Uploaded on: 2018-05-07 10:40:40 come from: electrical engineering / Electrical construction design / Construction disclosure
zero
4 points

The cushion cap box of non navigable span bridge shall be constructed with prefabricated concrete box, and the top surface of the concrete box shall be installed with wave board. Before the concrete casing prefabrication, the reserved position of the pile hole on the bottom plate of the concrete casing shall be determined according to the measured pile position of the steel casing at each pier, and the concrete casing prefabrication shall be carried out. The wave board is installed on the top surface of the concrete casing and bolted to it. The concrete casing and the wave board are hoisted and lowered by a 200t floating crane as a whole. Hangers are required to be used for hoisting and placed on the top of the steel casing; Then carry out the welding of the boxed back pressure bracket, air bag inflation to stop the water, and seal the gap between the concrete bottom plate and the steel casing through the air bag expansion; After water stop, pump water in the casing box, and then fill the gap again with expansion mortar to ensure no water leakage; In the water free environment, the embedded parts on the concrete floor are welded with the steel casing by connecting steel plates to form a safe dry working environment; Then remove the lifting frame, cut off the steel casing, handle the pile head, bind the reinforcement of the cushion cap, concrete pouring, curing and other work; Finally, remove the wave board on the top of the concrete box. Our project provides the working surface for the installation of casing and the preparation work on site before installation. XX is responsible for the prefabrication and installation of concrete casing until providing the working surface for the construction of cushion cap for our department. Our department starts the construction from cutting the steel casing and breaking the pile head to removing the wave board and other follow-up work. During this period, the anti-corrosion coating of the top surface of the cushion cap and the concrete surface below+6.0m of the pier shaft will be constructed by another unit designated by the owner.

 Technical disclosure for construction of bridge cushion cap of non navigable span of bridge - Figure 1

Technical disclosure for construction of bridge cushion cap of non navigable span of bridge - Figure 1

 Technical disclosure for construction of bridge cushion cap of non navigable span of bridge - Figure 2

Technical disclosure for construction of bridge cushion cap of non navigable span of bridge - Figure 2

 Technical disclosure for construction of bridge cushion cap of non navigable span of bridge - Figure 3

Technical disclosure for construction of bridge cushion cap of non navigable span of bridge - Figure 3

 Technical disclosure for construction of bridge cushion cap of non navigable span of bridge - Figure 4

Technical disclosure for construction of bridge cushion cap of non navigable span of bridge - Figure 4

 Technical disclosure for construction of bridge cushion cap of non navigable span of bridge - Figure 5

Technical disclosure for construction of bridge cushion cap of non navigable span of bridge - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment