Construction scheme and technology of fire engineering measures
The scope of work mainly includes: 1. Indoor works of automatic fire alarm and linkage control system: fire wiring in the system (including embedded pipes and junction boxes), fire hydrant buttons on each floor, audible and visual alarms, manual alarm buttons, modules, bus isolators, temperature detectors, smoke detectors, alarm host (including linkage panel, linkage power supply, multi wire panel, etc.) Fire terminal box, regional alarm and other equipment, installation and commissioning. 2. Indoor works of fire hydrant system: all indoor fire hydrant system pipes, fire boxes (including built-in accessories), valves, pump sets, control cabinets, installation and commissioning work, and the fire hydrant system of shops. 3. Automatic sprinkler system: indoor works: all indoor pipes, nozzles, valves, pump sets, control cabinets, installation and commissioning. 4. Ventilation, smoke control and exhaust system: procurement, installation and commissioning of exhaust fan, forced draft fan, air duct, air outlet and air valve in the system. 5. Elevator three-way communication system: two fire telephones (including pipes and junction boxes), telephone lines, panels and telephones are set from the fire control room to the elevator machine room in the system within the scope of this project. 6. Be responsible for the commissioning and acceptance of fire power distribution, etc.: 6.1. Purchase and installation of fire power distribution from the outgoing line of fire power distribution box to the piping and threading at the end of fire power equipment (including fire power box); Installation and wiring of control cabinet for large equipment such as fire pump; 6.2 The installation, commissioning and acceptance of evacuation indication and emergency lighting system equipment starts from the outgoing line of the emergency lighting distribution box to each lamp, including pipe embedding, threading, and lamp installation, excluding the emergency lighting distribution box. 7. Procurement and installation of other fire-fighting facilities set for fire fighting or with fire fighting functions in each building, such as fire doors, fire rolling shutters, fire extinguishers, fire lamps, etc; 8. Before the acceptance of the fire protection system or as required by the general contractor, the fire protection construction unit shall be responsible for blocking the reserved holes of the fire protection system and installing the panel of the junction box. 9. Outdoor fire pipe network (including outdoor fire hydrant) project. 10. Be responsible for organizing fire control construction application and fire control acceptance and training, and ensure that fire control construction application and fire control acceptance are accepted and delivered for use within the time limit specified by the Employer.