Uploaded on: 2019-10-14 20:40:52 come from: electrical engineering / Electrical construction design / Construction disclosure
zero
4 points

The project is a reinforced concrete frame shear wall structure, with 3, 4 and 6 floors above the ground and 2 floors underground for partial podiums. The main building has 2 floors underground and 24 floors above the ground. The floor height is 4.2m for the second floor underground, 6.0m for the first floor underground, 4.5m for the first to fourth floors, and 4.05m for the fifth to 24th floors, including the first floor of the high-rise main building and the roof of the basement (pure basement part); Conference hall of podium building; Meeting room on the third floor; Press release hall on the fourth floor; Office entrance hall. The beam and slab formworks at the above five positions are all in the construction category of tall formworks. The construction volume of tall formworks is large, the construction technology and quality requirements are high, and safety and quality are the top priorities.

 Technical disclosure for mass concrete construction of bottom slab - Figure 1

Technical disclosure for mass concrete construction of bottom slab - Figure 1

 Technical disclosure for mass concrete construction of baseplate - Figure 2

Technical disclosure for mass concrete construction of baseplate - Figure 2

 Technical disclosure for mass concrete construction of baseplate - Figure 3

Technical disclosure for mass concrete construction of baseplate - Figure 3

 Technical disclosure for mass concrete construction of baseplate - Figure 4

Technical disclosure for mass concrete construction of baseplate - Figure 4

 Technical disclosure for mass concrete construction of baseplate - Figure 5

Technical disclosure for mass concrete construction of baseplate - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment