Decoration and renovation of a welfare home in Guangdong engineering construction organization design
1. The first is to ensure safety and quality, and the second is to ensure the construction period. 2. Implement the "three high" and "one high level" to complete the project with high quality; The second is to control the whole process of construction with high standards, control the process with detection, let the process control the process, let the process control the whole; Third, the project shall be constructed with high efficiency, the whole process of each process operation shall be controlled, and the acceptance shall be qualified at one time. 3. Adhere to the "four first" principle. First, adopt advanced equipment and scientific configuration to meet the design requirements, procedure requirements and owner's requirements; Second, adopt advanced technology and process to ensure the quality requirements; Third, we should adopt advanced organization and management technology, combine the characteristics of the project, take overall consideration and make scientific arrangements; Fourth, we should use advanced engineering quality concepts to unify the ideological understanding of all staff involved in the construction, and fully implement high standards and strict requirements in every link of the construction. 4. Whole process monitoring: information construction tracks and monitors the whole process of each process, and feeds back all kinds of construction information of the whole construction process to the owner, design, supervision and other departments in time, and then feeds back to guide the construction.