[Anhui] Detailed Rules for Implementation of Masonry Engineering Supervision of Metro Comprehensive Base
The XX depot and comprehensive base of Phase II Project of XX Rail Transit Line XX are located behind the terminal station XX, at the intersection of the planned Tibet Road and the planned Pearl River Road, with a total land area of 30.815 hectares. The function of XX vehicle base is positioned as the major un wheeling repair base in the line network, which undertakes the major un wheeling repair tasks of vehicles of XX Line, Line 5, 5A, 5B of rail transit in XX City, undertakes the regular and temporary repair tasks of vehicles allocated to XX Line, undertakes the parking, train inspection, monthly inspection, vehicle cleaning, cleaning and disinfection tasks of vehicles allocated to this section, and is responsible for the general administration, technical management Material supply and logistics management. Production area, living area, other auxiliary building facilities, plant roads and greening are arranged in the site. The project includes civil works, power lighting, ventilation and air conditioning, water supply and drainage and fire fighting, outdoor pipelines, roads, retaining wall works and track works. There are 17 single buildings in the yard, namely, joint repair shop, operation shop, general material warehouse, comprehensive maintenance center, comprehensive maintenance workshop, engineering garage, oily sewage treatment station, air compressor station, special garage, material shed, hybrid substation, signal building, washing shop, internal combustion engine garage, wheel set pantograph dynamic detection station, combustible warehouse and guard room. The total construction area of the bid section is 100553 square meters. The scope of use of masonry works includes wheel set pantograph monitoring station, material shed, internal combustion engine garage, guard room, engineering garage, washing garage, special garage, air compressor station, signal building, hybrid substation, general material warehouse, comprehensive maintenance garage, inflammable goods warehouse, oily sewage treatment station, joint maintenance garage, operation warehouse, comprehensive maintenance center 17 single masonry structures (including some secondary planting bars and structural beams and columns).