QC Results of Installation Quality of Gas Power Generation Grid connected Equipment
Gas power generation project is the key project of the Group in 2010. According to the requirements of the strategic objective of "five transformations and one promotion" of XX Group, the XX comprehensive development project integrating oil refining and power generation is a key project invested and constructed by the Group Company. While ensuring the normal production of oil shale refining, the project will collect the released gas and use gas combustion engines to burn and generate electricity. In addition to supplying power consumption in the plant area, the surplus electricity will be connected to the grid. In order to meet the demand for access to the grid, it is decided to upgrade the 35kV electrical equipment of XX substation after study. But as a project, on the one hand, early production can fill the shortage of the current market, on the other hand, it also brings certain economic benefits to the group company. However, the key to the installation and construction of electrical equipment is the progress and quality. In principle, the progress shall be carried out according to the original construction organization plan, and the site conditions are constantly changing, such as material supply, design change, etc., which cannot be modeled, and must be adjusted and arranged according to the actual situation. Whether the construction quality can be guaranteed or not, the most important thing is to complete each process in strict accordance with the requirements of relevant national specifications and standards, and it is strictly prohibited to cut corners. The "three inspection" system must be implemented, that is, self inspection, special inspection and joint inspection. The next process can be started only after passing the inspection and acceptance, so as to ensure the quality of the whole project.