[Shandong] Ward of a hospital Complex building construction organization
This document is the construction organization design of a hospital ward complex building in [Shandong]. It is a 54 page Luban Prize project. The project is in the form of steel bar frame shear wall structure. All floors are concrete floors. The basement is used for living and fire water pump room, power transformation and distribution room, garage, aseptic room, washing and disinfection dressing production room, etc. Scope of contracting works 1. Strong and weak current works. Water supply and drainage works: power transformation and distribution system, lighting system, lightning protection and grounding system, electrical fire monitoring and alarm system, equipotential bonding and overvoltage protection system, domestic cold water system, hot water system, sewage drainage and rainwater drainage system, fire hydrant water supply system, automatic sprinkler fire extinguishing system, oxygen supply suction and boiled water supply system. 2. Weak current engineering: automatic fire alarm system (fire broadcast), CATV security and teaching TV monitoring system, generic cabling system GCS, lightning overvoltage protection system, ward call system, etc.