Process flow: formwork cleaning → raft formwork installation → screw installation → horizontal and vertical back ridge reinforcement → flatness, acceptance of guide wall formwork Process flow: welding and fixing reinforcement → formwork installation → screw installation → horizontal and vertical back ridge reinforcement → flatness, acceptance of concrete raft formwork using wood glued formwork. The formwork adopts 1220 × 2440 × 15mm plywood, and the secondary keel adopts 50 * 100 main ridge and two 1.5m steel pipes. M14 embedded tie bolts shall be used with the bolt spacing of 900mm. The embedded bolts shall not contact with the raft reinforcement. Foundation guide wall: 915 × 1830 × 15mm plywood is used as the formwork, 50 × 100mm batten is used as the secondary keel, and 25 diameter rebar is used as the fixed rebar for the formwork. The fixed rebar is welded with the raft horse stool rebar with a spacing of 600mm. The outer formwork of the guide wall is reinforced by steel pipes and three-stage M14 water stop bolts, and the inner wall formwork is reinforced by steel pipes and M14 threaded screws, with PVC sleeves set outside the screws. The height of the civil air defense guide wall is 500 mm. During the construction of the civil air defense guide wall formwork, attention should be paid to the placement of embedded parts. The through wall bolts of the civil air defense interior wall are not provided with PVC sleeves, and other guide walls are 300mm except the civil air defense wall. The guide wall is only set at the exterior wall of the foundation. The interior wall is not set.

 Technical disclosure of main building formwork construction - Figure 1

Technical disclosure of main building formwork construction - Figure 1

 Technical disclosure of main building formwork construction - Figure 2

Technical disclosure of main building formwork construction - Figure 2

 Technical disclosure of main building formwork construction - Figure 3

Technical disclosure of main building formwork construction - Figure 3

 Technical disclosure of main building formwork construction - Figure 4

Technical disclosure of main building formwork construction - Figure 4

 Technical disclosure of main building formwork construction - Figure 5

Technical disclosure of main building formwork construction - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment