be polluted.(4) When working at heights, the safety requirements for erecting scaffolds, scaffold platforms and single leaf attacking double leaf ladders must be observed to prevent falling from injuring people.(5) Heat insulation construction personnel must protect goggles and film gloves. If no one's ears are contaminated with various materials and fibers during construction, they can take measures to flush hot water bath.(7) When painting, the roller and brush should not be too much stained with paint to prevent it from being spilled on the ground or equipment.(8) Fire prevention shall be provided at the operation site. Smoking and the use of electric furnace are strictly prohibited. Ventilation shall be strengthened for the well.+(9) After construction.The remaining anti-corrosion materials shall be sealed in containers and returned to the designated warehouse.(10) Operators shall change their work clothes and take a shower after work.
Contents of disclosure: (1) Construction personnel shall wear work clothes, work shoes and gloves.If the skin is stained with paint during operation, it should be wiped with cotton yarn stained with corresponding solvent in time, and then washed with soap and water.(2) The coated waterproof layer shall have a flat surface and be evenly coated. There shall be no quality defects such as flowing, wrinkling, bubbling, exposed matrix reinforcement materials and edge warping. If problems are found, they shall be repaired.(3) Protective railings or protective scaffolding shall be provided as required where there is no parapet around the roof.(4) When pouring concrete, the concrete shall not be stacked together.. (5) Cement, sand, stone, concrete and other materials shall not be spilled everywhere during transportation. Scattered materials shall be cleaned in time to keep the site clean.(6) The solvent based waterproof coating is flammable and toxic, and should be stored in a cool, ventilated place without direct exposure to strong sunlight.The warehouse without fire source shall be equipped with fire-fighting equipment.(7) When solvent based waterproof coating is used, no smoke or fire is allowed around the construction site. Fire fighting equipment shall be provided.(8) The concrete can only be used after being inspected and confirmed as qualified by the electrician before use.The switch box must be equipped with a leakage protector, and the plug should be intact. The power cord should not be broken and leak electricity. The operator must wear insulating shoes (rubber shoes).Wear insulating gloves.
C30 concrete is used for foundation, C35 fine aggregate concrete is used for secondary grouting, C15 concrete is used for foundation cushion, and the thickness of foundation protective layer is 50mm.
In order to strengthen the pre control and advance control, the construction unit shall conduct safety and technical disclosure to the construction personnel for the 10kV line project in Shikeng Village, Tiechang Town.Through safety and technical disclosure, the construction personnel will have a clear understanding of safety management in the future construction, so that all construction personnel can understand the relevant provisions in the safety work procedures, and clarify the importance of safety responsibilities.Technology is the key to ensure quality. Strictly following the approved construction scheme is the prerequisite to ensure construction quality.Only by doing a good job in technical disclosure and improving the understanding level of construction personnel on technical disclosure can we ensure that the construction will be carried out in strict accordance with the construction scheme in the future construction and lay a solid foundation for the safe, timely, quality and quantity completion of the 10kV line project in Shikeng Village, Tiechang Town.
Formwork and reinforcement installation shall be carried out in coordination. Formwork that hinders reinforcement binding shall be installed after reinforcement installation.The formwork shall not be connected with the scaffold (except for the overall design of formwork and scaffold) to avoid deformation of the formwork.
After the hole is formed, the concrete well ring retaining wall shall be carried out as required. The first section of retaining wall shall be 150mm - 200mm higher than the floor. The thickness of retaining wall and the concrete strength elevation of retaining wall shall be constructed according to the design.The center of the retaining wall shall coincide with the center of the pile position, and the deviation shall not exceed 20mm. The deviation of the orthogonal diameter in any direction shall not exceed 50mm, and the deviation of the perpendicularity of the pile hole shall not exceed 0.5%.
Protective sheds must be set at the top of the lower working layer and the top of the temporary passage during up and down cross operations. The length and width of the protective sheds should be determined according to the height of the objects that may fall above the lower working surface: when the upper height is 2m~5m, it should not be less than 3m; when the upper height is 5m~15m, it should not be less than 4m; when the upper height is 15m~30m, it should not be less than 5m; when the upper height is more than 30mShall not be less than 6m; the protective shed shall be solid, and its structure shall be determined by the construction design, and can bear the wind load.When wood is used, its thickness shall not be less than 5cm; the protective shed shall be firmly and tightly erected.
The operation platform must be erected for work at heights, and the erection and dismantling of scaffolds shall meet the specific requirements of scaffold safety technical disclosure;The scaffold board of the operation platform must be paved fully and stably;Before use, it shall be inspected, accepted, confirmed as qualified and documented. During use, it shall be inspected at any time to confirm safety.
The movable steel (wood) scaffold used for indoor plastering or the support erected with steel pipes, bamboo and wood shall be stable, firm and reliable, and the scaffold board span shall not be more than 2m. The materials stacked on the scaffold shall not be too concentrated, and the number of operators in the same span shall not exceed two.
The indoor and outdoor transportation roads should be flat. When stone materials are transported on trolleys, they should be padded with soft materials, and people should support them on both sides to avoid damage to the flower shed and foot smashing.Block drilling and cutting shall be carried out on the fixed base frame by professional post trained personnel, and protective glasses shall be worn during operation.
Bottom plastering: first scrape a thin layer of plastering, then file and level it layer by layer, then scrape it vertically and horizontally with a big bar, and rub it with a wooden trowel.Then comprehensively check whether the bottom is flat, and check the perpendicularity of the wall with the line board. After plastering, the scattered mortar should be cleaned and recycled in time.
1. The construction site shall be isolated and enclosed with foam enclosure, and fully enclosed construction shall be carried out. Safety eye-catching signs such as warning red lights and reflective strips shall be set to remind passing vehicles and pedestrians to pay attention to safety.Avoid accidental collision with the construction site to hurt the construction personnel and cause safety accidents.Relevant slogans and warning signs shall be posted according to the requirements of civilized construction.2. The baskets or buckets, pulleys and hooks used for lifting soil and stones shall be intact and firm, and the baskets and buckets used for transporting soil and stones shall not be too full to prevent soil and stones from falling down and hurting people due to being too full. When lifting large stones, the underground operators must leave the working face before lifting.Underground pipe jacking operators must wear safety helmets, and it is strictly prohibited to operate without safety helmets.The lifted soil and stones shall be removed in time. The soil and stones that cannot be removed in time shall be stacked 1 m away from the edge of the wellhead, and the height shall not exceed 1.2 m.Prevent the soil and stones from rolling down into the well to hurt people. When the amount of soil and stones lifted is enough for one truck, they should be transported away by vehicles in time.The residual mud of the day shall be transported as far as possible to avoid environmental pollution.The downhole operators shall be rotated.Each operator shall not work in the pipe for more than 1 hour to avoid danger caused by excessive labor intensity.In the process of jacking, the construction personnel must use the safety belt, the portal must be taken care of by the construction personnel, and the interior of the tunnel must be illuminated with lights no more than 12 volts. Each shift must have a qualified electrician on duty.Use the water pump to pump water in the water collecting well set up in the working well to keep the well free of water. When pumping water, the construction workers shall not stand within the range of water.When the winch is used for vertical traction, no one can stand in the shaft, and the operators of the platform on the working shaft must use safety belts.The self-made wooden trolley is used to place the compressed air respirator and carry the people entering the pipe, and a rope is tied at the rear of the cart. In case of an accident, the outside supervisor will quickly pull the people in the pipe out of the pipe for rescue.
The dry spraying operation shall be adopted for the sprayer, which shall be proportioned according to the mix proportion specified in the factory instructions. The air source shall be the required voltage stabilizing source, and the power supply, water source, feeding equipment, etc. shall be matched.
Site requirements: according to the general layout of the construction site, determine the formwork stacking area, accessories stacking area and formwork turnover land;2. The stacking site shall be flat, solid and smooth in drainage. The site shall be made of 2:8 lime soil with a thickness of 15cm: paved with a layer of stones for compaction. The slope of 2% shall be made towards the drainage ditch. Drainage ditches shall be dug around the stacking area;
1. Safety ladders or earth ramps shall be set up when climbing high ridges and slopes on site.2. The safe route shall be selected for field survey to avoid dangerous areas such as rivers, lakes, marshes, cliffs, etc. and keep safe.3. When working near the edge at heights, the operators must stand safely.4. Before the pile is measured, the underground pipeline shall be determined to be in a safe condition during the pile driving process before operation.5. The construction machinery must be kept away from the site operation.When it is necessary to work near the construction machinery, the construction machinery shall be suspended,
During the slip form construction, the scattered stacking shall be strictly in accordance with the requirements of the construction organization design. The platform shall not be overloaded and uneven stacking shall not occur.
This document is the technical disclosure of civil engineering construction safety in winter, including: content summary: 1. Construction personnel must receive three-level safety education and training before entering the site, and can work only after passing the examination. They must obey labor discipline and obey the command of leaders and safety inspectors.Concentrate on your work and stick to your post.Without permission, it is not allowed to engage in operations other than this type of work;It is strictly prohibited to work after drinking and to smoke on the construction site.2. Properly wear personal protective equipment according to operation requirements.Personal protective equipment, safety helmet and chin belt must be worn when entering the construction site;Safety belts must be fastened when working at heights without protective facilities, at the edges of roof holes and shafts. Shoes with hard soles and nails that are easy to slip are not allowed to wear when working at heights. Materials are not allowed to be thrown down. Barefoot or slippers with high heels are not allowed to enter the site.3. During the construction, it is strictly prohibited to wander around, fight and make troubles and other illegal activities. In case of conflict with other disciplines during the construction, the Project Department shall be timely consulted to solve the problem.4. When working at heights, fasten the safety belt without safety protection. The safety belt shall be fastened at the position with firm structure, hanging high and using low.5. Pay special attention to the safety of electricity use. Check the electrical equipment, electric tools and their lines before work every day. If problems are found, find an electrician to repair them in time. Electricians are strictly forbidden to repair and repair equipment with electricity.
This document is the technical disclosure for the construction safety of exterior wall stone like paint, including: content introduction: this paper introduces the technical disclosure for the construction safety of exterior wall stone like paint in detail.
This document is the safety technical disclosure of the construction elevator driver, including: data overview: mechanical injury and mechanical accident caused by improper operation of the construction elevator, illegal operation, landing door status, falling from height and mechanical injury caused by the elevator cage leaving the landing door not closed.
In sites with abundant groundwater, steel sheet pile cofferdams, underground diaphragm walls and other supporting structures with good waterproofing should be preferred.