Construction quality supervision of building waterproof engineering Implementation Rules
The detailed rules include rigid waterproof materials commonly used in underground waterproof works, water storage tanks, roof waterproof works, and toilet and bathroom waterproof works. Sealing (caulking) waterproof, coiled material waterproof, film waterproof, etc. In order to completely eliminate the common quality problems of "four leakages" (roof, toilet, basement and exterior wall body leakage) of building waterproof engineering, ensure no leakage. During the whole process of waterproof construction, the supervision engineer must adhere to the principle of quality first, take design documents, construction acceptance specifications, project quality inspection and evaluation standards as the basis, focus on quality pre control, and carry out comprehensive quality control on human, machine, material, method, environment and other factors. By means of inspection, measurement and test, strengthen the control of key processes and key parts, adhere to quality standards, and use standardized, procedural, standardized and scientific management methods to make the quality of waterproof works meet the design requirements and the provisions of relevant standards and specifications, so that the contractor can fully achieve the quality objectives of the project.