Uploaded on: 2019-09-21 09:18:02 come from: Road and bridge municipal administration / Road and bridge works / traffic engineering
zero
4 points

The project is XXX. Due to the impact of long-term scouring, the revetment at both sides of the bridge bottom has been hollowed out, and the cushion cap and pile foundation of the maintenance stairs are exposed, which seriously affects the safety of the bridge foundation. In order to ensure the safety of stair handrails, it is necessary to reinforce and maintain the revetments at both sides of the bridge bottom, and reinforce the cushion caps of the maintenance stairs. The main quantities include: silt excavation, filling, steel pipe bored cast-in-place pile, mortar block material, light colored granite veneer outside the retaining wall, and light colored granite guardrail.

 Construction organization design of bridge works (complete) - Figure 1

Construction organization design of bridge works (complete) - Figure 1

 Construction organization design of bridge works (complete) - Figure 2

Construction organization design of bridge works (complete) - Figure 2

 Construction organization design of bridge works (complete) - Figure 3

Construction organization design of bridge works (complete) - Figure 3

 Construction organization design of bridge works (complete) - Figure 4

Construction organization design of bridge works (complete) - Figure 4

 Construction organization design of bridge works (complete) - Figure 5

Construction organization design of bridge works (complete) - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment