This data is the technical disclosure of the safety of electricity used by ramming machines, including: 1. Tamping machines must be equipped with splash proof leakage protectors.The rated leakage action current shall not be greater than 15mA, and the rated leakage action time shall be less than 0.1s. 2. The load line of the ramming machine shall be a weather resistant rubber sheathed copper core flexible cable.3. When using the ramming machine, you must wear insulation articles as required, and there should be special personnel to adjust the cable.The length of the cable shall not be more than 50m. It is strictly prohibited to wind, twist and cross by rammed earth machinery.When multiple tamping machines are working in parallel, their spacing shall not be less than Sm; when working in tandem, it shall not be less than 10m. 4. The operating handrails of tamping machines must be insulated.Etc.
Technical disclosure of power safety of ramming machinery - Figure 1
Special statement: This material belongs to the sharing uploaded by usersDownloaded content, only for learning, not for commercial use. If there is any copyright problem, please timelycontactStation delete!
In this project, proper straightening blocks, traction sheave grooves and transmission speeds shall be selected according to the diameter of straightening reinforcement.The diameter of the straightening block shall be 2-5mm larger than the diameter of the steel bar. The groove width of the traction wheel shall be consistent with the diameter of the required straightening steel bar. The transmission speed shall be selected according to the diameter of the steel bar. The slow speed should be selected for the large diameter. The material can be fed only after the commissioning is qualified.
The reinforcement construction site shall meet the operation needs, and the installation of mechanical equipment shall be firm and stable. The mechanical equipment shall be checked before operation, and the lighting lamps must be equipped with mesh covers.
This document is the technical disclosure of safe use of electricity at the construction site. The document includes: electricians must pass the assessment according to the current national standard Management Rules for Safety and Technical Assessment of Special Operation Personnel before taking up their posts with certificatesThis regulation indicates that the identity of electricians must be true and must match the basic professional quality and skills;The installation, patrol inspection, maintenance or removal of temporary electrical equipment and lines must be completed by electricians and supervised by personnel.The electrician level shall adapt to the difficulty and technical complexity of the project.
Before starting the machine, carefully check whether the control switch equipment in the switch box is complete and effective, and whether the leakage protector is reliable. If any problem is found, report it to the foreman in time, and the foreman will send an electrician to solve it.Before starting the machine, carefully check whether the terminal of the neutral protection line of the electrical equipment is loose. It is strictly prohibited to touch all live insulated wires with bare hands.Strictly implement the regulations for safe use of electricity. All work related to electrical maintenance and installation must be operated by electricians. Non electricians are strictly prohibited from performing electrical work.
Operators shall strictly implement the safety operation regulations of electricians, regularly inspect and test electrical equipment and tools, and stop using unqualified electrical equipment and tools.
Before starting the machine, carefully check whether the control switch equipment in the switch box is complete and effective, and whether the leakage protector is reliable. If any problem is found, report it to the foreman in time, and the foreman will send an electrician to solve it.
This document is the technical disclosure of electrical safety for professionals, including: 1. Installation, maintenance or removal of temporary electrical works must be completed by electricians.The electrician level shall adapt to the difficulty and technical complexity of the project.2. All kinds of electricity users shall: 1) master the basic knowledge of safe electricity use and the performance of the equipment used;2) Before using the equipment, wear and equip corresponding labor protection articles as required;Check whether the electrical devices and protection facilities are in good condition.It is forbidden to operate the equipment with "disease";3) Switch off the disabled equipment and lock the switch box;Etc.
1. Before working, the reinforcement machinery shall check whether the clamp head is firm and whether the ground anchor is firm to prevent rebound during work. Pedestrians are not allowed within 2m when straightening the reinforcement.2. The grinding wheel cutter shall be supported by a specially assigned person when cutting the reinforcement, and the operation shall be consistent, and it shall not be dragged anywhere.3. Mechanical equipment shall not be operated with fault, overload operation and maintenance during operation.4. All kinds of mechanical equipment and protective articles should be checked frequently, reported in time and maintained in time.5. When the work is finished or the power is cut off for more than one hour, the switch box shall be cut off and locked to protect the power supply and tools.6. All professionals who use or operate machinery must understand its performance and correctly master the operation method.7. The operators of mechanical equipment must be certified, healthy, mentally normal and have a strong sense of responsibility.
This document is the safety technical disclosure for the demolition of external elevators. The document includes: key inspection before operation: cables and ground wires should be intact, structures should be deformed, connecting bolts should be loose, nodes should be welded off, assembly should be correct, attached walls should be firm, platforms should be flat, steel wires should be damaged, and the matching gaps and supports of gears, guide wheels, rollers should be qualified,If there is any obstacle in the operating range, it can be started only after problems are found and properly handled.
1. Temporary power use must be prepared in accordance with the "Technical Code for Safety of Temporary Power Use on Construction Site" JGJ46-88 ". The construction organization design of power use must formulate technical measures for safe power use and electrical fire prevention measures.2. The temporary power engineering drawings must be prepared by the electrical engineering technicians separately and used as the basis for temporary construction after being approved by the technical director.3. Contents and steps of construction organization design for temporary power supply: ⑴ Site survey, determine the position and route of the main distribution box (cabinet) and distribution box for incoming power supply.⑵ Conduct load calculation, and select the conductor section and the type and specification of electrical appliances.⑶ Draw electrical plan, elevation and wiring system diagram.(4) Develop technical measures for safe use of electricity and electrical fire prevention measures.
Before starting the machine, carefully check whether the control switch equipment in the switch box is complete and effective, and whether the leakage protector is reliable. If any problem is found, report it to the foreman in time, and the foreman will send an electrician to solve it.Before starting the machine, carefully check whether the terminal of the neutral protection line of the electrical equipment is loose. It is strictly prohibited to touch all live insulated wires with bare hands.Strictly implement the regulations for safe use of electricity. All work related to electrical maintenance and installation must be operated by electricians. Non electricians are strictly prohibited from performing electrical work.The operators of electrician safety technical disclosure shall strictly implement the electrician safety operation procedures, regularly inspect and test the electrical equipment and tools, and stop using any unqualified electrical equipment and tools.Electricians are strictly prohibited from live operation, wiring with load is prohibited on the line, and electrical appliances are used correctly.The metal shell of electrical equipment must be grounded or connected to neutral for protection, and leakage protectors must be installed in the main box and switch box for two-level leakage protection.