Construction of building decoration works design scheme
4.3.1 Design according to the outer eaves drawing to ensure that the outer eaves are pasted symmetrically and beautifully like mushroom stones, accurately calculate and adjust the gap t, and the paint spray block is uniform, three-dimensional, and ensure the effect. 4.3.2 Sample making: before the structure is accepted, select the site enclosure or the external wall of the office to carry out the construction of the outer edge decoration sample, and apply soil to solve the uniformity of the coating block and the A-body feeling, so as to reach the pre controlled quality standard. For interior decoration, select representative rooms for sample construction, including: fine stone wave floor sample, kitchen, bathroom wall, floor tile sample, and sample room on the second floor above the ground. Large area construction will be carried out after self inspection by all disciplines of the company, acceptance by the supervisor and the owner. 4.3.3 Water, electricity and civil engineering circle review: in order to avoid the rework of the project caused by the wood circle between disciplines, before decoration, the chief engineer of the company and all professionals of the project shall participate in the circle review of the discipline, and all equipment, holes, devices, etc. in the same position shall be drawn on a drawing by computer. If there is no circle, it shall be solved in advance before decoration.