Elevator installation construction organization of a building design scheme
Catalog of elevator installation construction scheme I, compilation basis II, project overview III, construction preparation IV, elevator foundation construction V, elevator installation and removal VI, elevator attachment VII, construction technical data preparation VIII, safe and civilized construction I, compilation basis 1, safety rules for construction elevators 2, safety technical regulations for use of construction machinery 3, manual construction II Project overview The total height of the cable-stayed bridge is 66m, and it is a cast-in-place structure on the ground. The seismic fortification intensity is 8 degrees. In order to meet the needs of on-site construction personnel, the project decided to install a SCD200/200 elevator at the site, with a total height of 69 meters. The foundation of the tower crane elevator is a concrete slab foundation. 3、 Construction preparation 1. Accurately locate the elevator on site. 2. SCD200/200 elevator foundation is made, and the strength grade of foundation concrete is C20. The elevator will be installed after the strength reaches 80%. 3. Special electric box for elevator must be equipped to meet the normal operation of elevator