Special safety construction of tall formwork works programme (2010)
**The first phase of the project is located in Huancheng West Road, * * District, Xiamen City. The structure type is a frame shear wall structure. The first phase of the project consists of three towers in the upper part and an overall basement in the lower part, with a total construction area of 84864 m2, including one basement floor, with a construction area of 28000 m2; There are 30 floors of 2 # building above the ground. The first floor is 3.5m high. From the second floor, the floor heights are 2.9m, 2.8m, 2.9m, 2.9m, 2.8m, 2.9m... The building height is 91 6m, with a building area of about 18108m2; Building 3 # has 30 floors, and the first floor is 3.5m high. From the second floor, the first floor is 2.9m, 2.8m, 2.9m, 2.9m, 2.8m, 2.9m... The building height is 89.5m, and the building area is about 17793m2; Building 4 # has 31 floors. The first floor is 5.2m high. From the second floor, the first floor is 2.9m, 2.8m, 2.9m, 2.8m, 2.9m, 2.8m... The building height is 95m, and the building area is about 21827m2. The construction unit is * * Co., Ltd., the survey unit is * * Engineering Survey Institute, the design unit is * * Design Group Co., Ltd., the supervision unit is * * Engineering Consulting Management Co., Ltd., and the construction unit is * * Group Corporation.