Uploaded on: 2018-04-17 09:41:36 come from: Architectural design / Chinese ancient architecture / Antique architecture
zero
3.96 points

XX Bridge is located in XX across the Beijing Hangzhou Canal. The original bridge, built in 1997, is an important channel for XX overpass and XX vehicles to enter the urban area, with a large flow of motor vehicles and non motor vehicles; There is a Class V access channel under XX bridge, with dense traffic. The main bridge is composed of three bridges: the south side auxiliary road bridge, the middle motor vehicle road bridge, and the north side auxiliary road bridge. The superstructure of the main bridge adopts prestressed reinforced concrete three span continuous variable section box girder, with a span of 32m+58m+32m.

 Demolition scheme of prestressed reinforced concrete auxiliary road bridge - Figure 1

Demolition scheme of prestressed reinforced concrete auxiliary road bridge - Figure 1

 Demolition scheme of prestressed reinforced concrete auxiliary road bridge - Figure 2

Demolition scheme of prestressed reinforced concrete auxiliary road bridge - Figure 2

 Demolition scheme of prestressed reinforced concrete auxiliary road bridge - Figure 3

Demolition scheme of prestressed reinforced concrete auxiliary road bridge - Figure 3

 Demolition scheme of prestressed reinforced concrete auxiliary road bridge - Figure 4

Demolition scheme of prestressed reinforced concrete auxiliary road bridge - Figure 4

 Demolition scheme of prestressed reinforced concrete auxiliary road bridge - Figure 5

Demolition scheme of prestressed reinforced concrete auxiliary road bridge - Figure 5

Click to download the source file now

Special statement: This material belongs to the sharing uploaded by users Downloaded content, only for learning, not for commercial use. If there is any copyright problem, please timely contact Station delete!

Collection
share

WeChat code scanning and sharing

Click to share

Click to see more
All comments I want to comment
No comment