Construction of subgrade slope protection for high-speed railway engineering programme (CCCC)
The XX passenger dedicated line project contracted by the Second Work Area of the Project Management Department of XX Section of XX Passenger Dedicated Line of XX Public Transport Bureau is located in the middle east of XX Province, passing through two prefecture level cities (XX City, XX City), four towns (XX Town, XX Town, XX Tun Town XX Town), the starting and ending mileage of the line is changed to XX12+036.7-XX36+638.12 (including two sections of subgrade changed to XX369+400 - XX369+330.74 and XX7+941.65 - XX8+311.82), the total length of the line is about 25km, and it is a comprehensive section of bridges, stations, tunnels and subgrade. The subgrade construction sites undertaken in this work area include the following subgrade sections: XX369+330.74 - XX369+400.00, XX7+942.84 - XX8+371.03, XX12+036.7 - XX13+997.27, XX18+820.69-XX21+920.91, XX24+817.81-XX26+142.5, XX26+695.5 - XX26+980.6, XX33+056.37-XX34+730 (incomplete drawings), XX36+440-XX36 +638.18。 Slope protection mainly adopts plant protection, cast-in-place arch skeleton, prefabricated hexagonal hollow block and anchor bolt frame protection. Main quantities of subgrade slope protection: 43696m3 of arch skeleton cast-in-situ C25 concrete, 2016 m3 of C25 concrete precast blocks, 695 m3 of C30 anchor bolt frame cast-in-situ concrete, 758157 Amorpha fruticosa trees, and 9400m2 of grass planting.