Supervision planning of frame structure housing project( model Flowchart)
1.1 Project name: 1.2 Construction site of the project: 1.3 Name of the construction unit Construction unit Survey unit Design unit General contractor Sub contractor Quality supervision organization 1.4 List of basic information of the project Serial number Unit project name Building area (m2) Structure type Floor number Total height (m) Contract price (ten thousand yuan) Construction period (days) Project characteristics of underground and overground 1.5 of foundation main body 1.5.1 Project environment (brief description of regional location, surrounding roads and buildings, underground pipe network, project area, land acquisition, demolition, roads, water and electricity, communication, etc.). 1.5.2 Engineering geological and hydrological conditions (brief description of the site topography and landform given in the survey report). 1.5.3 Architectural design (briefly describe the use function and purpose of each building; plane layout; floor height; elevator setting; fire resistance rating; indoor and outdoor elevations; door and window forms, roof practices, basement, toilet, bathroom waterproofing, external wall insulation practices, etc.). 1.5.4 Structural design (briefly describe the foundation and burial depth; the category of bearing soil layer and the standard value of bearing capacity; the form of main structure; seismic fortification intensity and the seismic grade of components; balcony and staircase structure; floor and roof form; reinforcement grade; reinforced concrete or masonry type and strength grade; masonry mortar strength grade; description of long-span components, etc.). 1.5.5 Building decoration (including decoration practices of different parts of indoor and outdoor walls and indoor floors, plastering, suspended ceilings, doors and windows). 1.5.6 Building roof (including waterproof grade and base course, leveling layer, insulation layer, waterproof layer and detailed structure of roof). 1.5.7 Building water supply and drainage, electrical (including indoor water supply and drainage system, indoor hot water supply system, sanitary ware installation, heating boiler and auxiliary equipment installation; outdoor electrical, power transformation and distribution room, power supply trunk line, electrical power, electrical lighting installation, standby and uninterruptible power supply installation, lightning protection and grounding installation). 1.5.8 Intelligent buildings (including communication network system, office automation system, building equipment monitoring system, fire alarm and fire linkage system, security system, generic cabling system, intelligent integration system, power supply and grounding, environment, intelligent residential (community) system). 1.5.9 Ventilation and air conditioning (including air supply and exhaust system, smoke control and exhaust system, dust removal system, air conditioning system, purification air conditioning system, refrigeration equipment system, air conditioning water system, etc.). 1.5.10 Elevator (installation of selected elevator). 1.5.11 Outdoor works (including outdoor auxiliary buildings, roads, greening, architectural sketches, outdoor electrical, water supply and drainage, etc.). 2. The scope of supervision work shall be in accordance with the scope of supervision agreed in the Contract for Entrusted Supervision of Construction Projects of the Project, including: (referring to the scope of supervision agreed in the contract). 3. The supervision work shall be carried out in accordance with the supervision work scope agreed in the Construction Project Entrustment Supervision Contract. Specific contents: see 8. Contents, procedures, methods and measures of supervision work in the construction stage in this plan for details. 4. Project supervision objectives The project supervision objectives shall be consistent with the overall quality objectives of the company, and dynamic monitoring shall be carried out during the construction process. The project is subject to the quality, construction period and cost objectives determined in the contract signed between the construction unit and the contractor, and the requirements for safety supervision, implementation of national policies and regulations and customer satisfaction are specified