No. Project content Remark 1 Project name 2 Construction site 3 Project scale 4 Construction unit 5 Design unit 6 General contractor 7 Supervision unit 8 Quality goal cooperation general contracting project won the Hubei Provincial Construction Quality Project Team Award (Chutian Cup) 9. Safety and Civilization Objectives Cooperate with the EPC project to obtain the title of "Safe and Civilized Construction Site Meeting the Standard" of Hubei Construction Engineering 10. Planned Commencement Date: August 20, 2014 Planned Completion Date: February 20, 2015 Remarks: The actual commencement date is subject to the commencement report approved by the supervisor 2.2 Overview of main construction scope No. Regional decoration engineering Electrical engineering Water supply and drainage engineering Other related work of fire engineering 1 Interior wall, floor and ceiling decoration; Waterproofing of balcony, toilet, ceramsite concrete backfilling of toilet, pea stone concrete backfilling of floor heating (with closing), partition and plugging; Hardware installation; Termite control and other sporadic decoration works. All works from the outgoing line of the indoor distribution box to the end lamps (excluding artistic chandeliers), switch sockets, wires and embedded pipelines in the masonry. All water supply works (including indoor hot water system pipes) 50cm behind the indoor interior wall, installation of all indoor sanitary wares, bathroom hardware and faucets, and all work quantities of indoor drainage pipes from the horizontal pipe to the water consumption point (including the ventilation pipe after the three-way connection of the riser into the house within the scope of this project) (The pre contracting scope of the indoor horizontal pipes for the general contractor and balcony drainage is that the indoor toilets and kitchens are reserved 50cm beyond the inside of the wall). Cooperate with the closing. Repair, block and close all window sills, gas pipeline reserved holes, holes, grooves, reserved holes, etc. in the fine decoration work area. 2 Wall, ground and ceiling decoration of entrance lobby on the first floor; Partition, block and fix furniture; Hardware installation, elevator hall door pocket; Termite control and other sporadic decoration works. All works from the rear of the distribution box to the end lamps (excluding artistic chandeliers), switches and sockets, wires and embedded pipelines; The emergency lighting circuit is not included, but the end positioning and cooperation closure of emergency lighting are included/ Cooperate with the closing, and make, install and close the fire hydrant box door. Repair, block and close all window sills, gas pipeline reserved holes, holes, grooves, reserved holes, etc. in the fine decoration work area