Uploaded on: 2018-06-29 16:53:03 come from: Construction documents / Building construction scheme / Roof construction scheme
zero
3 points

1.1 Before the construction of inverted roof, the construction team shall carefully read the drawings and refer to the relevant atlas, and shall be clear about the detailed structure and technical requirements. Carefully read the technical disclosure 1.2 After the construction of inverted roof works, pay attention to the protection of finished products, and do not drill holes, transport or stack them casually. 1.3 Pipes, flues, equipment, sporadic facilities (through pipe ladders, lightning rods, etc.) or embedded parts that extend out of the roof should be fixed in the structural layer, and should be installed before the construction of the sloping layer. The waterproof layer and insulation layer should be tightly wrapped, The top should be sealed. 1.4 The sealed waterproof layer should avoid collision and pollution. If necessary, shielding measures should be taken.

 Technical disclosure of inverted roof construction - Figure 1

Technical disclosure of inverted roof construction - Figure 1

 Technical disclosure of inverted roof construction - Figure 2

Technical disclosure of inverted roof construction - Figure 2

 Technical disclosure of inverted roof construction - Figure 3

Technical disclosure of inverted roof construction - Figure 3

 Technical disclosure of inverted roof construction - Figure 4

Technical disclosure of inverted roof construction - Figure 4

 Technical disclosure of inverted roof construction - Figure 5

Technical disclosure of inverted roof construction - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment