Uploaded on: 2018-05-19 12:01:59 come from: electrical engineering / Building electrical / Residential building
zero
4 points

1、 XX Yang XX Lianpai Housing Project is invested and constructed by XX New XX Industry Co., Ltd. Project address: YangXX, Chengdong Town, XX County. The project is 7 multi-storey residential buildings with a total floor area of about 100000 square meters. Structure type: the main body of the foundation is brick concrete structure. M10 Yangtze River muddy sintered bricks are used below foundation+0.00, and 240KP1 clay perforated bricks are used for internal and external walls above foundation+0.00; Metal burglar proof door and aluminum alloy window are used for the entrance door; For decoration, the internal wall is latex paint, the external wall is paint, the floor is cement mortar, and the external wall is insulated with 30 thick extruded insulation board.

 [Jiangsu] Supervision Planning of Brick concrete Structure Housing Project - Figure 1

[Jiangsu] Supervision Planning of Brick concrete Structure Housing Project - Figure 1

 [Jiangsu] Supervision Planning of Brick concrete Structure Housing Project - Figure 2

[Jiangsu] Supervision Planning of Brick concrete Structure Housing Project - Figure 2

 [Jiangsu] Supervision Planning of Brick concrete Structure Housing Project - Figure 3

[Jiangsu] Supervision Planning of Brick concrete Structure Housing Project - Figure 3

 [Jiangsu] Supervision Planning of Brick concrete Structure Housing Project - Figure 4

[Jiangsu] Supervision Planning of Brick concrete Structure Housing Project - Figure 4

 [Jiangsu] Supervision Planning of Brick concrete Structure Housing Project - Figure 5

[Jiangsu] Supervision Planning of Brick concrete Structure Housing Project - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

  • Project supervision of a commercial residential building in Jiangsu Province plan
    1. Project name: * * Commercial residential buildings A # and B # 2. Construction unit: * * Comprehensive Real Estate Development Co., Ltd. 3 Project location: 4 Project scale: the total building area is 7869.48 square meters. The residence has seven floors of brick concrete structure, the foundation is pile foundation, and the main body is brick concrete structure. 5. Designer: Suzhou * * Architectural Design Institute Co., Ltd. 6 Geological exploration unit: Suzhou * * Architectural Design Institute Co., Ltd. 7 Construction unit: Zhejiang * * Construction Group Co., Ltd. 8 Planned commencement date and duration: it is planned to start on September 1, 2008, with a total duration of 300 days.
  • Project supervision of a residential building in Nantong City, Jiangsu Province plan
    1.1. Project Owner: * * Second Construction 1.2. Project Name: 1 # Residential Building 1.3. Project Construction Location: * * Luhong Gate 1.4. Project Composition and Scale 1.5. Project Design Features The project is a Class II civil building, with a seismic fortification degree of 6, a design service life of 50 years, a roof waterproof grade of 3, and a waterproof durability of 10 years, The fire resistance rating is Level 2. 1.6. Project construction overview The total investment of the project is estimated to be about 6 million yuan, the planned construction period is 365 days, and the project quality level is targeted as a municipal high-quality project.
  • [Jiangsu] On site supervision scheme of residential engineering (frame shear wall structure)
    This data is the on-site supervision scheme (frame shear wall structure) of [Jiangsu] residential project, including project overview, II. Procedures and methods of on-site supervision based on on-site supervision personnel and responsibilities, etc. The content is detailed and the design is accurate, which can be downloaded for reference by netizens.
  • Supervision Outline of Brick concrete Structure Residential Area Project
    Scope of on-site supervision: take full responsibility for quality supervision, progress control, information management, organization and coordination, archives management, safe production and civilized construction management in the construction stage, assist the client in reviewing project budget and settlement, completed quantities and contract management.
  • Supervision of brick concrete and frame shear structure residential complex project plan (21 buildings)
    (2) Project overview and characteristics This project is funded by Yanhua Company, including 17 multi-storey residential buildings. 3 high-rise residential buildings. The building area is about 114000 square meters. The structural form is multi-storey brick concrete structure, and the high-rise is frame shear wall structure. The construction of the community includes municipal supporting works in the area, road works of No. 5 Road, No. 3 Road and the west section of No. 1 Road outside the community, and water, heating, gas, communication, television, security road management facilities, green landscape pavement, etc. within the scope of each road section. At present, the drawing design has been completed and the site is ready for commencement. The residential buildings in this project are all oriented to the south and north, which is conducive to lighting and ventilation. The space between buildings is large, and the distance between buildings is 30 meters to 40 meters, increasing privacy. The road network of the community is smooth, high in the west and low in the east, with a large green area. Parking spaces are concentrated around the community. The environment in the community is elegant and suitable for living. The project will be started in three times, and the planned duration of the ongoing multi-storey residential construction project is 210 days. For multi-storey residential buildings that need to be affected by relocation, the construction period is planned to be 210 days after relocation. Multi storey residential project, with a planned construction period of 540 days. The planned construction period of supporting public buildings, municipal works, roads, green landscapes, etc. is 90 days. The estimated construction period shall be about one and a half years, and the commencement date shall be subject to Party A's notice.
  • General Supervision Outline of Jiangsu Housing Engineering
    (2) Project characteristics 1. The single building and middle building of the project are frame shear wall structures. In the construction organization design, attention shall be paid to the reasonable division of flow sections (buildings), and the reasonable arrangement of working space for crossing, so as to save costs, improve work efficiency and shorten the construction period. 2. In case of winter and rainy season during the construction of the project, corresponding protective measures shall be taken during the construction. 3. Attention shall be paid to the accuracy of positioning and setting out. The right of way and the relative position between buildings shall be accurate. 4. The projects requiring site supervision include pile foundation works, earthwork backfilling, concrete pouring of beam column joints, waterproofing, sample room (section), etc.
  • General Supervision Outline of Jiangsu Housing Engineering_
    1. Project name: 2. Construction unit: 3. Design unit: 4. Construction site: 5. Project scale: 6. Total cost: 7. Quality objective: 8. Investment objective: 9. Construction period objective: (II). Project characteristics: 1. The single building and the middle building of the project are frame shear wall structures. In the construction organization design, attention should be paid to the reasonable division of flow sections (buildings) and the reasonable arrangement of working space in a cross way to save costs, improve work efficiency and shorten the construction period. 2. In case of winter and rainy season during the construction of the project, corresponding protective measures shall be taken during the construction. 3. Attention shall be paid to the accuracy of positioning and setting out. The right of way and the relative position between buildings shall be accurate. 4. The projects requiring site supervision include pile foundation works, earthwork backfilling, concrete pouring of beam column joints, waterproofing, sample room (section), etc.
  • Project supervision of a brick concrete structure student apartment building plan
    1.1. Project characteristics: brick concrete structure, main six floors 1.1.1 Project name: 1.1.2 Project construction site: 1.1.3 Project construction scale: 19313.73 square meters 1.1.4 Main characteristics, key points Difficulty 1.2 List of units related to the construction and implementation of the project Owner: Designer: Supervisor: Construction unit: 1.3 Project overview
  • Supervision of an artificial island project in Jiangsu plan
    1. Project name: Nantong Port * * Port Area Artificial Island Project; 2. Project location: Nantong Port * * Port Area Artificial Island Project is located in Nantong City, Jiangsu Province, about 32km away from Small * * Port in the west. 3 Project scale: Nantong Port * * Port Area Artificial Island Project (RGDJL-1 contract section) is divided into three areas according to the use function, of which the reclamation area of Area I (LNG receiving station area) is 299660 m2, and the reclamation area of Area II (oil products and chemicals area) is 326600 m2, The enclosed area of Area III (ore and coal area) is 806700 m2 (including 226340 m2 of the area of the early backfill area of Area II and Area III); The plane shape of the artificial island is rounded rectangle. The total length of the island wall structure is 4688.458m, and the total length of the internal partition dike is 3477.094m. The island wall in Zone I of the artificial island is arranged with the drainage outlet of the LNG receiving station, the route of the LNG pipeline and the connecting channel between the LNG trestle and the artificial island. The island wall in the west of Zone II and Zone III of the artificial island is connected with the island approach bank of the land island channel. The island wall in the south of Zone III of the artificial island is connected with the trestle of the workboat wharf and is arranged with a connecting channel.
  • Project supervision of a comprehensive building in Jiangsu Province plan
    The third phase project of ×××××× Plant ××× Building is located in ×××× Plant, * * Town, * * City. The east side is adjacent to the second phase of ××× Building. It is composed of production workshop and comprehensive office. The two parts are connected in the form of expansion joint. The total construction area of the project is 7427 square meters, and the plane is rectangular. The workshop part has four floors, and the comprehensive building part has five floors and six floors. ± 0.000 is the same as the second phase ± 0.000. In this phase, the total length of the project building is 49.66 meters, and the total width is 37.12 meters. The floor height of some workshops is 5.1 meters at the ground floor, and 4.2 meters at the second, third, and fourth floors; The storey height of some buildings in the complex building is 4.2 meters from the first floor to the fourth floor, 4.5 meters from the fifth floor, and 3.3 meters from the sixth floor.
  • Project supervision of an office building in Wuxi, Jiangsu plan
    1. Project name: XX Industrial Comprehensive R&D Building 2. Construction unit: Wuxi XX Industrial Co., Ltd. 3. Design unit: Nanjing Dujian Architectural Design Firm 4. Construction unit: Wujin Construction Engineering Installation Co., Ltd. 5. Construction site: south of Jianzhu Road, west of Hongqiao Road, Wuxi City, Liyuan Economic Development Zone 6. Total land area: 2354 ㎡ 7 Total building area: 41135 ㎡, including 4826 ㎡ underground and 36309 ㎡ overground
  • Jiangsu Shangjing Garden Project Safety Supervision plan
    According to the regulations of project supervision specifications, the requirements of the entrusted supervision contract and relevant specifications, regulations, design drawings, data, etc., in combination with the actual situation of the supervision project, the project supervision team has organized the preparation of the safety supervision plan for the supervision project of Lot I and Lot II of Sudi 2012-G-49 (Shangjing Huayuan), which is now submitted to the construction unit and the chief engineer's office of our company for review.
  • Project supervision of a commercial building in Jiangsu plan
    This material is a project supervision plan for a commercial building in Jiangsu Province. This material is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Project supervision of a residential quarter in Nantong City, Jiangsu Province plan
    The 4 #, 5 #, 6 #, 12 # and 13 # buildings of the project are connected to the garage on the ground with six floors. The building area is 26719.7 ㎡, the total building height is 17.2 ㎡, and the design seismic fortification intensity is 6 degrees. The safety level of the structure is Level II, the reasonable service life is 50 years, and the fire resistance rating is Level 2. The foundation is a composite reinforced foundation with powder jet grouting piles. The characteristic value of the bearing capacity of the composite foundation is fsp · k=120kpa. The independent strip foundation is adopted for the foundation, and the structure is brick concrete structure. The structural concrete of the foundation part is C25 for the foundation beam and bottom plate, and C20 for the structural concrete column beam, slab and stairs above ± 0.000. For brick masonry works below ± 0.00, MU15 85 clay solid bricks and M10 cement mortar are used for masonry, and MU10 85 clay porous bricks and M10 mixed mortar are used for masonry from ± 0.00 to 5.17M. Above 5.17M, MU10 85 clay perforated brick is used, M7.5 mixed mortar masonry, the roof is made of 110 diameter wooden sandalwood strips, 40 diameter wooden rafters, and a layer of fiberboard is paved on the roof, the ridge is dry paved with a layer of asphalt felt, the lap is > 100, 25 × 25 hanging tile strips, 10 × 30 along the water ceramic colored tile roof, and the external walls are made of ZL adhesive polyphenyl particles external moisturizing system, 25 thick in the north direction, 20 thick in the other directions, and the surface is painted with latex paint, of which ± 0.00 to 1.9M is coffee color, The color from 1.9M to 10.8M is line coffee color, the color above 10.8M is line cream color, and the interior wall is painted with mixed mortar. The cement mortar in kitchen and bathroom is painted with reference to SuJ01-2005-4/5, SuJ01-2005-5/5, the surface layer is white latex paint, the ground is painted with reference to SuJ01-2005-4/3, the ceiling is painted with reference to SuJ01-2005-5/8, and the surface layer is white latex paint.
  • [Jiangsu] High end Housing Project Supervision Outline and plan (Page 228)
    The total construction area of the South 4-2 Plot Project of the Sports Convention and Exhibition Center of xxxxxx Real Estate Co., Ltd. is about 150000 square meters (including 105000 square meters above the ground and 44000 square meters below the ground). The project requires that the quality standards strictly control the construction quality, leaving no hidden dangers, and striving for high-quality projects. The construction period is required to start on April 30, 2013 and complete before July 30, 2015.
  • Construction Supervision of Frame Structure Clubhouse and Brick concrete Structure Multi storey Residence plan
    Project name: project location, project environment and geological conditions Project location: project environment: Phase I project, Wangting Hexi Road in the east, Yuting Park in the north, with beautiful greening and small bridges running water; The construction water and electricity in the site area shall be provided by the Owner. The site shall be flat, the road shall be unblocked, and the materials shall be easy to enter and exit the site. Geological conditions: the site of the project is classified as Class III, the foundation is natural foundation, the foundation bearing layer is divided into clay layer, the design grade of building foundation is Class C, and the safety grade of building structure is Class II.
  • [Chongqing] Safety supervision of shear frame structure residential project plan
    1. The project is located at XX Avenue, XX District, XX City. It is invested and built by XX Ju (XX) Real Estate Co., Ltd. 2. The building is a shear frame structure of 9 residential buildings and garage projects. The design seismic fortification intensity is 6 degrees, and the safety level of the building structure is Level II; The construction period is 1060 calendar days in total. The following links should be organized and implemented: (2) In addition to the duration and quality of the project, safe and civilized construction is also an important part of the project. During the construction process, various safety protection measures should be strengthened. At the same time, the beautification of the enclosure facilities, the slogan of civilized construction, the hanging of signs and other image work should be done well to create a good learning, work environment.
  • Supervision Outline of Brick concrete and Frame Structure Residential Engineering
    (3) . 3 Discipline of the supervising engineer: (3). 3.1 Do not disclose confidential project information to the third party; (3) . 3.2 It is not allowed to take a part-time job in any contracting or material and equipment supplier, nor to introduce or recommend building materials or equipment to the contractor; (3) . 3.3 It is not allowed to introduce or recommend the mode unit or subcontractor to the owner or general contractor; It is not allowed to eat, take, card or ask the construction unit; (3) . 3.4 Do not accept the Owner's additional allowance without authorization, and do not accept the Contractor's bonus, prize, gift money; (3) . 3.5 Do not participate in the tourism, vacation and entertainment activities organized by the construction unit; (3) . 3.6 Do not participate in equipment and building materials procurement activities organized by suppliers; (3) . 3.7 Do not play favoritism and protect any act or individual that affects the quality of supervision; (3) . 3.8 It is not allowed to undertake any business outside the scope of supervision project without permission; (3) . 4 Supervision work system and integrity and self-discipline measures: (3). 4.1 Select high-quality technicians to join the supervision team; (3) 4.2 Improve various management systems; (3) Organize irregular learning of relevant national laws and regulations. (3) . 4.4 Publicly report complaints and strengthen social supervision of supervisors' behaviors; (3) . 4.5 Regular and irregular patrol system, evaluate the behavior of supervisors from various aspects (3). 4.6 Implement the economic punishment system, and punish the supervisors who violate the company's regulations on integrity and self-discipline management according to the seriousness of the circumstances. If the circumstances are relatively minor, they will be given disciplinary actions such as warning, fine, salary deduction, notice of criticism, etc. If the circumstances are serious, they will be suspended, dismissed, and sent to the superior competent department for handling; Management of the Project Supervision Department: (3). 4.7 Implement the director responsibility system, and the Chief Supervision Engineer is responsible for the implementation of the integrity and self-discipline work of the Project Supervision Department; (3) . 4.8 Regularly organize project supervisors to study relevant laws, regulations and superior documents, self check and self correct bad behaviors in supervision work, criticize and educate supervisors who have bad behaviors, and submit serious cases to the company leaders for handling; (3) . 4.9 Members of the Project Supervision Department shall sign the Integrity and Self discipline Convention and publicize it to all parties involved in the construction; Self discipline of supervisors: (3). 4.10 Insist on honest work, consciously resist corruption, and shall not accept any form of remuneration from the supervised party; (3) 4.11 The supervision personnel shall not collude with the Employer or the Contractor, material and equipment suppliers to practice fraud and reduce the project quality. It is not allowed to sign unqualified construction projects, construction materials and equipment as qualified. (3) 4.12 It is not allowed to designate contractors, building components, equipment, material suppliers and construction methods for the supervised project. (3) 4.13 It is not allowed to disclose the items that all parties of the supervised project think need to be kept confidential. (3) . 4.14 Work shall be carried out independently and in accordance with the law.
  • Supervision of a residential quarter in Suzhou, Jiangsu plan
    Project name: Suzhou * * * Phase V Project Scale: The total construction area of Phase V project is about 75000 square meters. Among them, seven six storey, seven eleven storey and one fifteen storey residential buildings and a man defense garage are composed. The foundation garage and the small high-rise building adopt raft foundation, the multi-storey building is an independent foundation under the column, and the main body is a special-shaped column frame structure. Planned commencement date and construction period: it is planned to start on November 1, 2007, with a total construction period of 400 days. Quality objective: qualified
  • Supervision of a residential project in Qingdao plan
    Project name: Qingdao * * Residential Project Location: Qingdao * * Road Construction unit: Qingdao * * Real Estate Co., Ltd. Project scale: about 25000 square meters Estimated cost: 17 million yuan Building grade: secondary structure form: brick concrete foundation form: rubble concrete strip foundation Quality objective: qualified Construction period: August 16, 2007 to June 12, 2008
  • Supervision of a residential project in Xi'an plan
    Project name: Xi'an * * Village Project location: Xi'an * * Road Project overview: Xi'an * * Village is located at the intersection of * * Road and * * Road in Xi'an, with a construction area of 31839.8 square meters, including 14 unit buildings of brick concrete structure.
  • Supervision of a residential project in Guangdong Province plan
    The project name is * * Phase I Sun City, located in * *. The total construction area of the project is about 810000 ㎡. The geology of the project site is good, and the foundation form is pile foundation or natural foundation independent foundation; The main structure is a concrete frame structure, and the seismic fortification degree is 6 according to different use functions; The beam slab structure of this project is relatively complex, and there are many house types. This phase involves more than ten house types.
  • Supervision of a residential project in Hebi, Henan plan
    This project is the # building of * * Garden Food Street in Hebi City, and the construction unit is Zhengzhou * * * Real Estate Development Company. The construction site is Liyang Road, Junxian County, Hebi City, with a floor area of square meters. Our company takes the concept of "quality is like life, and must produce high-quality products" as an enterprise, highlights the service, impartiality, independence and scientificity of supervision, strictly follows the principles of "law-abiding, integrity, fairness and science", strictly implements national and local construction laws and regulations, and strictly abides by the professional ethics of supervision personnel, Safeguard the legitimate rights and interests of the construction unit and the construction unit according to law, coordinate and handle the working relationship of all parties involved in the project construction, and maintain the image of the supervision industry.
  • [Guangdong] Housing engineering safety supervision plan
    Jinghu Times Garden is located at the intersection of Xiping Fourth Ring Road and Hongwei Road in Nancheng. It faces Jinghu Chunxiao in the east, Green Town in the west, the Fourth Ring Road in the north and the future world in the south. The total floor area is 146769 ㎡, the total building area is 452482 ㎡, and the building area with capacity is 272963.6 ㎡. The project consists of 17 commercial and residential buildings, 6 street shops and 4 sections of basements, and will be started in two phases. The project has two floors of basement, which is an underground garage and equipment room. Prestressed high-strength concrete (PHC) pipe piles are used for pile foundation construction.
  • [Guangdong] Housing project supervision plan model
    1) Engineering environment; Overview of stratum soil quality; Groundwater overview; Physical and mechanical indexes, standard value of bearing capacity and compression modulus of soil layer; Evaluation of seismic conditions of site and foundation, conclusions of engineering geological investigation and suggestions for foundation and foundation design; Suggestions on foundation pit excavation and foundation reinforcement.) 3) Architectural design (name and use function of each building; plane layout; ground floor area; building area; number of underground floors (whether there is civil air defense, civil air defense level, purpose); Number of floors above ground; Eaves height; Floor height; Elevator setting; Fire resistance rating of buildings; Indoor floor ± 0. 00 equivalent absolute elevation; Indoor and outdoor height difference; Door and window form; Roof practice; Waterproofing practices of toilets and bathrooms, etc.) 4) Structural design (foundation form, burial depth; category of bearing soil (rock) layer and standard value of bearing capacity; Form and requirements of foundation pit support or foundation treatment; Main structure form; Seismic fortification intensity and seismic grade of components; Balcony and staircase structure; Concrete strength grade and impermeability grade of each part; Rebar type and grade; Masonry type and strength grade, masonry mortar strength grade; Floor and roof slab form; Description of long-span components, etc.)
  • Supervision of a residential project in Country Garden plan
    The supervision planning of a residential project in Country Garden has detailed contents for reference.
  • Supervision of a garden residential project in Ningbo plan
    This material is the supervision planning of a garden residential project in Ningbo. This material is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Engineering supervision of a low rise residential building plan
    This material is the supervision planning of a low rise residential building project, which is very valuable for reference. It is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • [Jiangsu] Residential Area Project Supervision plan (including basement)
    2. Project name: "XX Garden" underground garage and building 23 #, 24 # and 25 # 3. Project location: the original XX Experimental School 4. Project scale: about 20074m2 5. Total project investment: about 25.89 million yuan 6. Designer: Jiangsu XX Architectural Design Institute Co., Ltd. 7. Supervisor: XX Construction Engineering Supervision Co., Ltd. 8. Contractor: Tongzhou XX Group Co., Ltd
  • On site supervision scheme of a residential project in Jiangsu Province
    2. Structure abstract 2.1 Brick concrete structure (residential) foundation: C25 foundation cushion cap, C20/C30 foundation column and ring beam, M10 cement mortar brick foundation. Main body: C30 garage structure layer, five layers of C20 reinforced concrete structure, M7.5/M5 mixed mortar clay hollow brick. 2.2 Frame structure (business room) foundation: C25 foundation reinforced concrete structure, M10 cement mortar standard brick foundation. Main body: C30 reinforced frame structure, M5.0 mixed mortar masonry clay perforated brick filled wall.
  • [Jiangsu] Scaffolding construction scheme of brick concrete structure residential project
    The residential phase II project is located at the southeast corner of Zizhu Bridge, in the courtyard of Beijing No. 6 Brewing Factory on the south side of Shuangzi Branch Canal. The C1 and C2 buildings of the project are high-rise residential buildings, and ± 0.000 is equivalent to the absolute elevation of 51.950m. There are two floors underground, 18 floors above the ground and 14.5 floors above the ground, and some are thermocline. The structural form is frame shear wall structure. The top elevation of the parapet of the main building is 51.400m. The second underground floor is equipped with civil air defense. The civil air defense level is Level 6. The foundation form is raft foundation. A deformation joint is set between C1 and C2 floors. The seismic rating of this tower is Level II. Building E is a six storey residential building. The first underground floor is a civil air defense floor, plus an equipment floor. There are six floors above the ground. The structural form is brick concrete structure. The top elevation of the parapet is 18.600m. The civil air defense level is five. The foundation form is raft foundation.
  • Supervision of a dn800 spherical pipe water supply project in jiangsu province plan
    Name of construction contracting project: Nanjing * * Avenue DN800 spherical pipe water supply project. Estimated total project investment: 18 million yuan. Planned duration of the project: subject to the construction contract. Project quality grade: qualified project. Construction unit: Nanjing Municipal Waterworks Corporation. 8. Name of project design unit and construction contractor:
  • Supervision of a port wharf project in Jiangsu Province plan
    **The chemical wharf project is a special chemical wharf invested by * * Petrochemical Co., Ltd. and built at 400M upstream of * * * Port on the north bank of the Yangtze River in * * City, Jiangsu Province. The project scale is designed to have an annual throughput of 890000 tons and a berthing capacity of 30000 tons. The wharf hydraulic structure adopts overhead high pile beam plate structure, which is composed of four parts: wharf working platform, approach bridge, mooring pier and complex building.
  • Project supervision of a kindergarten in Jiangsu Province plan
    1. Project name: * * Development Zone * * Kindergarten 2. Construction unit: * * City * * Central Primary School 3. Design unit: * * Construction Group Co., Ltd. 4. Construction unit: * * City * * Construction Co., Ltd. Jiangsu Foundation Engineering Co., Ltd. (subcontractor) 5. Construction site: Caoxin Road, * * Development Zone, * * City 6. Total building area: 6472 square meters 7. Number of buildings and floors: one building, four floors 9 Structure type: frame 10. Total planned project investment: 15.65 million None
  • [Jiangsu] Supervision of living landscape road works plan
    The fifth phase road project of Hebin Avenue is a branch road of life and landscape, starting from Gutang Bridge in the west and ending at the bottom of Liuhe Bridge in the east, with a length of 430.866 meters and a width of 15 meters. The south side of the road is the residential area to be built. The west side of the road, the starting point, is connected with the Phase IV road project of Hebin Avenue, and ends at the bottom of Liuhe Bridge in the east. There are many transmission lines and communication lines along the road.
  • [Jiangsu] Park Sewage Pipe Network Project Supervision plan
    1. Project name: sewage pipe network in XX Park 4. Project scale: DN400, DN500, DN800; the total length of the pipe network is 4.2 kilometers; 5. Project investment: about 7 million yuan, the total length of the pipe network is 4.2 kilometers, the per capita comprehensive domestic water consumption is 240 L/person. d, and the average water consumption of industrial land is 5000 m3/K ㎡. d; The daily variation coefficient is 1.3. Design fullness: DN400 pipe h/d ≤ 0.65; DN500 and DN800 pipes h/d ≤ 0.7 Design flow rate: V ≥ 0.6m/s. The sewage interception rate is 95%, and the sewage discharge coefficient is 0.85 The design of the vertical section shall meet the requirements of ≥ 0.7m for the top covering soil, and at the same time, it shall meet the requirements of sewage access on both sides of the road within the service scope. The longitudinal slope of the drainage pipe shall be the minimum slope under the control of no silting flow rate under the condition of ≥ minimum fullness. On the premise of meeting the water volume, the slope shall be as small as possible to reduce the buried depth of the pipeline and reduce the project cost. Glass sand pipe is used as the pipe material, and sand cushion is used as the cushion. DN400 and DN600 manholes use Φ 1000 round brick sewage manholes, DN800 manholes use Φ 1250 round brick sewage manholes, manholes W18, W31, W39, W43, W53, W65 and W74 use brick manholes with gate slots, and manholes in front of 7 #, 8 # and 9 # sewage outlets use 500 × 500 floor manholes.
  • Safety Supervision of Jiangsu Shangjing Garden Project plan
    According to the regulations of project supervision specifications, the requirements of the entrusted supervision contract and relevant specifications, regulations, design drawings, data, etc., in combination with the actual situation of the supervision project, the project supervision team has organized the preparation of the safety supervision plan for the supervision project of Lot I and Lot II of Sudi 2012-G-49 (Shangjing Huayuan), which is now submitted to the construction unit and the chief engineer's office of our company for review.
  • Supervision of a brick concrete structure student apartment in Hunan plan
    Project name: Building 1, Student Apartment, XX College, XX University Construction unit: XX University Supervision unit: Hunan XX Construction Engineering Supervision Consulting Co., Ltd. Planned commencement (completion) date of the project: February 25, 2009 August 16, 2009 The project is a five storey brick concrete structure, with brick and stone strip foundation and independent column foundation as the foundation, and reinforced concrete pitched roof tile as the roof, The cornice height is 16.5m, and the local height is 19.6m, covering an area of 1019.2 square meters, and the building area is 4908.34 square meters. The seismic fortification intensity is 6 degrees, it is a multi-storey apartment, the fire resistance rating is Level II, and the design service life is 50 years.
  • Detailed Rules for the Implementation of Construction Supervision of Residential Quarters (brick concrete structure)
    1.1 Project address: 1.2 Project composition and scale of XX Village, XX County 3 # and 4 # buildings of XX Residential Community, XX County, with a building area of 6924 square meters, are six storey brick concrete structures. The residential building has three units, one elevator, two households, three rooms, two halls, one kitchen and one bathroom. The standard floor height is 3.0 meters, the top floor height is 3.3 meters, the building height is 20.7 meters, and the indoor and outdoor height difference is -0.990. The seismic fortification intensity is 6 degrees. Exterior wall finish: cement mortar plastering, brushing acrylic exterior wall paint. Interior wall finish: 200 × 300 porcelain chips are used for bathroom and kitchen, and latex paint is used for other walls. Floor: ceramic floor tiles are used in toilets and kitchens. The floor of other buildings is rough, and the floor of stairs is cement calendered. Top surface: cement mortar plastering, emulsion paint coating. Roof: all are inaccessible roofs. Reinforced concrete base slope roof.
  • Summary of supervision work of brick concrete structure multi-storey residential building project
    This project is a multi-storey residential building of brick concrete structure, located 20 meters west of the southwest corner of the intersection of Zhongjing Road and Tianshan Road. It has one floor underground and six floors above the ground, with a total building area of 15905 square meters. The foundation is strip foundation, and the base elevation is -4.00m; The reasonable service life is 50 years; Seismic intensity is 7