The project is called Jiaozhou Convention and Exhibition Center, which is located in the central axis area of the new urban area of Jiaozhou City, starting from Qingdao Road in the north, ending at Macao Road in the south, ending at the west section of Century Avenue in the west, and ending at Ningbo Road in the east.The convention and exhibition center project is a multi-functional large-scale comprehensive public building integrating large-scale government conferences, exhibitions, theaters and business negotiations.The legal person of the project is Jiaozhou Municipal Government Affairs Management Bureau, and the source of funds is BT financing.The exterior wall of the project is composed of light blue glass curtain wall and brick red clay plate curtain wall. Under the sun, it is elegant and simple.The overall design is novel and unique, leading the trend.It is a perfect combination of foresight, landmark, science and technology, and green sustainability, highlighting the local context and customs of Jiaozhou Bay area. When completed, it will become the most beautiful scenery in Jiaozhou City.Therefore, the municipal leaders also attach great importance to it and make it a key project in Jiaozhou in 2011.
Exhibition Center Construction Organization Design Company - Figure 1
Special statement: This material belongs to the sharing uploaded by usersDownloaded content, only for learning, not for commercial use. If there is any copyright problem, please timelycontactStation delete!
The project is called Jiaozhou Convention and Exhibition Center, which is located in the central axis area of the new urban area of Jiaozhou City, starting from Qingdao Road in the north, ending at Macao Road in the south, ending at the west section of Century Avenue in the west, and ending at Ningbo Road in the east.The convention and exhibition center project is a multi-functional large-scale comprehensive public building integrating large-scale government conferences, exhibitions, theaters and business negotiations.The legal person of the project is Jiaozhou Municipal Government Affairs Management Bureau, and the source of funds is BT financing.
1. Project name: Phase I Curtain Wall Project of XX Pharmaceutical City Convention Center2. Project location: High tech Zone of XX Pharmaceutical City3. Construction unit: Taizhou XX Pharmaceutical Investment Co., Ltd4. Construction unit: XX Decoration Engineering Co., Ltd5. Supervisor: Jiangsu Jianke Construction Supervision Co., Ltd[Design sketch of exhibition center]The project is composed of four exhibition areas, permanent exhibition area, office area, exhibition rest area, exhibition service area and other parts through the corridor.The construction area of the project is about 60732m2, and the curtain wall area is about 80000m2. Curtain wall system: glass curtain wall, aluminum plate curtain wall and other systems.
The external decoration area of the project is about 47000 square meters, the total building height is 43.5 meters, the number of floors is 1 underground, and the standard floor height is 5 meters.The whole building structure is reinforced concrete frame shear structure, and local steel structure.
An international convention and exhibition center project is located in a city's high-tech development zone, north of Plaza Road, south of Plaza Ring Road.D and E of the project are exhibition halls, of which E is a special exhibition hall.All exhibition halls are equipped with mezzanine on the north side, which is mainly used for office and equipment rooms.The traffic organization, layout management and internal staff entrance of the project will enter the exhibition center from the North South platform.There is a large parking lot on the south side of the basement 1. Vehicles and other vehicles are from the north side of the basement 1. There is a special cargo passage and loading and unloading platform. The entrance for internal staff is from the north and south platform to the exhibition center.There is a large parking lot on the south side of the Basement 1, and vehicles directly enter the exhibition center from the Basement 1.In addition, there are auxiliary entrances on the east and west sides, and circular fire lanes around the building.
According to the characteristics and site conditions of the project, our company plans to use premixed commercial concrete and pumping concrete technology for construction. During the construction, according to the floor height and construction season, concrete pumping agent, water reducing agent and other admixtures are reasonably selected. Through strict proportioning and quality control, our company's self-made boom feeding system is used to cooperate with the concrete delivery pump to make the construction smooth and fast,The operation is convenient and labor-saving.
An international convention and exhibition center project is located in a city's high-tech development zone, north of Plaza Road and south of Plaza Ring Road.D and E of the project are exhibition halls, of which E is a special exhibition hall.All exhibition halls are equipped with mezzanine on the north side, which is mainly used for office and equipment rooms.The traffic organization, layout management and internal staff entrance of the project will enter the exhibition center from the North South platform.There is a large parking lot on the south side of the basement 1. Vehicles and other vehicles are from the north side of the basement 1. There is a special cargo passage and loading and unloading platform. The entrance for internal staff is from the north and south platform to the exhibition center.There is a large parking lot on the south side of the Basement 1, and vehicles directly enter the exhibition center from the Basement 1.In addition, there are auxiliary entrances on the east and west sides, and circular fire lanes around the building.
The water system adopts double pipe system, that is, the same pipe system is used in winter and summer, and the cooling water temperature is 32 ℃ - 37 ℃.The refrigerator room is located on the ground floor, and the cooling tower is located on the roof of the apartment.The air conditioning water system is divided into three branches, namely, podium, apartment and office.
The building is equipped with three gas direct fired engines, with a single refrigerating capacity of 630RT (2215Kw), heating capacity of 1853Kw, refrigerant parameters of 7-12 ℃, and heat medium parameters of 60-55.8 ℃.There are three cooling towers for chilled water pump and cooling water pump respectively.The water system adopts double pipe system, that is, the same pipe system is used in winter and summer, and the cooling water temperature is 32 ℃ - 37 ℃.The refrigerator room is located on the ground floor, and the cooling tower is located on the roof of the apartment.The air conditioning water system is divided into three branches, namely, podium, apartment and office.
The project adopts full frame structure, and the floor slab is cast-in-place concrete slab.The wall adopts ceramsite concrete block wall.The foundation is a pile cap structure, and the buried depth of the foundation is 1.2M.
An international convention and exhibition center project is located in a city's high-tech development zone, north of Plaza Road and south of Plaza Ring Road.D and E of the project are exhibition halls, of which E is a special exhibition hall.All exhibition halls are equipped with mezzanine on the north side, which is mainly used for office and equipment rooms.The traffic organization, layout management and internal staff entrance of the project will enter the exhibition center from the North South platform.
Our company implements policy and objective management for the project, and formulates overall policy and objectives according to the commitment to the owner, such as quality policy, construction period goal, safe and civilized construction goal, etc.The Project Management Department makes corresponding decisions according to the company's policies and objectives.
An international convention and exhibition center project is located in a city's high-tech development zone, north of Plaza Road, south of Plaza Ring Road.D and E of the project are exhibition halls, of which E is a special exhibition hall.All exhibition halls are equipped with mezzanine on the north side, which is mainly used for office and equipment rooms.The traffic organization, layout management and internal staff entrance of the project will enter the exhibition center from the North South platform.There is a large parking lot on the south side of the basement 1. Vehicles and other vehicles are from the north side of the basement 1. There is a special cargo passage and loading and unloading platform. The entrance for internal staff is from the north and south platform to the exhibition center
(1) An international convention and exhibition center project is located in a city's high-tech development zone, north of Plaza Road and south of Plaza Ring Road.D and E of the project are exhibition halls, of which E is a special exhibition hall.All exhibition halls are equipped with mezzanine on the north side, which is mainly used for office and equipment rooms.The traffic organization, layout management and internal staff entrance of the project will enter the exhibition center from the North South platform.There is a large parking lot on the south side of the basement 1. Vehicles and other vehicles are from the north side of the basement 1. There is a special cargo passage and loading and unloading platform. The entrance for internal staff is from the north and south platform to the exhibition center.There is a large parking lot on the south side of the Basement 1, and vehicles directly enter the exhibition center from the Basement 1.In addition, there are auxiliary entrances on the east and west sides, and circular fire lanes around the building.
This document is the construction organization design (progress bar chart) of [Jiangsu] Frame Structure Convention and Exhibition Center. Its contents are authentic and reliable, and can be used as a reference for designers.
An international convention and exhibition center project is located in a city's high-tech development zone, north of Plaza Road and south of Plaza Ring Road.D and E of the project are exhibition halls, of which E is a special exhibition hall.All exhibition halls are equipped with mezzanine on the north side, which is mainly used for office and equipment rooms.The traffic organization, layout management and internal staff entrance of the project will enter the exhibition center from the North South platform.There is a large parking lot on the south side of the basement 1. Vehicles and other vehicles are from the north side of the basement 1. There is a special cargo passage and loading and unloading platform. The entrance for internal staff is from the north and south platform to the exhibition center.
According to the characteristics of the project, the project management organization is composed of three levels: command and decision-making level, project management level and construction operation level.
The safety level of the building structure of the project is Level I, the design service life of the structure is 50 years, and it is set according to six degree seismic measures. The project uses cast-in-place reinforced concrete column slab structure, and the seismic level of the frame is Level IV.The foundation design grade of the project is Grade A, the safety grade of building pile foundation is Grade II, and the waterproof grade of underground works is Grade II.
The comprehensive management center is 1115 tons, and the convention and exhibition center is 1305 tons. The whole structure is frame structure, and the two buildings are three storey structures.The comprehensive management center covers an area of 7897.5 square meters, and the exhibition center covers an area of 8001 square meters.The structural type is column beam frame, and the steel column is H-shaped column.The comprehensive management center has three floors, and the exhibition center has a three floor structure.The main material of the structure is Q345 steel, the floor is a composite floor structure, and the roof and wall are paved with insulation boards.
The Convention and Exhibition Center has a superior geographical location and convenient transportation. It is about 1km away from the downtown of xxx in the south, 3km away from Xingang Wharf of xxx in the east, 3km away from xx Wharf in the west and xx in the westThe railway channel Haikou Station and the automobile ferry terminal are more than 10 kilometers long, and both are connected by Haikou Binhai Avenue and its extension lines, which are 60 meters and 50 meters long. In addition, the urban secondary trunk roads are planned and constructed on the east and north sides of the Convention and Exhibition Center, which is conducive to the traffic organization of people and vehicles.The project is a class I large public building with a total construction area of 70000 square meters. It is planned to be implemented in three phases as required.The construction scale of Phase I is 1000 international standard booths, with a construction area of 25000 square meters.This bidding is a phase I project, with a total land area of 4.14 hectares.
The project covers an area of 9000 square meters, and the installed building area is 67373 square meters. The second and third floors of the underground are garage, the first floor of the underground is catering and equipment room, the third floor of the podium above the ground is exhibition and conference room, the building area of the podium is 41273 square meters, and the upper part of the podium is two towers and apartments and office buildings. The total height of the apartment buildings is 65 meters,The building area is 11100 square meters, the total height of some office buildings is 82 meters, the building area is 15000 square meters, and the underground three floors are part of the civil air defense.
Construction organization design before technical bid for office building decoration worksDoc office building decoration engineering construction organization design before technical bidDoc office building decoration engineering construction organization design before technical bidDoc
The exhibition center project is located in the east of XX City, adjacent to National Highway 330 in the west, close to the second phase of XX, with the Municipal People's Hospital in the north and XX Road in the south. The surrounding traffic is convenient, the supporting facilities are complete, and the landscape conditions are good. It is developed by XX Group Co., Ltd.The total building area is 161699.2m2,The aboveground area is 153777.8 ㎡, and the underground area is 7921.4 ㎡. It is composed of the license building, 1 # - 5 # areas and the lobby, which is distributed symmetrically from east to west. The license building has one floor underground and eight floors above the ground, with a building height of 31.4 meters. 1 # - 5 # areas are two floor exhibition halls, with mezzanine floors in some parts. The roof cornice is 23.9 meters high. The lobby is equipped with a floor of civil air defense basement, which is usually a parking garage,The first floor is mainly the lobby, the second floor is the podium, the third floor is the information release hall, the fourth floor is the multi-function hall, and the height of the cornice above the ground is 23 meters
The building is equipped with three gas direct fired engines, with a single refrigerating capacity of 630RT (2215Kw), heating capacity of 1853Kw, refrigerant parameters of 7-12 ℃, and heat medium parameters of 60-55.8 ℃.There are three cooling towers for chilled water pump and cooling water pump respectively.The water system adopts double pipe system, that is, the same pipe system is used in winter and summer, and the cooling water temperature is 32 ℃ - 37 ℃.The refrigerator room is located on the ground floor, and the cooling tower is located on the roof of the apartment.The air conditioning water system is divided into three branches, namely, podium, apartment and office.The air conditioning building area of the project is 48425 square meters, with a total cooling load of 6424 kilowatts and a total heating load of 5460 kilowatts.The cold and heat index of unit building area is 95w/m2, and the cold and heat index of unit air conditioning area is 132w/m2.
This document is the steel structure construction organization design of an exhibition center (the Great Wall Cup). The content of the document is detailed and the data can be used for reference.
In order to ensure the quality of installation and construction of glass curtain wall, it is required that the main works of steel structure, reinforced concrete structure and brick concrete structure for installation of curtain wall should meet the requirements of relevant structural construction and acceptance specifications.
(1) An international convention and exhibition center project is located in a city's high-tech development zone, north of Plaza Road and south of Plaza Ring Road.D and E of the project are exhibition halls, of which E is a special exhibition hall.All exhibition halls are equipped with mezzanine on the north side, which is mainly used for office and equipment rooms.The traffic organization, layout management and internal staff entrance of the project will enter the exhibition center from the North South platform.There is a large parking lot on the south side of the basement 1. Vehicles and other vehicles are from the north side of the basement 1. There is a special cargo passage and loading and unloading platform. The entrance for internal staff is from the north and south platform to the exhibition center.There is a large parking lot on the south side of the Basement 1, and vehicles directly enter the exhibition center from the Basement 1.In addition, there are auxiliary entrances on the east and west sides, and circular fire lanes around the building.(2) The project adopts full frame structure, and the floor slab is cast-in-place concrete slab.The wall adopts ceramsite concrete block wall.The foundation is a pile cap structure, and the embedded depth of the foundation is 1.2M. (3) The decoration works of this project are granite and glass curtain walls for the exterior wall, mortar tile surface course for the interior wall, mixed mortar latex paint surface course, and marble surface course.The floor is marble floor, floor tile floor, cement mortar leveling carpet and other floors.The ceiling is made of light steel keel gypsum board, mixed mortar emulsion paint surface, aluminum alloy square board, etc.(4) Installation works include water supply (aluminum plastic composite pipe), drainage, heating, strong and weak electricity, fire protection, ventilation, air conditioning, elevator, etc.
The total construction area is 83317 square meters, with one underground floor and two above ground floors, including 26590 square meters underground and 56727 square meters above ground.Structural form: the main body is reinforced concrete frame structure, the roof is a steel spherical grid structure, and the steel roof area is about 30000 square meters.
At present, the company has more than 500 employees, of which 35% are medium and senior technicians.It has a total assets of 600 million yuan, an area of 160 mu, and a building area of more than 55000 square meters. It has a number of advanced light and heavy steel, pipe truss, grid and metal enclosure production lines at home and abroad, with an annual production capacity of 60000 tons.The company has the first grade professional contracting qualification for steel structure engineering, the first grade qualification for steel structure engineering design, the first grade qualification for Chinese steel structure manufacturing enterprises, and the provincial second grade physical and chemical test qualification. It has passed the certification of three systems of quality, environment, occupational health and safety management, and is committed to the designFabrication and installation.
This information is the construction organization design scheme of the ventilation and air conditioning of the exhibition center, which is detailed and can be used for reference.
This information is the construction organization design of Nanbu County Commercial Performance Film and Television Convention and Exhibition Center for reference.
The air conditioning building area of the project is 48425 square meters, with a total cooling load of 6424 kilowatts and a total heating load of 5460 kilowatts.The cold and heat index of unit building area is 95w/m2, and the cold and heat index of unit air conditioning area is 132w/m2.
The total construction area of the project is 14166 square meters, and the total height is 12.4 meters. The organization type is the steel frame structure in the exhibition area, and the office area is the frame structure. The building durability is five years, and the number of floors above the ground is three.The building consists of three floors of office building, exhibition area of Hall A and exhibition area of Hall B.
1. Project construction overview Project name Project location Construction unit Design unit Supervision unit Construction unit 2. Project overview Project planning land area is 51.8 hectares, with a total construction area of about 976300 square meters, mainly composed of exhibition center, conference center, sightseeing complex, five-star hotel, business and office, apartments and other sub projects,After completion, it will be the largest multi-functional international convention and exhibition center with the most complete functions and the most advanced facilities in southwest China.C1 Conference Center is a sub project of the International Convention and Exhibition Center. It is a civil public building, with two large conference halls of 3500 people, one international conference hall with simultaneous translation function, several small conference rooms, business negotiation rooms, VIP rooms and an international first-class performance hall. It is located near the south side of Yingbin Road, with a land area of about 14400 square meters and a building area of about 67800 square meters.