Uploaded on: August 20, 2019 16:35:05 come from: Water supply and drainage / Water supply and drainage construction design / construction plan
zero
5 points

This document is the underground waterproofing construction scheme document of a large project in Beijing. The document includes: building characteristics: full cast-in-place reinforced concrete frame shear wall structure is adopted for the three underground floors, the underground part is ㎡ (including the civil air defense area of ㎡), and the number of building floors is 20 floors above the ground; 5 floors of partial podium; There are three underground floors.

 Underground waterproofing construction scheme of a large project in Beijing - Figure 1

Underground waterproofing construction scheme of a large project in Beijing - Figure 1

 Underground waterproofing construction scheme of a large project in Beijing - Figure 2

Underground waterproofing construction scheme of a large project in Beijing - Figure 2

 Underground waterproofing construction scheme of a large project in Beijing - Figure 3

Underground waterproofing construction scheme of a large project in Beijing - Figure 3

 Underground waterproofing construction scheme of a large project in Beijing - Figure 4

Underground waterproofing construction scheme of a large project in Beijing - Figure 4

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

  • Roof waterproof construction of a project in Beijing programme
    2. Overview of subdivisional works The roof waterproof grade is Grade II, and the reasonable service life is 15 years. The drainage method is the combination of open drainage and concealed drainage. The roof is designed as accessible roof (main building roof and podium roof) and inaccessible roof (roof machine room and staircase roof). The roof insulation layer is made of 50 thick polyblock board, and the roof waterproof layer is made of two layers of polyester tire SBS modified asphalt waterproof coiled material 3+3. The hot-melt method is used to fully stick the construction method. The waterproof protective layer: the accessible roof is made of colored cement bricks, and the inaccessible roof is made of silver colorant paint protective layer. Waterproof layer construction shall be carried out by qualified waterproof professional subcontractors, and all operators shall hold work permits issued by Beijing Municipal Construction Administrative Department. Three SCD200/200 construction elevators are used for vertical transportation of roof construction.
  • Waterproof construction of a residential project in Beijing programme
    2 Project Overview 2.1 Underground waterproof works The underground waterproofing grade of the project is Grade I, and the waterproofing is double fortification. Concrete rigid self waterproofing + (3+3) mm thick SBS waterproof coiled material (- 25 ℃ for fortification) is used for basement floor, exterior wall and earth covered roof, and water stop steel plate is used for waterproofing at the junction of basement floor and exterior wall. The horizontal construction joint, deformation joint, post cast strip and other detailed structures at the connection between the first floor and the second floor of the basement and the external wall are waterproof with water swelling waterstop. The vertical construction joint of the exterior wall of the basement also adopts water swelling waterstop. The impermeability grade of concrete self waterproof structure is S6. 2.2 Waterproof works of kitchen and toilet For indoor kitchens, toilets and other rooms with water, one component polyurethane film coating shall be used on the ground, with the film thickness not less than 1.5mm, and 1.5mm polymer cement-based composite waterproof coating shall be used on the wall. 2.3 Roof works The roof of the 15th floor is accessible roof, and the waterproof grade is Grade II. The waterproof layer is 3+3mm two layers of SBS waterproof coiled material (- 18 ℃ fortification); The 9th floor, podium roof and elevator machine room are non accessible roofs, the roof slope is 2%, the waterproof grade is Grade III, and 4mm thick SBS waterproof coiled material is used.
  • Waterproof construction of basement of a university building in Beijing programme
    The underground waterproofing of the project is concrete rigid waterproofing with impermeability grade up to S12+SBS modified asphalt waterproofing membrane paving+2:8 lime soil. The floor plan area of the basement is about 5489 ㎡. The foundation slab and the exterior wall of the basement are provided with post cast strips, which are divided into six pieces; Basement B1, 5.400m from the base plate to ± 0.000, and the facade area is about 1692m2.
  • Waterproof construction of the basement of a university apartment building in Beijing programme
    7. Safety technical measures 7.1 Pay attention to the wind direction during operation to prevent the operators from burning in the downwind direction. No construction is allowed above the force five wind. 7.2 The gasoline shall be far away from the operating point and other places where the coiled materials are being baked, and the safe place shall be selected. 7.3 A fire safety certificate shall be issued before daily operation, and special personnel shall be responsible for it. Fireworks are strictly prohibited at the construction site and material stacking place. 7.4 All materials and operation sites shall be prepared with fire extinguishers. 7.5 Ventilation devices shall be equipped in places with poor ventilation to prevent hypoxia and poisoning. 7.6 The blowtorch and fuel shall be placed separately during construction and shall be guarded by special personnel.
  • Formwork construction of a large stadium project in Beijing programme
    **The stadium concrete structure has various forms, many special-shaped components and large formwork quantities. In the construction process, our company will make full use of advanced construction materials and processes on the basis of ensuring the project quality to achieve the purpose of high quality, high-tech and high environmental protection. In combination with the characteristics of the construction scheme and use requirements of this project, we will ensure that all exposed concrete reaches the effect of fair faced concrete during construction. The quality, construction period and labor efficiency of cast-in-place concrete project largely depend on the selection of formwork system and the quality of project construction. Therefore, the selection of formwork system is one of the important issues to be considered in the construction organization design. This requires the adoption of an advanced and scientific formwork system, and on the basis of ensuring the excellence of the Olympic project, scientific and thorough formwork design should be carried out to minimize investment, accelerate the construction process, and achieve the replacement of formwork. This is to realize the enterprising spirit and scientific and technological concept of the Olympic Games in terms of construction.
  • Curtain wall construction of a large theater in Beijing programme
    Structure overview A (as shown in the figure below) is located in the center of Beijing, west of * *, with a total floor area of about 200000 m2. It consists of three parts: the north building (Zone 201 - underground parking lot), the central building (Zone 202 - main building of the Grand Theater), the south building (Zone 203 - underground main room), and other auxiliary facilities.
  • Underground waterproofing construction of a high-rise office building in Beijing programme
    Building function office building and supporting facilities Building area Total building area m2 83300 ㎡ Floor area m2 11967.67 ㎡ Underground building area m2 23300 ㎡ Ground building area m2 60000 ㎡ Number of building floors: underground 3, above ground 17 floors of building A, 18 floors of building B, 3 floors of building C (local 2 floors) The building height is 3.7m for the third underground floor, 4.5m for the second underground floor and 4.5m for the first underground floor. The floor height of the first floor of building A above the ground is 5.1m, and the floors 1~17 are 3.65m; The floor height of the first floor of building B is 5.1m, and the floors 1 to 18 are 3.4m; The first floor of building C is 4.2m, and the second and third floors are 3.8m. The maximum cornice height of buildings A and B is 65m, and that of building C is 12.9m Horizontal axis No. 1~15 Vertical axis No. A~W Horizontal axis distance 83900mm Vertical axis distance 104750mm Class I high-rise building with fire resistance rating of Class I Exterior decoration glass curtain wall, stone curtain wall Interior decoration ceiling cement mortar plastering, aluminum plate mesh perforated plate ceiling, aluminum alloy strip ceiling, calcium silicate board ceiling Floor fine aggregate concrete, cement mortar, floor tile, vitrified tile, heat radiation floor heating pipe floor, rigid PVC anti-static raised floor, granite slab and other floors Interior wall water-based scrub resistant coating, glazed tile, aluminum plate mesh perforated plate wall Door and window engineering civil air defense door, wooden door, fire door, sound insulation door, fire rolling shutter door Waterproof basement floor and exterior wall 4+3 thick SBS modified asphalt waterproof coiled material (type II polyester non-woven fabric base) Roof 3+3 thick SBS modified asphalt waterproof coiled material (Type II polyester non-woven fabric base) 1.5 thick single component polyurethane film waterproof layer in toilet Insulation engineering roof insulation 70mm thick extruded board insulation layer Wall insulation 70mm thick polystyrene board external insulation
  • Waterproof construction of basement of an office building in Beijing programme
    ***The * * * Building Project of the Exploration and Development Research Institute is located in the * * * Exploration and Development Research Institute, designed by Beijing * * * Architectural Design Consulting Co., Ltd., with a total construction area of 33596m2, two floors underground and eight floors above the ground, and a cornice height of 40.870-46.500 meters. The underground part is reinforced concrete steel reinforced concrete structure, and the above ground part is steel frame structure. The waterproof grade of the basement of the project is designed as Grade II, and the waterproof grade of the underground waterproof concrete is Grade I. According to the design of the basement waterproof method, two layers of S8 impermeable concrete+two layers of 3mm thick SBS elastomer modified asphalt (type II polyester tire) waterproof coiled material are used for two layers of defense. The strength of the foundation slab concrete of the project is C35, S8, the wall is C40, S8, and the rest of the beams and slabs are made of C40 concrete. Because the project site is narrow and small, the computer building foundation on the south side is only 525mm away from the exterior wall of the project, so the waterproofing of the south exterior wall is directly done on the slope protection, and the slope protection is used as the external formwork and waterproof layer protection wall of the basement exterior wall.
  • Underground waterproofing construction of a hospital medical building in Beijing programme
    Beijing * * * Hospital Cadre Health Care Base Project is a comprehensive cadre health care base integrating outpatient services and wards. The project has two underground floors, which are connected as a whole, and the main functions are garage, equipment room, and medical supporting room; The ground is divided into two parts. The first part is a four storey outpatient building with a height of 21.95m; The second part is a 12 storey ward building with a height of 50m. The total building area is 80501m2, including 24996m2 of basement area and 55505m2 of overground area.
  • Waterproof construction of a residential basement in Beijing programme
    Method: The first layer of SBS coiled material at the bottom plate shall be constructed by empty laying method, and only the surrounding areas that need to be fixed and positioned, the parts where the geometric shape changes in three-dimensional space, the additional layer, the foundation pit and other parts shall be fully fused and adhered; The double-layer coiled materials are fully fused and fixed. The SBS coiled material and the base layer, coiled material and coiled material at the exterior wall and roof are fully bonded by hot melt method. At the position to be fixed by hot melting, the matching base treatment agent shall be applied before the coiled material is paved to repair the defects of the base layer and improve the adhesion between the coiled material and the base layer. Before the construction of the surrounding of the bottom plate that needs to be fixed and positioned, the part where the geometric shape changes in three-dimensional space, the additional layer, and the coiled material at the cushion cap, foundation pit and side wall, a layer of base course treatment agent must be painted on the base course, and the empty part does not need to be painted. The coiled materials of the upper and lower layers shall not be laid vertically to each other. The lap joint of the large side and short side between the same layer shall be staggered for at least 1.5m, and the lap joint between the upper and lower layers shall be staggered for 1/3~1/2 width (the junction of the bottom plate/top plate and the external wall shall be determined according to the actual situation on site).
  • Waterproof construction of underground garage in a residential area in Beijing programme
    This document is the waterproof construction scheme document for the underground garage of a residential area in Beijing. The document includes: the underground garage of the residential area is located in the south of * *, the north of * *, the east of * * West Road, and the west of 76 # and 77 # buildings that have been built. The underground garage has two floors, with a building area of 10000.00 m2. The base elevation is -15.03m. The top is covered with three meters of soil.
  • Waterproof construction of a project in Beijing programme (Roof, toilet, basement)
    3. Construction technical conditions and requirements (1) The surface of the base course shall be clean and flat without hollowing, looseness, sanding and peeling; (2) All internal and external corners shall be chamfered with 1:2.5 cement mortar, and 50cm wide additional waterproof layer (25cm on both sides),; (3) Waterproof reinforcing layer shall be laid between the waterproof layer and the structure at all construction joints and deformation joints, and the reinforcing layer shall be made of the same material as the waterproof layer in a single layer with a width of 50cm; (4) The first layer of SBS coiled material laid on the concrete cushion at the bottom plate shall be constructed by the empty laying method. Only the surrounding areas that need to be fixed and positioned, the parts where the geometric shape changes in three-dimensional space, the additional layer, and the cushion cap and foundation pit, etc., shall be fully bonded by hot melting between the coiled material and the base course. The second layer of SBS coiled material and the first layer of coiled material are bonded by hot melt full bonding;
  • Waterproof construction of a large Olympic stadium in Beijing programme
    Ending treatment of coiled material The closing treatment of waterproof coiled material is the concentrated performance of the safety performance of the waterproof system. If the closing treatment is not good, it will lead to the waterproof failure of the entire vertical wall. The use of special closing metal battens will greatly help to extend the safe service life of the waterproof system on the premise of ensuring the safety performance of the waterproof system.
  • Waterproof construction of a project in Beijing programme (15 pages)
    The waterproof grade of the basement and roof of the project is Grade I, and the standard is that no water seepage is allowed, and the surface is free of wet stains. Since there is a cultural relics warehouse underground, a small amount of wet stains will deteriorate the articles, and it is also an extremely important civil air defense project, so the waterproof project is extremely important for this project, and the occurrence of quality hazards such as "running, emitting, dripping, seepage, and leakage" will be eliminated. Strengthen detail treatment. See Table 1-1 for details of waterproof materials for each part. Among them, SBS waterproof membrane, waterproof coating and self-adhesive waterproof membrane are high-grade products of domestic first-class brands, and permeable crystalline waterproof materials are high-grade products of imported first-class brands. The construction can be carried out only after the products pass the re inspection.
  • Waterproof construction of a residential building in Beijing programme
    The total floor area of the tower and residential building project in the East Second District of a residential building renovation project in Beijing is 86096.97m2, which consists of six parts: tower, 1 # residential building, 2 # residential building, 3 # residential building, 4 # residential building and 5 # residential building. The tower part is a full cast-in-place frame structure, with seismic fortification of 8 degrees, and the foundation is an independent column foundation plus water-resistant plate; The residential building is a full cast-in-place reinforced concrete shear wall structure, with seismic fortification of 8 degrees, and the foundation form is box foundation.
  • Formwork construction of a large museum in Beijing programme
    Site overview: The construction site of this project is narrow, and there is almost no site outside the foundation pit to be used. The only space must give priority to ensuring traffic roads. Almost all formwork processing and fabrication shall be completed at the temporary site or off-site. For formwork selection, priority shall be given to the stereotyped formwork that can be processed and fabricated off-site, or the formwork system shall be properly assembled off-site to minimize on-site assembly and processing operations.
  • Concrete construction of a large conference center in Beijing programme
    Project Overview * * * Park (Area B) Conference Center Supporting Facilities Project Area is located in Chaoyang District, Beijing, east of * * * West Road, south of * * * * Road, west of * * * West Road, north of * * * * Road, and is designed by * * * * Architectural Design and Research Institute of Beijing. The project has two underground floors and three underground floors locally; Sixteen floors above the ground, the eaves of the main building is 60m high, and the first and second floors are podiums, with the eaves of the building being 17m high. The tower is divided into A, B, C and D, which are economic hotels, five-star hotels, Grade A office buildings and standard office buildings. The project has a land area of 40738.76 m2 and a total building area of 263818 m2, including 201758 m2 above the ground and 62020 m2 underground (excluding 110000 V substation). The ground building of the project covers an area of 398.2m long in the north-south direction and 85.5m wide in the east-west direction. The structural form of the project is cast-in-place reinforced concrete frame shear wall structure, and the shear wall is arranged in the internal traffic core of each main building. Beam slab raft foundation is adopted as the foundation, CFG pile composite foundation is adopted for the high-rise part of buildings A, B, C and D, and natural foundation is adopted for the podium part and pure underground part. The total amount of concrete is large, the strength grades are C15, C30, C40, C50, C60, and the impermeability grade of concrete is P8.
  • Masonry construction of a large conference center in Beijing programme
    The total floor area of the project is 4.15 hectares, with the longest north-south length of 400.4 meters, the widest east-west width of 104.7 meters, and the total construction area of 264000 square meters; Two storey concrete structure basement; The ground is divided into four main buildings A, B, C and D, and the main buildings are connected by podium. The structural form is frame shear wall structural system; Among them, Block B and C are 14 floors, and Block A and D are 16 floors. The masonry part of the project is mainly distributed in the outer enclosure structure and the inner partition wall.
  • Steel bar planting construction of a large conference center in Beijing programme
    ****The Park (Area B) Conference Center Supporting Facilities Project Area is located in Chaoyang District, Beijing, to the east of * * * * West Road, to the south of * * * * Road, to the west of * * * West Road, and to the north of * * * Road. It is designed by * * * * Architectural Design and Research Institute of Beijing. The project has 16/14 floors above the ground. The eaves of the main building is 60m high. The first and second floors are podiums, and the eaves of the building is 17m high. The tower is divided into A, B, C and D, which are economic hotels, five-star hotels, Grade A office buildings and standard office buildings. The project has a land area of 40738.76 m2 and a total building area of 263818 m2, including 201758 m2 above the ground and 62020 m2 underground. The ground building of the project covers an area of 398.2m long in the north-south direction and 85.5m wide in the east-west direction. The structural form of the project is cast-in-place reinforced concrete frame shear wall structure, and the shear wall is arranged in the internal traffic core of each main building. The total amount of concrete is large, and the strength grades are C30, C40, C50, C60, etc. According to the construction needs, the local structure displacement of the project, the change of the portal location, the need to re increase the rooting of the reinforcement for the later added vertical components, and the tie bar of the masonry wall, etc., adopt the post planting reinforcement anchorage scheme.
  • Grid construction of a large conference center in beijing programme
    Project Name Supporting Facilities of Beijing * * * Park (Area B) National Convention Center Construction unit: Beijing * * * Conference Center Development Co., Ltd Designer: Beijing * * * Architectural Design and Research Institute Supervision unit * * * * Engineering Construction Supervision Co., Ltd General contractor: * * * Engineering Bureau of CSCEC Project location Beijing
  • Earthwork construction of a large public building in Beijing programme
    According to the elevation of the basement, the remaining earthwork in Area I is about 27392 m3, that in Area II is about 26032 m3, that in Area III is about 27902 m3, that in Area IV is about 8938 m3, that in Area V is about 8772 m3, that in Area VI is about 1578 m3, that in Area VII is about 7820 m3, and that in Area VIII is about 4756 m3, The remaining earthwork on site is about 113190m3 in total. If two ramps are considered, the remaining earthwork is 123440m3. See the foundation pit excavation plan partition, foundation elevation plan and foundation pit section for details.
  • Roof waterproofing construction of a building in beijing programme (sbs)_Word
    1. According to the requirements of the quotation instructions, project specifications, project unit price list and drawings, our company is willing to undertake and complete the whole project within the contract period in the following amounts: RMB (in words) (RMB?). 2. We understand that if our offer is accepted, we will sign a waterproof material supply and construction contract with the owner. Our company promises to supply materials to the owner on time according to the delivery schedule of the future supply contract, and complete the waterproof construction project within the time required by the owner.
  • Waterproof construction of SBS coiled material for an underground project in Beijing programme
    4.3.1 Prepare for fire fighting on site and equip fire fighting equipment to prevent fire accidents during coiled material construction. 4.3.2 Prepare a waterproof coiled material warehouse and a small machine and tool warehouse, equipped with fire extinguishers and isolated from flammable and explosive materials. 4.3.3 Before the waterproof construction of the outer wall, the upper opening of the foundation pit shall be provided with a protective shed with a scaffold board, which shall be pulled down with a safety net to protect the air above the waterproof construction face to prevent the upper construction falling objects from hurting people. At the same time, a special person shall be arranged beside the foundation pit to pay attention to the conditions above the working face at any time. 4.3.4 The moisture content of the base course should not be greater than 9%. A simple test method for water content: a piece of 1m * 1m soft coiled material (such as plastic film) can be laid flat on the cleaned leveling layer and left for 3 to 4 hours. If the surface color of the base layer covered with coiled material is still the same as that of the surrounding covering parts (that is, there is no obvious watermark), waterproof construction can be carried out.
  • Waterproof construction of SBS coiled material in basement of a complex building project in Beijing programme
    This document is the SBS coiled material waterproof construction scheme document for the basement of a complex building project in Beijing. The document includes: the project adopts the external waterproof external sticking method, and the construction period of the plane coiled material waterproof layer is 3 days; Day 1: Clean the base course and brush the base course treatment agent; The second day: paving waterproof membrane; The third day protective layer.
  • Waterproof construction of a project in Beijing programme (Roof, toilet, basement) Word
    1 * * Actual site conditions, bidding documents and design requirements of the waterproof project of the International Apartment. 2. Relevant national technical specifications, quality standards, acceptance standards and codes, and other relevant regulations in force (1) Technical Code for Roof Engineering (GB50345-2001), (2) Code for Quality Acceptance of Roof Engineering (GB50207-2002), and (3) Unified Acceptance Standard for Construction Quality of Building Engineering (GB50300-2001)
  • Underground waterproofing construction of a residence in Beijing programme (Rigid soft combination)
    This document is the underground waterproofing construction scheme (rigid flexible combination) document of a residential building in Beijing. The document includes: the waterproofing grade of the basement of this project is Grade I, which adopts rigid flexible combination and two layers of fortification. The rigid waterproof adopts impermeable concrete structure for self waterproof, with impermeability grade of 1.6Mpa. The flexible waterproof adopts two layers of APP I type 3mm thick modified asphalt waterproof coiled material flexible waterproof layer.
  • SBS waterproofing construction of basement of a complex building in Beijing programme
    The patent business information building project of the State Intellectual Property Office is located in the courtyard of the State Intellectual Property Office, adjacent to the North Third Ring Road in the south, Beiying and North South Urban Branch Road in the east, with a total floor area of 40445.41m2. The structural form is cast-in-place reinforced concrete frame shear wall structure, and the foundation is beam slab raft foundation. There are two floors underground, 13 floors above the ground, and 14 floors locally. The maximum depth of the foundation pit is 11.9m. As the construction site of the project is narrow and small, the foundation pit is supported by vertical soil nailed walls, so the basement waterproofing is constructed by the method of external waterproofing and internal pasting. The waterproof system of concrete structure self waterproofing (C40/S8) and two layers of SBS waterproof coiled material III+II applied externally is used for the waterproof of the baseplate and external wall.
  • Waterproof construction of a residential basement in Beijing programme Word
    ****Residential Area (Phase II) A Demonstration Area Project is located in * * *, Haidian District, Beijing, with a floor area of about 19077 ㎡. The construction unit is Beijing * * * Land Co., Ltd.
  • Underground waterproofing construction of a hospital medical building in Beijing programme Word
    Beijing * * * Hospital Cadre Health Care Base Project is a comprehensive cadre health care base integrating outpatient services and wards. The project has two underground floors, which are connected as a whole, and the main functions are garage, equipment room, and medical supporting room; The ground is divided into two parts. The first part is a four storey outpatient building with a height of 21.95m; The second part is a 12 storey ward building with a height of 50m. The total building area is 80501m2, including 24996m2 of basement area and 55505m2 of overground area.
  • Underground waterproofing construction of a directional resettlement house in Beijing programme
    Underground waterproofing construction scheme of a directional resettlement house in Beijing, waterproofing construction scheme of 10-5 # and 10-6 # buildings in A1-10 plot of the directional resettlement house project at Liangzhanyi Street, Tongzhou section of the light rail L2 line,
  • Underground formwork construction of a large basketball stadium in Beijing programme
    Construction difficulty 2.3.1 Bottom plate of the competition floor: the core area of the competition hall is the competition floor, and its bottom plate (size: 73m × 61m × 0.6m) is a protruding part. The bottom elevation is 7500mm higher than the wall foundation of the adjacent equipment floor, which adds difficulty to the wall formwork support. 2.3.2 There are many changes in structural dimensions: there is no standard floor, and the floor heights are different, up to 10m; The column section varies from 600mm × 800mm to 4350mm × 1200mm; Wall thickness varies from 200 mm to 800 mm; The beam section includes 400 × 500mm secondary beam and 800 × 1600mm deep beam; Most of the top plates are 200mm thick, and a few are 600mm and 800mm thick. There are so many size types, which brings great inconvenience to template configuration. 2.3.3 Fair faced concrete construction: according to the requirements of the design drawings, some columns and walls are made of fair faced concrete. The concrete is required to have a flat surface, no plastering, no obvious holes, and uniform color after pouring, molding, and formwork removal. This requires that the mold release agent has: easy mold removal (affinity of the mold release agent to the template); The concrete surface shall be free of sanding and air holes (the affinity of release agent to concrete); Do not stain the concrete surface (type and activity of oily components of release agent); Do not stain the rusted formwork (the release agent is acidic and alkaline, and whether there are anti rust components); Good water resistance and heat resistance.
  • [Beijing] Underground waterproof construction of school project programme
    4. Construction preparation 4.1 Waterproof coiled material must be provided with factory certificate, Beijing permit, test report, anti-counterfeiting mark and material specification. 4.2 Qualification review: the professional waterproof team shall issue the business license, the construction committee certification, the enterprise safety production qualification certificate issued by the labor bureau and the work certificates of various personnel, which shall be reviewed by the project department, Party A and the supervisor. 4.3 After the materials are transported to the site, the appearance inspection shall be carried out first, and the coiled materials shall be free of wrinkles, neat edges and damages; Witness test shall be carried out before use, and the Project Department shall contact with the Supervisor to take samples for inspection under the supervision of the Supervisor according to the specifications. The cementation material test or trial mix report shall be qualified, and the base course shall be clean and dry, and construction can be started only after it is qualified. 4.4 Organize technicians and operation teams to be familiar with construction drawings and design specifications, participate in design disclosure, understand and master the design content, carefully study the current specifications, standards and relevant construction common sense and key points, be aware of them, eliminate blind command and operation, and conduct detailed disclosure in writing before construction. 4.5 Each operation team shall set up a quality inspection team, strictly implement the "three inspection system", report to the Project Department for acceptance after passing the acceptance, and report to the Supervisor for inspection after passing the re acceptance, and implement joint inspection to ensure the quality. 4.6 Prepare the material plan, and reasonably arrange materials, machines and tools, auxiliary materials, etc. to enter the site in time according to the construction progress and scale of the site. 4.7 A layer of 3+3SBS polyester tire waterproof coiled material is used as the waterproof coiled material, and the side wall pipe is used as the waterproof casing. 4.8 Tool preparation: trolley, broom, ruler, tape measure, powder bag, cutter, roller brush, scraper, brush, etc. 4.9 See the corresponding construction scheme for basement pipeline and other water and electricity embedment, and see the specific construction scheme for concrete, reinforcement and other construction methods. 4.10 Check the water content of the leveling layer before the construction of the waterproof layer: the method is to lay 1 square meter of coiled material on the leveling layer in the sun. After 3 to 4 hours, lift it up to check that there is no watermark, and then the waterproof coiled material construction can be carried out.
  • Waterproof construction of a residential project in Beijing programme
    Building 2 # in the north area of the community has a building area of 15829.51 ㎡, with two floors underground and 23 floors above the ground, CFG pile composite foundation, box foundation, and full cast-in-place shear wall structure. The underground waterproof grade is Grade I, and the underground waterproof requirements: the structural foundation floor, exterior wall, and civil air defense roof are C35 concrete, and the impermeability grade is S8. The requirements for waterproof materials in several parts are as follows: Base plate: SBS Ⅲ+Ⅲ modified asphalt waterproof coiled material. Underground wall part: SBS Ⅲ+Ⅳ modified asphalt waterproof coiled material. Roof: waterproof grade II, SBS Ⅲ+Ⅳ plus modified asphalt waterproof coiled material Kitchen and toilet room: 1.5 thick acrylic film waterproof coating.
  • Waterproof construction of a commercial building in Beijing programme
    This project is a transitional commercial building project at the exit of * * * Station of Beijing Metro Line * *, which is located next to the exit of Metro Line * * Station at the intersection of * * Street and * * North Street in Dongcheng District. It is a commercial building. One floor underground and two floors above the ground. The total construction area is 11406.61m2, including 9260.98 m2 of ground construction area and 2145.63 m2 of underground construction area. The design section is three pieces of land. Areas C1 and C2 are located in plot 3, D1 is located in plot 2, and D2 is located in plot 1. The foundation adopts beam slab raft foundation. Waterproof level: basement level I, roof level II.
  • Waterproof construction of a scientific research complex building in Beijing programme
    This document is the waterproof construction scheme document of a scientific research complex building project in Beijing. The document includes: this project is the * * Scientific Research Office Building of * * Technology Group, located in * * Township, * * District, on the west side of * * Road, adjacent to the original units in the current reserved plot in the north, and the second phase residence of * * New Village in the west and south. With a total area of 12500 square meters, it is a comprehensive building with scientific research and office as its main function.
  • Waterproof construction of a residential building in Beijing programme _Word
    1.1 * * Design drawings of 102 # building in residential area 1.2 * * Construction organization design of 102 # building in residential area 1.3 General atlas of building structure (88J6) 1.4 Recommended practices for basement waterproofing in Beijing (Beijing 95TJ3) 1.5 Technical code for waterproofing of underground works (GB50108-2001) 1.6 Code for quality acceptance of underground waterproofing works (GB50208-2002)
  • Safety management of a large underground garage project in Beijing programme
    The project will adhere to the policy of "safety first, prevention first", strictly implement the relevant regulations issued by the State and Beijing Municipal Commission of Construction, earnestly implement the rules and regulations related to safety production, strengthen the inspection of safety production, and at the same time, through careful planning, careful organization, rigorous planning, strict management and the best combination of project department personnel, Formulate targeted and operable construction organization design, various construction schemes, safety technology assurance measures and various safety management systems, so that all sub divisional and sub divisional processes throughout the construction process are in an organized and controlled safety state, so as to standardize the management work, and finally achieve the safety management objectives of the project.
  • External thermal insulation construction of a large residential area project in Beijing programme
    1、 Preparation basis 1. Building construction drawings. 2. Code for Thermal Design of Civil Buildings GB50176 3. Standard for Energy Efficiency Design of Civil Buildings JG126 4. Technical Specification for Construction of External Thermal Insulation of External Wall (polystyrene board glass fiber gridding cloth polymer mortar), No.: DBJ / T01-38-2002 5. Standard for Quality Inspection of Polymer Mortar for External Insulation of External Walls, No. DBJ01-63-2002 6. General atlas of building construction 88J2-9 Wall body external insulation energy saving 65% 7. Molded ethylene foam for thermal insulation GB/T10801.1-2002 2、 Project overview The project is divided into two areas, A and B, which are composed of five slab buildings, with a total construction area of 90325.92m2, an underground area of 22189m2, and an aboveground area of 70812m2. Area A mainly includes: 1 # - 3 # multi-storey residential buildings on the ground. Block B mainly includes No. 4 and No. 5 multi-storey residential buildings. The design service life of the project structure is 50 years; Fire resistance rating of building: Grade I; Seismic fortification category: Class C; Seismic fortification intensity: 8 degrees. The underground wall works of the project: the external wall is reinforced concrete wall, the impermeability grade is S6, and ceramsite concrete hollow block filled wall. Above ground part: reinforced concrete wall, ceramsite concrete hollow block filled wall. The external insulation of this project adopts polymer mortar to paste extruded polystyrene board 70 thick for the north wall, and the rest is 50 thick. 45 thick rigid foam polyurethane insulation is adopted for the bottom of the board in the local overhanging room. The roof insulation adopts 100 thick extruded polystyrene board.
  • Construction of steel truss formwork floor of a large project in Beijing programme
    The steel bar truss formwork is a composite formwork that processes the steel bars in the floor slab into steel bar trusses in the factory and connects the steel bar trusses with the bottom formwork. In the construction stage, it can bear the dead weight of concrete and construction load. In the use phase, the steel truss and concrete work together to bear the service load. The steel bar truss formwork reduces the on-site steel bar binding work by about 70%. The spacing between the upper and lower layers of steel bars and the thickness of concrete cover can be guaranteed, and the steel bars are arranged evenly. On the construction site, the steel truss formwork can be directly laid on the steel beam, and then simple reinforcement works can be carried out to pour concrete, which improves the floor construction efficiency. The truss stress mode is reasonable, which can provide greater stiffness of the floor support plate, and can greatly reduce or eliminate the need for temporary support for construction. The bottom formwork is not subject to force during the use stage, so fire prevention and corrosion prevention are not required to be considered. When the concrete is poured to form the floor slab, it has the advantages of large overall rigidity and good seismic performance of the cast-in-place slab. Overview of steel truss formwork floor and steel truss formwork materials
Click to see more