Prestress of cable-stayed bridge concrete Construction scheme of cast-in-place box girder
The project of XX East Avenue (XX Bridge - XX Section) starts from XX Bridge in the north, crosses XX Bay in the south, and connects with the planned XX Road, with a total length of 3.66Km, a municipal Class I main road, and a road width of 40m. XX Bridge has a total length of 1430m (482.5+345+602.5). This section includes the main bridge of XX Bridge 345m long, the south approach bridge 602.5m long, the subgrade connection approach road 810m long, two-way six lane, and the bridge width 34m. The starting and ending stakes of the project are K2+022.50 ~ K3+780.00 (including 12 # pier and foundation), with a total length of 1757.50m. Main bridge: the main bridge is a cable-stayed bridge with single tower and single cable plane hybrid beam. The main bridge structure system adopts the tower, beam and pier consolidation system, with a length of 345m, and the span arrangement is (60+65+220) m, of which the main span is 220m long, the side span is 125m long, and the side span is equipped with an auxiliary pier. The pile foundation of the main pier is 16 bored piles with a diameter of 2.5m, and the size of the rectangular cushion cap is 2465cm (length) × 2050cm (width) × 500cm (thickness). The lower tower pier adopts a single box double chamber section, and the pier top section is 800cm wide horizontally and 1252cm long longitudinally; The cross section at the bottom of the pier is 1650cm in transverse width and 1905cm in longitudinal length. The upper tower column is of reinforced concrete structure with box section, the tower height is about 98m (above the bridge deck), the tower top elevation is+123.377m, and the longitudinal inclination angle is 75o. The side span concrete beam is a single box three room section, which is provided with longitudinal, transverse and vertical prestressed tendons. The main span steel beam is a fully welded steel box beam structure. The steel concrete junction surface is located in the main span, 10.75m away from the tower center, and the junction section is 2.0m long. The stay cables are arranged in the central separation strip with a single cable plane, and two stay cables are used in the transverse direction of the bridge, of which 8 pairs of cables are arranged in the side span and 15 pairs of cables are arranged in the main span. 12 # and 15 # transition pier foundations are 12 bored piles with diameters of 2.2m and 1.5m, rectangular cushion caps, and vase type plate piers; The foundation of 13 # auxiliary pier is composed of 4 bored piles with a diameter of 1.8m, rectangular cushion cap and vase type plate pier. South approach bridge: the approach bridge is a 5-link (3 × 40) m prestressed concrete continuous box girder, separated left and right bridges, with a single bridge width of 14.55. The lower part adopts reinforced concrete vase plate pier, rectangular cushion cap and bored pile foundation. Approach road works: chainage K2+970.00~terminal K3+780.00, 810m long.