Frame structure financial center High support construction scheme of the project
Project name Geographic location Construction unit Supervision unit Design unit Construction unit 2.2 Project site overview XX International Financial Center XX International Hotel Project (Phase I) is located at No. s574 Yingmen Beach, northwest corner of Anning Yintan Bridge, Lanzhou City, on the bank of the Yellow River, adjacent to Lanzhou Wetland Park, with a total construction area of 246100 square meters, including 77000 square meters underground, About 169100 square meters above the ground, including 120000 square meters of construction area in Phase I, 35500 square meters underground and 845 square meters above the ground. The Phase I and Phase II foundation pit works of the project are excavated at the same time, and the edge of the foundation pit is 1.5m away from the red line of the land. The west and north sides of the foundation pit are close to the traffic road, the south side is close to the municipal works, and the east side is close to the construction site of Beijing urban construction. The temporary office buildings cannot be erected on the flat ground, so the temporary buildings are erected by the method of steel pipe formwork.