Special construction for temporary power use of n3n6 plot programme
Project name: Suzhou Industrial Park * * N3, N6 (buildings A, B, C, D, E, F) Geographic location: Employer: Designer: Supervisor: Contractor: Project content: Relative elevation is adopted for design, N3 project ± 0.000=Yellow Sea elevation 3.600m, N6 project ± 0.000=Yellow Sea elevation 3.700m. Our project department is responsible for more than 30cm of the bottom of the foundation pit, cushion cap, foundation beam, excavation and repair of soil and masonry of brick mold. The foundation pit of the project is deep, with a large scope and many mechanical equipment. Especially, the underground construction conditions are complex. After careful calculation for the above conditions, the following temporary power construction scheme was developed through discussion.