Records of safety technical disclosure of formwork works
Wear safety helmet before work, check whether the tools used are firm, and the wrench and other tools must be tied to the body with a rope chain to prevent falling and hurting people. Concentrate on work to avoid nails sticking and falling in the air. For the installation and removal of formwork more than 5 meters, scaffolding and protective railings shall be set up. It is forbidden to operate up and down on the same vertical plane. Wear safety belt when working at heights. A large number of formwork and other materials shall not be piled on the scaffold. Practical safety measures shall be taken in advance for the installation and removal of high and complex structural formwork. When removing formwork at heights, special personnel shall be assigned to command and mark the working area below. When assembling and disassembling the combined steel formwork, there should be someone to meet it up and down, and it should be transported along with the assembling and disassembling. It is strictly prohibited to throw it down from a high place. Braces, draw bars, etc. shall not be erected on the door and window frames and scaffolds. The diagonal braces and pull rods in the middle of the passage shall be placed at more than 1.8 meters. In the process of formwork erection, if it is necessary to stop halfway, the supports, buttresses, column head plates, etc. shall be nailed firmly; When the formwork is removed intermittently, the removed formwork, lead bars, supports, etc. shall be transported away or properly stacked. The long crowbar is generally used to remove the formwork. The whole formwork shall be prevented from falling down to avoid personal injury. There are reserved holes on the formwork, which shall be covered after installation. In the reserved holes on the concrete slab, the holes shall be covered immediately after the formwork is removed.