Water, heating and electricity construction scheme for a building project in Beijing
This project is a building project in Beijing. The project has 15 floors above the ground, 2 floors below the ground, and the underground 2 floors are designed as the wartime civil air defense material warehouse and peacetime garage. The first floor below the ground is the garage, and the first to fifth floors are podiums. There are shopping malls, offices, restaurants, dance halls, bathing facilities, swimming pools, bowling courts, tennis courts, etc., and the sixth to fifteenth floors are equipped with offices and guest rooms. The heating and sanitation works of the project include domestic water supply system, domestic hot water supply system, cooling water circulation system, indoor fire water supply system, swimming pool water supply and drainage system, reclaimed water treatment system, domestic sewage drainage system, rainwater drainage system; Heating, ventilation and air conditioning works include air conditioning system, ventilation system, water system and heating system; Electrical engineering includes power supply system for power equipment, power supply system for lighting equipment, cable television system, fire alarm and linkage control system, integrated wiring, security monitoring system, lightning protection and grounding equipotential system, and weak current part is only used for piping.