Uploaded on: 2018-05-19 09:34:54 come from: Architectural design / Residential building / Residential quarters
zero
4 points

1) Engineering environment; Overview of stratum soil quality; Groundwater overview; Physical and mechanical indexes, standard value of bearing capacity and compression modulus of soil layer; Evaluation of seismic conditions of site and foundation, conclusions of engineering geological investigation and suggestions for foundation and foundation design; Suggestions on foundation pit excavation and foundation reinforcement.) 3) Architectural design (name and use function of each building; plane layout; ground floor area; building area; number of underground floors (whether there is civil air defense, civil air defense level, purpose); Number of floors above ground; Eaves height; Floor height; Elevator setting; Fire resistance rating of buildings; Indoor floor ± 0. 00 equivalent absolute elevation; Indoor and outdoor height difference; Door and window form; Roof practice; Waterproofing practices of toilets and bathrooms, etc.) 4) Structural design (foundation form, burial depth; category of bearing soil (rock) layer and standard value of bearing capacity; Form and requirements of foundation pit support or foundation treatment; Main structure form; Seismic fortification intensity and seismic grade of components; Balcony and staircase structure; Concrete strength grade and impermeability grade of each part; Rebar type and grade; Masonry type and strength grade, masonry mortar strength grade; Floor and roof slab form; Description of long-span components, etc.)

 [Guangdong] Housing Project Supervision Planning Model - Figure 1

[Guangdong] Housing Project Supervision Planning Model - Figure 1

 [Guangdong] Housing Project Supervision Planning Model - Figure 2

[Guangdong] Housing Project Supervision Planning Model - Figure 2

 [Guangdong] Housing Project Supervision Planning Model - Figure 3

[Guangdong] Housing Project Supervision Planning Model - Figure 3

 [Guangdong] Housing Project Supervision Planning Model - Figure 4

[Guangdong] Housing Engineering Supervision Planning Model - Figure 4

 [Guangdong] Housing Project Supervision Planning Model - Figure 5

[Guangdong] Housing Project Supervision Planning Model - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

  • Supervision Planning of a Communication Project in Guangdong Province
    The supervision area of our company for XX project is XX area, with XX stations in total,. Planned commencement date: XX, 200X Planned completion date: XX, 200X.
  • [Guangdong] Supervision Planning of High rise Comprehensive Housing Project (including shopping malls)
    The total floor area of the project is 4040.4 square meters, the total building area is 21127.26 square meters, the building height is 80.950m, and the total number of households is 252, all less than 90 square meters. The project is a class I high-rise building with a seismic fortification intensity of 7 degrees, a fire resistance rating of 1, a resistance rating of 6 and a chemical resistance rating of C. The design service life is 50 years. The main building is a 24 storey high-rise building, of which the first and second floors are commercial, the third floor is overhead, and the other floors are residential. There is a basement in the site. The basement serves as a Class VI Grade A civil air defense area in some wartime areas, and is usually used as a garage and equipment room. The contract duration is 730 days, and the construction is planned to be divided into two stages. The first stage is the basement, building 1, building 2, building 5 and kindergarten. Building 3 and building 4 are the construction contents of the second stage. The division point of the two stages is when building 5 is capped. The project is planned to start on June 10, 2007 and be completed on June 9, 2009.
  • Supervision Outline of High rise Residential Engineering( model
    1.2 Scope of supervision work The supervision work includes the whole process supervision of construction and installation works and warranty stage. 1.3 Supervision work content 1.3.1 Construction preparation stage: 1. Assist in arranging the survey of land boundary and the establishment of leveling coordinates; 2. Assist in contacting and supervising the construction of temporary water, electricity, telephone and other public facilities; 3. Supervise daily construction safety and implement safety rules; 4. Assist in reviewing construction drawings; 5. Assist in the bidding of the main body and decoration works. 1.3.2 Construction stage: 1. Organize relevant units to review the construction drawings before the commencement of each project; 2. Examine and approve the construction organization design and schedule of the construction unit; 3. Carry out daily quality supervision to ensure that the project is constructed according to the construction drawings and construction specifications; 4. Inspect the quality of materials, products and equipment provided by the construction unit according to the bidding documents, construction contracts and relevant national specifications, check their quality and source certificates, and supervise the test of materials used in the project; 5. Contact with the quality inspection station to jointly supervise the project; 6. Coordinate the work of the on-site construction unit to ensure that there is no conflict between their work; 7. Monitor the construction progress and review the construction progress report; 8. Coordinate the supply and connection of utilities; 9. In case of special accident, submit special project report to the Tenderee; 10. Check and find out the errors and omissions of the construction drawings, the unclear marks of the drawings and the inconsistency with the site environment and other problems affecting the construction as soon as possible, notify the owner or his representative and the design unit in a timely manner, study the modification methods, and negotiate the modification notice; Examine and approve the increased or decreased quantities and budget; 11. Submit reports to assist the Owner in handling relevant "claims" (including costs and construction period); 12. Verify the payment notice submitted by the construction unit according to the construction progress, and sign the payment proposal report for the reference of the owner or the owner's representative; 13. Assist in obtaining construction application procedures related to construction; 14. Urge the construction unit to keep a record of personnel attendance, weather, works completed on that day, and materials and equipment shipped on that day every day; 15. Regularly organize engineering technical disclosure meetings and submit relevant engineering reports on time, including construction photos; 16. To supervise the implementation of safety measures by the construction company, a supervision engineer shall be responsible for safety inspection and serve as the safety officer. 1.3.3 Acceptance stage: 1. Assist the Tenderee to organize relevant units to accept the divisional, sub divisional and the whole project, and evaluate the project quality grade; 2. Make a defect list and urge the construction unit to rectify; 3. Urge and arrange various acceptance tests, and supervise and witness on site; 4. Urge and inspect the as built drawings and maintenance manuals submitted by the construction unit; 5. Assist in verifying the quantities and handling the project completion settlement. 1.3.4 Warranty period stage: 1. Check the project quality, identify the quality responsibility, and supervise the project warranty; 2. Implement the relevant warranty clauses in the national regulations on construction project quality management during the project warranty period. 1.4 Supervision objectives
  • Supervision Outline of Residential Area Project( model )_
    Project name: xx housing construction project and outdoor project in xx community Construction site: x x Project scale: about 113213 square meters Total investment: about 104 million yuan, final audit settlement shall prevail Project duration: 500 days This project is divided into two sections, the first section: 1-30 # buildings, underground garage and outdoor works.
  • [Guangdong] Detailed Rules for Supervision of Factory Residential Building Project
    Chapter III Content of quality control 1. Urge the contractor to establish a quality assurance system for the project. The contractor is the specific implementer of the project. Before the project starts, the contractor is required to establish a quality assurance system according to the project characteristics and quality requirements, with clear quality management objectives and responsibilities, as well as perfect quality management procedures and methods. 2. In order to master the project situation and achieve good supervision effect, the supervisors should be fully familiar with the drawings, review the construction drawings, and timely suggest to the design unit if problems are found. At the same time, participate in the design technical disclosure and drawing review meeting. 3. In the preparation stage before construction, the quality control of each process type of work shall be done in advance, and the cooperation of each process type of work and the corresponding technical measures shall be checked. 4. Review the construction organization design and technical measures prepared by the contractor, and select the best construction scheme. 5. Urge the contractor to implement the quality requirements and design technical requirements, participate in the technical disclosure meeting of subdivisional works, and recheck the control piles and benchmarks. 6. Check and accept the quality of the ordered equipment, materials, finished products and semi-finished products in strict accordance with the standards. It is strictly prohibited to use materials without certificates or unqualified in retest for the project. 7. Strengthen process control, focus on monitoring key processes at key parts, and conduct intermediate inspection and technical review. 8. Urge and inspect the contractor to carry out construction in strict accordance with construction specifications, acceptance standards and design drawings. 9. Timely inspect and accept the sub divisional distributed works, and sign the items that meet the standards. The unqualified items will be ordered to the contractor to rework until they are qualified. If necessary, a stop work order will be issued. 10. Check the work permits of special operators and highly skilled shift leaders of the construction unit, and even conduct spot check and assessment according to the specifications and operating procedures.
  • Brief report on supervision, inspection and patrol of a residential project in Guangdong
    1、 Inspection contents: 1. Implementation of dynamic management on safety, quality and progress of the project site and management of regular projects; 2. Control of documents and data related to safety, quality and progress of the Project Supervision Department Recheck and patrol inspection method: Recheck: check the existing problems according to the last single building number and position; Patrol inspection: random on-site inspection of safe and civilized construction hardware management is adopted to check the implementation of project safety supervision rules and review the safety supervision data structure roughly. 4、 Review contents: (I) Safety problems: 1. Outer frame: A. The outer frame rack body shakes, the corner of the frame body is not provided with reinforced diagonal bracing, and it should be effectively connected with structural members by rigid bracing, and the diagonal bracing outside the frame body is not set in place; B、 Due to the structural change of some frames from double row to single row or the distance between the double row and the building increases, no treatment and reinforcement measures were taken in the scheme, and no measures such as adding upright poles, strengthening connections, and adding cross bridging were taken on site; C、 The fasteners of the steel pipe scaffold are not provided with anti-corrosion measures, and the fasteners of the scaffold body are rusted, with potential safety hazards; D、 Detailed management: the erection of poles, large (small) cross bars, cross braces and connection facilities in the external scaffolding was improperly operated, the steel pipe joints and connections were unreasonable, some parts should be strengthened without double fasteners, additional braces and other measures, the corners of the flat bridge were not paved, and the bamboo diameter was less than 5cm. Recheck conclusion: the external frame is rectified, and the problems mentioned last time still exist. 2. Vertical transportation of construction machinery: A. Lightning protection measures are not taken on the top of the derrick equipment in time; B、 The elevation safety protection around the derrick hoistway is not timely synchronized with the floor to prevent falling objects from hitting; C、 Other construction machinery (carpentry) has no protective cover, the operating platform is too short, no push tools and other safety details will not be repeated. Review conclusion: lightning protection, elevation protection and safety door setting of derrick have been improved significantly, and woodworking machinery problems still exist.
  • Engineering supervision planning of steel structure industrial plant( model
    1. Total building area: 18000 square meters (Phase I project) 2. Structure type: steel structure factory 3. Construction period: construction contract signing goal 4. Quality goal: construction contract signing goal
  • Compilation of supervision planning for a housing construction project model
    The engineering construction supervision planning is an important document that specifically guides the project supervision team to implement the engineering construction supervision work, and is the basis for the supervision engineers of all disciplines to prepare the construction supervision rules and carry out the construction supervision work. This regulation divides the project overview, supervision scope and content, supervision objectives, supervision basis, organization form of project supervision organization and job responsibilities of supervisors, working relationship between project supervision organization and participating units, supervision methods and measures, main work procedures of construction supervision, supervision work system, work rules of supervisors Supervision facilities and on-site safety and civilized construction supervision control. 1、 Project overview 1.1 Project name:; 1.2 Construction site: 1.3 Project type and characteristics:; 1.4 Project scale:; 1.5 Design unit:. 2、 The supervision work is based on 2.1 Relevant laws and administrative regulations issued by the state, the Code for Construction Project Supervision (GB50319-2000) and the laws, regulations and provisions of local competent construction departments on construction supervision; 2.2 Engineering construction contract and agreement signed by the Owner and the Contractor according to law; 2.3 Construction supervision entrustment contract (or agreement) signed by the owner and the supervision unit; 2.4 Project feasibility study report, project proposal, preliminary design and approval, budget estimate, construction plan, design and construction drawings (including revised drawings and design change notice), description, geological survey report and other relevant technical documents approved by relevant superior departments and competent construction departments; 2.5 Current national and local standards for quality inspection and assessment of construction and installation works, construction acceptance specifications and project quality inspection and assessment standards; 2.6 Current local budget quota, charging standard and relevant construction management methods; 2.7 Relevant technical documents and regulations formulated for the project.
  • Supervision planning of office building decoration works( model
    The office building reconstruction project (exterior decoration) mainly includes the replacement of aluminum alloy windows on the south facade; South facade dry hanging aluminum plastic plate; South facade plinth dry hanging mushroom stone; The steel structure frame is added on the awning of the south facade gate, and the aluminum plastic plate is hung outside, and the middle part is a glass curtain wall; Add neon lights on the south facade; Mirror granite sill plate is added to the south facade window.
  • Engineering construction supervision planning in construction stage( model )
    The construction party submits a written engineering change document to the supervising engineer for review, and the supervising engineer submits it to the owner. After the owner and the design unit approve it, the supervising engineer can sign the measurement table of the changed project as the basis for the owner to pay the cost of the changed project.
  • Project quality supervision planning model (Supervision planning)
    1. Operators who carry out the next process without supervision inspection. 2. Failure to take effective corrective measures after pointing out the decline of project quality, or taking corrective measures with poor effect. 3. Unauthorized use of engineering materials without approval. 4. Unauthorized change of design drawings. 5. Those who rush to construct without reliable quality assurance measures and have seen signs of quality decline.
  • Supervision planning of unit and single project model
    After the unit and single project are completed, the construction party shall submit the acceptance application form to the supervising engineer after self inspection is qualified, and the supervising engineer shall sign the intermediate acceptance opinions together with the site after acceptance.
  • Project supervision planning cases in 2017 model (Word)
    Job responsibilities of supervisors, work plan for safety production management, work plan for supervision of building energy conservation
  • Supervision planning of a residential project in Qingdao
    Project name: Qingdao * * Residential Project Location: Qingdao * * Road Construction unit: Qingdao * * Real Estate Co., Ltd. Project scale: about 25000 square meters Estimated cost: 17 million yuan Building grade: secondary structure form: brick concrete foundation form: rubble concrete strip foundation Quality objective: qualified Construction period: August 16, 2007 to June 12, 2008
  • Supervision planning of a residential project in Xi'an
    Project name: Xi'an * * Village Project location: Xi'an * * Road Project overview: Xi'an * * Village is located at the intersection of * * Road and * * Road in Xi'an, with a construction area of 31839.8 square meters, including 14 unit buildings of brick concrete structure.
  • Supervision planning of a residential project in Hebi, Henan
    This project is the # building of * * Garden Food Street in Hebi City, and the construction unit is Zhengzhou * * * Real Estate Development Company. The construction site is Liyang Road, Junxian County, Hebi City, with a floor area of square meters. Our company takes the concept of "quality is like life, and must produce high-quality products" as an enterprise, highlights the service, impartiality, independence and scientificity of supervision, strictly follows the principles of "law-abiding, integrity, fairness and science", strictly implements national and local construction laws and regulations, and strictly abides by the professional ethics of supervision personnel, Safeguard the legitimate rights and interests of the construction unit and the construction unit according to law, coordinate and handle the working relationship of all parties involved in the project construction, and maintain the image of the supervision industry.
  • Supervision planning of frame shear wall structure residential engineering
    1. Project name: Baocheng Jiulong Bay Project in Baohe District, Hefei 2. Construction site: the intersection of Baohe Avenue and Wei'er Road, Hefei 3. Construction unit: Anhui Huayang Real Estate Development Co., Ltd. 4. Design unit: CSCEC Shanghai Design and Research Institute Co., Ltd. 5. Supervision unit: Hefei Nanxun Construction Project Management Consulting Co., Ltd. 6 Construction unit: Fujian Wuhang Construction Engineering Co., Ltd. 7. Project scale: Phase II project with a building area of about 85000 m2 8. Structural system: frame shear wall structure
  • Supervision planning of a residential project in Country Garden
    The supervision planning of a residential project in Country Garden has detailed contents for reference.
  • Supervision planning of a low rise residential building project
    This material is the supervision planning of a low rise residential building project, which is very valuable for reference. It is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Supervision planning of a garden residential project in ningbo
    This material is the supervision planning of a garden residential project in Ningbo. This material is very valuable for reference, and is hereby shared for everyone to learn. The content is detailed and can be downloaded for reference.
  • Supervision Planning of a Factory Building Project in an Industrial Park in Guangdong Province
    **The comprehensive standard plant project of * * Science and Technology Industrial Park Development and Construction Co., Ltd. is located in the * * area of * * Science and Technology Development Zone, * * City, with a project cost of about 55.565 million yuan. The project is a comprehensive standard workshop with five floors of frame structure and a total building area of 57222.6 square meters. The building is classified as Class II, the seismic fortification category is Class C, and the seismic fortification intensity is Grade 6. The scope of supervision includes the construction, decoration, water supply and drainage, electrical, fire protection, etc. of the standard complex plant, which shall be subject to the construction drawings. The foundation is prestressed high-strength concrete pipe pile foundation, the main body is reinforced concrete frame structure, and the masonry is aerated concrete block.
  • Supervision planning preparation of a supervision company model
    1. Project name: ×× Project 2. Construction site: ×× Road, ×× City 3. Building area: ×× m2 4. Project structure type: ×× structure, foundation type, underground × floor, ground × floor 5. Total planned investment of the project: contract price × × 10000 yuan 6. Planned construction period of the project: contract duration × × calendar days, planned commencement date × × year × month × day (subject to the official commencement report), Completion date: (subject to the formal completion report) 7. Grade of project quality requirements: qualified or excellent 8. Main unit of the project: (1) Construction unit: ×× (2) Survey unit: ×× (3) Design unit: ×× (4) Construction unit: ×× (5) Supervision unit: Guangxi * * Engineering Construction Supervision Company II The scope of supervision work shall be subject to the scope entrusted by the Owner: 1. Supervision in the survey and design stages of the preliminary work (only if there is a commission, it shall not be written). 2. Supervision during construction and warranty period. 3、 Supervision work contents: 1. supervision work in construction preparation stage; 2. supervision work of quality control, investment control, progress control, contract information management and coordination of civil engineering (earthwork, pavement, bridge and culvert, if any), lightning protection, water and electricity installation, air conditioning, fire fighting, elevator, and intellectualization (note what is entrusted to the supervisor) in construction stage. 4、 Supervision objective 1. Satisfy the Owner with supervision services; 2. Strictly perform the requirements of the supervision contract and strive to achieve the quality objectives, progress objectives and investment objectives specified in the construction contract signed with the construction company (except for force majeure and other special reasons);
  • Supervision planning standard model (Word format)
    Location of the project area; Surrounding roads and surrounding units; Project floor area; Demolition of the site; Road, water, electricity, communication, etc. at the construction site; Environmental protection, especially the protective measures required for the impact on the surrounding residential buildings; Protection of underground and aboveground urban pipe networks and important landmarks; Impact of local meteorological conditions on project construction, etc. 2. Engineering geological and hydrological conditions: according to the engineering geological and hydrogeological survey report of the site, the site topography and geomorphology; Overview of stratum soil quality; Groundwater overview; Physical and mechanical indexes, standard value of bearing capacity and compression modulus of soil layer; Evaluation of seismic conditions of site and foundation, etc.
  • Supervision planning of frame structure housing project( model Flowchart)
    1.1 Project name: 1.2 Construction site of the project: 1.3 Name of the construction unit Construction unit Survey unit Design unit General contractor Sub contractor Quality supervision organization 1.4 List of basic information of the project Serial number Unit project name Building area (m2) Structure type Floor number Total height (m) Contract price (ten thousand yuan) Construction period (days) Project characteristics of underground and overground 1.5 of foundation main body 1.5.1 Project environment (brief description of regional location, surrounding roads and buildings, underground pipe network, project area, land acquisition, demolition, roads, water and electricity, communication, etc.). 1.5.2 Engineering geological and hydrological conditions (brief description of the site topography and landform given in the survey report). 1.5.3 Architectural design (briefly describe the use function and purpose of each building; plane layout; floor height; elevator setting; fire resistance rating; indoor and outdoor elevations; door and window forms, roof practices, basement, toilet, bathroom waterproofing, external wall insulation practices, etc.). 1.5.4 Structural design (briefly describe the foundation and burial depth; the category of bearing soil layer and the standard value of bearing capacity; the form of main structure; seismic fortification intensity and the seismic grade of components; balcony and staircase structure; floor and roof form; reinforcement grade; reinforced concrete or masonry type and strength grade; masonry mortar strength grade; description of long-span components, etc.). 1.5.5 Building decoration (including decoration practices of different parts of indoor and outdoor walls and indoor floors, plastering, suspended ceilings, doors and windows). 1.5.6 Building roof (including waterproof grade and base course, leveling layer, insulation layer, waterproof layer and detailed structure of roof). 1.5.7 Building water supply and drainage, electrical (including indoor water supply and drainage system, indoor hot water supply system, sanitary ware installation, heating boiler and auxiliary equipment installation; outdoor electrical, power transformation and distribution room, power supply trunk line, electrical power, electrical lighting installation, standby and uninterruptible power supply installation, lightning protection and grounding installation). 1.5.8 Intelligent buildings (including communication network system, office automation system, building equipment monitoring system, fire alarm and fire linkage system, security system, generic cabling system, intelligent integration system, power supply and grounding, environment, intelligent residential (community) system). 1.5.9 Ventilation and air conditioning (including air supply and exhaust system, smoke control and exhaust system, dust removal system, air conditioning system, purification air conditioning system, refrigeration equipment system, air conditioning water system, etc.). 1.5.10 Elevator (installation of selected elevator). 1.5.11 Outdoor works (including outdoor auxiliary buildings, roads, greening, architectural sketches, outdoor electrical, water supply and drainage, etc.). 2. The scope of supervision work shall be in accordance with the scope of supervision agreed in the Contract for Entrusted Supervision of Construction Projects of the Project, including: (referring to the scope of supervision agreed in the contract). 3. The supervision work shall be carried out in accordance with the supervision work scope agreed in the Construction Project Entrustment Supervision Contract. Specific contents: see 8. Contents, procedures, methods and measures of supervision work in the construction stage in this plan for details. 4. Project supervision objectives The project supervision objectives shall be consistent with the overall quality objectives of the company, and dynamic monitoring shall be carried out during the construction process. The project is subject to the quality, construction period and cost objectives determined in the contract signed between the construction unit and the contractor, and the requirements for safety supervision, implementation of national policies and regulations and customer satisfaction are specified
  • Supervision planning of an office building in Guangdong (civil engineering)
    Project name: Panyu District * * Power Supply Office Building Project Construction site: Panyu District * * Town Project Construction unit: Panyu District Power Supply Bureau * * Power Supply Station Estimated total project investment: about 5.5 million yuan Project planned duration: 210 calendar days Project quality objective: qualified
  • Supervision Outline of High rise Residential Engineering model ...
    First of all, thank you very much for your trust in our supervision company, so that our supervision company has the honor to participate in the supervision invitation bidding and tendering of this project. Although it is not public bidding, our company has prepared a set of systematic, complete and standardized supervision outline [technical scheme] bidding documents according to the usual practice of market competition mechanism, so that your company can be familiar with our overall supervision objectives, ideas and operation mode. If our supervision company wins the bid, our company will strictly abide by all the commitments of this supervision outline [Technical Scheme] tender, and under the support and leadership of the municipal competent construction department, the owner and relevant departments, we will send qualified personnel and strong generals to ensure the smooth implementation of the supervision task and the smooth implementation of [quality, investment, progress, safety] and other goals. The Owner's requirements for supervision According to the Owner's requirements for the project, the whole process of supervision will be carried out for the construction stage of the project. That is to supervise the quality, progress, investment and safety of the project comprehensively, and coordinate the disputes between the owner and the contractor in the construction process. Carry out effective supervision of the project in a fair, independent and scientific manner.
  • Supervision Outline of Residential Building Project model
    Construction unit: XX Planning and Construction Bureau Project name: Residential Community (Resettlement Housing for Farmers) Phase III Project (Lot I) Project location: XX High tech Zone Project duration: 360 days (subject to the construction contract duration) Project overview: 18 buildings in Lot I, 3 types of buildings, with a building area of 61102 ㎡, and the bidding control price of 36919299.47 yuan
  • Safety Supervision Planning of Henan Workshop Project model
    The first phase of the construction project of Henan Heavy Equipment Co., Ltd. includes: structural parts joint plant, hydraulic parts joint plant, electroplating plant, reducer joint plant, auxiliary plant and other auxiliary facilities. The Phase II project includes: assembly complex plant, forging workshop, shift dormitory, office building, complex building, marketing building and other facilities. The total construction area is 220000 square meters, covering 600 mu, and the total investment of the project is 1.877 billion yuan.
  • Construction engineering supervision planning model (40 pages in total)
    Double fork bridge project of infrastructure construction project of micro electric park in Bishan Industrial Park, which is located in micro electric park of Bishan Industrial Park; The total length of the project is 30.04m, the structural form is reinforced concrete, one span, the height of the main abutment is 11.25m, and the floor height: the length of the bridge slab is designed to be 19,96m, which is a prestressed post tensioned hollow beam slab.
  • Supervision planning of a construction project( model )(54 pages in total)
    The project is a comprehensive building with one floor above the ground, and the structural form is reinforced concrete frame structure. The building is 8m high. The indoor floor elevation is 0.300m higher than the outdoor floor elevation. ± 0.000 is the indoor floor elevation, and the corresponding absolute elevation is 8.100m. The marked elevation of each floor is the elevation of the finished building surface, except that the roof is the elevation of the structural surface. The design reference period of the engineering structure is 50 years, the design service life is 50 years, the structural safety level is Level II, and the design level of the building pile foundation is Level C. The fire protection of buildings is classified as Grade II, and the fire resistance rating is Grade II. The waterproof grade of underground works is Grade III.
  • Supervision planning of housing decoration works model (Flow chart)
    Quality supervision, progress control, investment control in the construction phase of the project (measurement, measurement and certification of original data of quantities; review of technical and economic aspects of the project contact list and technical verification sheet; review of the authenticity and effectiveness of the full set of settlement data submitted by the construction unit), organization and coordination, contract management, information management and supervision of safe and civilized construction. Including water supply and drainage, HVAC, fire protection, strong current, weak current, etc; Decoration and other supervision work.
  • Highway engineering supervision planning of a company model
    1、 Project name (full name of supervision project) II. Route direction (copied from design drawings, starting and ending mileage, and total length) III. Main technical standards (copied from design drawings) IV. Main quantities of works (copied from design drawings) V. Project construction environment and project characteristics (description of design drawings, analysis and summary through site survey and familiarity with design drawings) 6、 Key points and difficulties of the project (description of design drawings and analysis and summary through site survey and familiarity with design drawings)
  • Supervision Planning of Tianjin Chenda Engineering Supervision Company model
    Foundation and foundation; Main structure; Building decoration; Building roof, building water supply, drainage and HVAC; Building electricity (including weak current); Thermal power
  • Construction procedures and construction supervision rules Supervision planning( model )
    Carry out stand-by and patrol inspection in accordance with the construction procedures and construction supervision rules, inspect and supervise each process and each part throughout the process, so that the quality of all works is always under control. Sign for part or all of the works whose quality meets the requirements of the construction contract, and have the right to require the construction party to rework or take certain technical remedial measures for the processes or works that do not meet the quality requirements to meet the technical requirements of the contract.
  • Supervision planning of power transmission and transformation project model programme
    Treatment of quality accidents of the project: analyze the causes and responsibilities of quality accidents; Review and approve technical measures or schemes for handling engineering quality accidents; To check the effect of treatment measures, the Project Supervision Department can divide the Contractor's nonconformities in the project into three types: treatment, shutdown and emergency treatment, and carry out closed-loop management in strict accordance with the four procedures of proposal, acceptance, treatment and acceptance. The entrusted personnel must track, inspect and implement the nonconformities.
  • A project supervision planning case model Design and construction scheme
    The project contract is a fixed unit price contract, which is based on the cost and bidding documents in the construction contract signed between the construction unit and the construction unit. The project payment and settlement are reviewed according to the current budget quota of construction and installation projects in Beijing and the bidding documents.
  • A case of urban engineering supervision planning model planning scheme
    The requirements of technical documents, contract documents and contract documents adopted in the building energy conservation project of the project on the project shall not be lower than the provisions of Code for Acceptance of Quality of Building Energy Conservation Engineering GB50411-2007.
  • Project supervision planning cases model Design and construction scheme
    The project requires the construction unit to rectify the existing safety problems and hidden dangers within the time limit. If the situation is serious, the construction unit is required to stop work for rectification and report to the construction unit in a timely manner; If the construction unit refuses to rectify or stop construction, it shall report to relevant departments in time.
  • Supervision planning of ancient buildings model design scheme
    Raw materials, components, fittings and equipment of the project shall be executed according to the "Quality Signing Procedure for Raw Materials, Components, Fittings and Equipment", and those requiring retest must pass the retest before use.
  • Engineering construction supervision planning at construction stage (shown in model
    Organize the preparation of the project supervision plan and review and approve the supervision implementation rules; Preside over supervision work meetings such as construction supervision disclosure, issue important documents of the Project Supervision Department, and issue important instructions